Reedy Creek Greenway
Greenway in North Carolina · OpenStreetMap relation
Runs through Charlotte · Mecklenburg County
Conditions now
Loading the weather near Cary…
Forecast by the National Weather Service for Cary · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Edwards Mill Road mile 0 directions to trailhead 1
- Parking directions to trailhead 2
Plan your visit
- By trainAmtrak: North Carolina State Fair, NC (NSF) 1.5 mi from the trail; Amtrak: Cary, NC (CYN) 1.8 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The Reedy Creek Greenway is a paved greenway in northeast Charlotte, North Carolina, built by Mecklenburg County to connect the surrounding neighborhoods with Reedy Creek Park and Nature Preserve. It is not a rail-trail. The county describes a 10-foot-wide trail about 3.25 miles long, from Rocky River Road to Plaza Road Extension; a section along Plaza Road Extension was built with Charlotte Water's WT Harris/Plott Road water main project. The work was funded through the county's FY2020 capital improvement plan and designed to protect the area around Reedy Creek, where a stream restoration was completed in spring 2019.
Construction ran from February 2024 to summer 2025, and in a September 2026 update the county reported the trail complete and open to the public. Pedestrian access points are at Grier Road, Rocky River Road, Plott Road and Vermillion Drive. In April 2026 a historical marker and reflection area in remembrance of Willie McDaniel, placed with the Charlotte-Mecklenburg Remembrance Project, was completed beside the greenway inside the nature preserve. Bicycle and pedestrian crossings of Plaza Road Extension were expected by fall 2026, wayfinding signs by fall or winter 2026, and a grand opening ceremony in spring 2027.
This record maps about 2.5 miles in Charlotte, in three pieces: from Grier Road near Selwyn Landing Drive south and east to Plaza Road Extension near Frank Grier Road, with a branch north toward Reedy Creek Park Road. Because it is built from the OpenStreetMap name, the record also picks up two unrelated scraps about 115 miles away in Wake County: a sidewalk of about 0.1 mile in Cary and a point near Edwards Mill Road in Raleigh.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
65% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to May and September to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Concord, 20.8 km from the trail's middle, 14 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 53 57 64 74 81 88 92 90 84 74 64 56 Low °F 29 31 38 47 56 65 69 67 60 48 37 32 Precipitation, in 3.7 3.1 4.1 4 3.7 4.7 5.3 4.5 4.2 3.5 3.5 3.5 Snow, in 1.1 1.3 0.4 0 0 0 0 0 0 0 0 0.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1941 Charlotte sheet (1:125,000); the 1949 Harrisburg sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
1 Reddit thread about this trail, Apr 2026
- North CLT to Uptown r/CLT_Cyclists · Apr 2026 · 10 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Reedy Creek Trail within 0.2 mi · 5.3 mi, paved
- Black Creek Greenway within 0.2 mi · 6.9 mi, paved
- House Creek Trail 1.3 mi away · 3.2 mi, paved
- Crabtree Creek Greenway 1.4 mi away · 4.0 mi, paved
- Cross Charlotte Trail 1.5 mi away · 22.3 mi, paved
- South Turkey Creek Trail 1.5 mi away · 1.7 mi, gravel
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 18397563, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Reedy Creek Greenway: Rocky River Rd. to Plaza Rd. Ext. — Mecklenburg County Park and Recreation (PublicInput) · web · checked Oct 16, 2026 Supports: Mecklenburg County project; about 3.25 miles, 10-foot paved trail, Rocky River Road to Plaza Road Extension; Plaza Road Extension section built with Charlotte Water's WT Harris/Plott Road Water Main Project; connects community to Reedy Creek Park and Nature Preserve; FY2020 CIP funding; stream restoration spring 2019; construction February 2024 to summer 2025; September 2026 update: complete and open; access at Grier Road, Rocky River Road, Plott Road and Vermillion Drive; Willie McDaniel marker and reflection area with the Charlotte-Mecklenburg Remembrance Project completed April 2026; Plaza Road Extension crossings fall 2026; wayfinding fall/winter 2026; grand opening spring 2027
- Reedy Creek Greenway (relation 18397563) — OpenStreetMap · web · checked Oct 16, 2026 Supports: this record's map line: about 2.5 miles in three pieces in Charlotte near Grier Road, Plaza Road Extension and Reedy Creek Park Road; stray same-name sidewalk in Cary and point near Edwards Mill Road, Raleigh
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.