Enon Ridge Trail
Rail-trail in Alabama
Runs through Birmingham · Jefferson County
Conditions now
Loading the weather near Birmingham…
Forecast by the National Weather Service for Birmingham · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
Plan your visit
- By trainAmtrak: Birmingham, AL (BHM) 1.3 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Dorothy Spears Greenway, now known as the Enon Ridge Trail, is a paved path of about 1.07 miles on the west side of Birmingham, Alabama, close to downtown in the East Thomas and Smithfield area. It is part of the Red Rock Trail System, a planned network of trails, sidewalks and bike lanes across Jefferson County that the Freshwater Land Trust supports. In March 2018 the Dynamite Hill-Smithfield Community Land Trust adopted the whole trail as the first group in the land trust's Adopt-a-Trail program, committing to two hours of trail work every other month for a year along with beautification and planting projects.
The trail starts at East Thomas Park, 1404 3rd Street West, where there are parking and restrooms, and curves along Old Bankhead Highway past a Jewish cemetery; the mapped line continues southeast toward Smithfield. Most of the line is mapped on an abandoned rail right-of-way.
The pathway is asphalt and largely shaded, with Red Rock Trail System signs at the start. In 2022 the Freshwater Land Trust used a Jefferson County Commission community grant to place two ADA-compliant benches and new signage on the trail.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
46% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February, May and October to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Birmingham Airport, 9.3 km from the trail's middle, 4 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 54 59 67 75 82 88 91 91 86 76 65 57 Low °F 35 38 45 52 61 68 72 71 65 54 43 38 Precipitation, in 5 5 5.7 5.1 4.9 4.8 5.4 4.3 4 3.3 4.2 4.9 Snow, in 0.4 0.3 0.5 0 0 0 0 0 0 0 0 0.2 - Old maps
USGS topographic maps of the trail's middle go back to the 1889 Birmingham sheet (1:125,000); the 1959 Birmingham North sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFreshwater Land Trust (Red Rock Trail System)
Nearby trails
- Kiwanis Vulcan Trail 2.5 mi away · 2.0 mi, paved
- BMRR North Trail 4.3 mi away · 2.5 mi, surface unknown
- BMRR South Trail 4.4 mi away · 2.5 mi, crushed stone
- Shades Creek Greenway (Lakeshore Trail) 4.4 mi away · 3.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Adopt-a-Trail: Dynamite Hill-Smithfield Community Land Trust — Freshwater Land Trust (March 26, 2018) · organization · checked Oct 16, 2026 Supports: Enon Ridge Trail 1.07 miles; Red Rock Trail System; Dynamite Hill-Smithfield Community Land Trust first Adopt-a-Trail group; two hours of trail work every other month for one year; beautification and planting projects
- 2022 Annual Report — Freshwater Land Trust · organization · checked Oct 16, 2026 Supports: benches and signage installed along the Enon Ridge and High Ore Line trails in November 2022
- NEW seating + signage installed on Red Rock Trail System in Birmingham — Bham Now (January 3, 2023) · web · checked Oct 16, 2026 Supports: two ADA-compliant benches on the Enon Ridge Trail in Smithfield; Jefferson County Commission Community Grant in District Two; trail signage
- Enon Ridge Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 16, 2026 Supports: alternately called the Dorothy Spears Greenway; Red Rock Trails network across Jefferson County; shaded, near downtown in East Thomas; curves between East Thomas Park and the Jewish cemetery along Old Bankhead Highway; former Enon Ridge streetcar right-of-way; asphalt; Red Rock signage; parking and restrooms at East Thomas Park, 1404 3rd Street West
- Dorothy Spears Greenway — OpenStreetMap way 664879747 · web · checked Oct 16, 2026 Supports: alt_name Enon Ridge Trail; length 1.07 mi; ways tagged as an abandoned railway; southeastward extent of the mapped line
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.