States › Alabama

BMRR South Trail

Greenway in Alabama

Runs through Birmingham · Jefferson County

Conditions now

Loading the weather near Birmingham…

Forecast by the National Weather Service for Birmingham · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.5 mi 4.0 km1
Surface
Crushed stone1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Red Mountain Park, beside the trail (opens in a new tab)
Red Mountain Park, beside the trail · Photo: Swimcoach2! · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The BMRR South Trail is a multiuse trail in Red Mountain Park, which covers more than 1,500 acres along the Red Mountain ridge a few minutes from downtown Birmingham, Alabama. Jefferson County Greenways lists the trail at 2.43 miles, rated easy, marked in brown, with only 60 feet of elevation gain. The organization says every trail in the park is multiuse and asks riders to keep hikers in mind; the park counts more than 18 miles of hiking and biking trails.

Red Mountain Park was assembled from land that U.S. Steel had used for ore mines; the last mine closed in 1971. Planning for a park began by 2004, the Alabama Legislature put the Red Mountain Greenway and Recreational Commission in charge of it as a state agency in 2007, and the park opened to the public in 2012. In OpenStreetMap the trail, numbered 3, runs about 2.5 miles across the park from its southwest corner northeast to a point near the eastern end of the BMRR North Trail, which has its own page. Most of it is mapped as a compacted-surface shared path, and its short final stretch as a dirt footpath.

Cars park at the two entrances: 2011 Frankfurt Drive, the main entrance, which has accessible restrooms, a pavilion and a water fountain, and 2019 Venice Road. Neither parking nor admission costs anything. Dogs must be leashed on the trails, and visitors are asked to bring drinking water, since there is no running water away from the Frankfurt Drive facility. The park has three bike repair stations.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

76% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February, May and October to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Birmingham Airport, 17.4 km from the trail's middle, 34 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F545967758288919186766557
Low °F353845526168727165544338
Precipitation, in555.75.14.94.85.44.343.34.24.9
Snow, in0.40.30.5000000000.2
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Bessemer sheet (1:125,000); the 1959 Birmingham South sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Trails — Jefferson County Greenways · organization · checked Oct 16, 2026
    Supports: BMRR South Trail, Red Mountain Park, 2.43 miles, easy, brown markings, 60 ft elevation gain, multiuse
  3. Red Mountain Park — Jefferson County Greenways · organization · checked Oct 16, 2026
    Supports: more than 1,500 acres along the Red Mountain ridge minutes from downtown Birmingham; over 18 miles of hiking and biking trails; all trails multiuse, keep hikers in mind; entrances at 2011 Frankfurt Drive (main, accessible restrooms, pavilion, water fountain) and 2019 Venice Road; no parking or admission fee; dogs leashed; bring drinking water; three bike repair stations
  4. Red Mountain Park — Wikipedia · organization · checked Oct 16, 2026
    Supports: former U.S. Steel ore-mine land, last mine closed 1971; planning by 2004; commission made a state agency in control of the park in 2007; opened to the public in 2012
  5. OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 16, 2026
    Supports: record's map line, about 2.5 miles, ref 3; compacted shared path with a short dirt footpath at the east end; position relative to the BMRR North Trail

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.