Boggy Creek Trail
Greenway in Texas · OpenStreetMap relation
Runs through Austin · Travis County
Conditions now
Loading the weather near Austin…
Forecast by the National Weather Service for Austin · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Miriam Avenue mile 0.2 directions to trailhead 1
- Parking at Nile Street mile 1.3 directions to trailhead 2
- Parking at Webberville Road mile 1.4 directions to trailhead 3
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Boggy Creek Trail is an urban trail of about 1.4 miles along Boggy Creek in East Austin, Texas, running from Webberville Road at Zaragosa Street north past Rosewood Avenue and East 12th Street to Alexander Avenue. It is a creek greenway, not a rail-trail; OpenStreetMap names its paths the Boggy Creek Greenbelt Trail and groups them as a local bicycle route called the Boggy Creek Trail.
In 2019 Austin Public Works, Austin Transportation and the Parks and Recreation Department proposed building a 12-foot-wide paved trail beside the existing 6-foot sidewalk between Rosewood Avenue and East 12th Street, so that people walking would be separated from people on bicycles and other wheeled devices. Construction of that section, described as Austin's first dual-track trail, was complete by February 2021. The section is part of the planned EastLink and Red Line trails and filled the last gap in its All Ages and Abilities Bicycle Network between the Cherrywood neighborhood and Lady Bird Lake.
OpenStreetMap shows the path as mostly concrete, with fine gravel and asphalt stretches and several bridges; at the north end it shares a stretch with the Red Line Parkway Trail.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Austin Bergstrom Airport, 10.4 km from the trail's middle, 6 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 62 66 73 80 87 93 96 97 91 82 72 64 Low °F 38 42 49 56 65 72 73 73 67 57 47 40 Precipitation, in 2.8 1.9 2.9 2.4 5 3.4 2.2 2.5 3 4.2 2.7 2.6 Snow, in 0 0.1 0 0 0 0 0 0 0 0 0 0.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1896 Austin sheet (1:125,000); the 1954 Austin East sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Riders in 2025 and 2026 named the Webberville Road end and the MLK station as starting points; one suggested an out-and-back between them, calling it quiet at times. r/BikingATX, May 2025 · r/Austin, May 2026
- Riders in 2024 reported reaching downtown largely away from traffic by linking the trail to protected lanes on East 12th, Pedernales and 4th Street, or to the Red Line Trail via a backroad section. r/Austin, Feb 2024 · r/Austin, Sep 2024 · r/Austin, Oct 2024
- Three riders in 2025 and 2026 offered separate details: one called it a commuter route, one said walkers tend to end up in the middle of the path, and one found it well lit. r/Austin, Feb 2025 · r/Austin, Oct 2025 · r/Austin, Mar 2026
8 Reddit threads about this trail, Feb 2024 to May 2026
- Haven’t been to the East Austin area close to downtown in years and am super impressed with walkability and non-car centric design. r/Austin · Oct 2024 · 67 comments
- Can Austin Finally Become a Bike-Friendly City? | In car-centric Texas, the capital city is building a cycling utopia by investing millions in new infrastructure. r/Austin · Sep 2024 · 218 comments
- PSA to those riding bicycles and especially e-bikes on the town lake trail and pedestrian zones r/Austin · Feb 2025 · 119 comments
- Best place to walk around in after a break-up r/Austin · May 2026 · 139 comments
- Easy, flat, paved trail for a kid r/BikingATX · May 2025 · 7 comments
- [Serious] What are your favorite NEW Austin things? r/Austin · Feb 2024 · 291 comments
- Night walks in Austin? r/Austin · Oct 2025 · 147 comments
- Retired bike mechanic looking for Austin’s busiest bike paths will work for vibes ✨ r/Austin · Mar 2026 · 82 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Nearby trails
- Red Line Parkway Trail within 0.2 mi · 6.4 mi, paved
- Lance Armstrong Crosstown Bikeway 0.5 mi away · 3.6 mi, paved
- Mueller Trail 0.7 mi away · 3.8 mi, paved
- Ann & Roy Butler Hike and Bike Trail 0.9 mi away · 15.0 mi, paved
- Southern Walnut Creek Trail 1.1 mi away · 9.1 mi, paved
- Shoal Creek Trail 2.2 mi away · 3.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 17471716, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- City proposes widening section of Boggy Creek Trail — Austin Monitor (July 2, 2019) · press · checked Oct 17, 2026 Supports: 2019 proposal; 12-foot-wide paved trail beside the existing 6-foot sidewalk; Rosewood Avenue to East 12th Street; three city departments
- Construction now complete on Austin's first dual-track trail — FOX 7 Austin (February 9, 2021) · web · checked Oct 17, 2026 Supports: dual-track section from Rosewood Avenue to East 12th Street complete; separation of walkers from people biking; Austin Public Works, Austin Transportation and Parks and Recreation; part of EastLink and Red Line trails; final gap in the All Ages and Abilities Bicycle Network between Cherrywood and Lady Bird Lake
- Boggy Creek Trail, relation 17471716 — OpenStreetMap · web · checked Oct 17, 2026 Supports: route name Boggy Creek Trail (local cycle network); member ways named Boggy Creek Greenbelt Trail; concrete, fine gravel and asphalt surfaces; bridges; shared stretch with the Red Line Parkway Trail; extent from Webberville Road at Zaragosa Street to Alexander Avenue
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.