Red Line Parkway Trail
Greenway in Texas · OpenStreetMap relation
Runs through Austin · Williamson and Travis counties
Conditions now
Loading the weather near Austin…
Forecast by the National Weather Service for Austin · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Canterbury Street mile 0 · restrooms · water directions to trailhead 1
- Parking at East Cesar Chavez Street mile 0.1 directions to trailhead 2
- Parking at Rosewood Avenue mile 1.4 directions to trailhead 3
- Parking at Alexander Avenue mile 2.3 directions to trailhead 4
- Parking at Alexander Avenue mile 2.3 directions to trailhead 5
- Parking at North Interstate 35 mile 3.4 directions to trailhead 6
- Parking at North Interstate 35 mile 3.6 directions to trailhead 7
- Parking at Dillard Circle mile 5.5 directions to trailhead 8
- Lot E mile 5.6 directions to Lot E
- Parking at Dillard Circle mile 5.6 directions to trailhead 10
- Parking at Kenniston Drive mile 6.2 directions to trailhead 11
- Parking at Swanee Drive mile 6.2 directions to trailhead 12
- Parking at North Lamar Boulevard mile 6.3 directions to trailhead 13
- Southwest Lot Parking mile 9.7 directions to Southwest Lot Parking
- East Lot Parking mile 9.9 directions to East Lot Parking
- North Lot Parking mile 9.9 directions to North Lot Parking
- Parking at West Braker Lane mile 10 directions to trailhead 17
- Parking at Burnet Road mile 10 directions to trailhead 18
- Parking at Burnet Road mile 10 directions to trailhead 19
- Parking at Panhandle Road mile 10 directions to trailhead 20
- Parking at West Braker Lane mile 10 directions to trailhead 21
- Parking at Panhandle Road mile 10 directions to trailhead 22
- Parking at West Braker Lane mile 10.1 directions to trailhead 23
- Parking at Kramer Lane mile 10.2 directions to trailhead 24
- Parking at Kramer Lane mile 10.2 directions to trailhead 25
- Parking at Kramer Lane mile 10.2 directions to trailhead 26
- Lakeline Station Park & Ride directions to Lakeline Station Park & Ride
- Lakeline Station Park & Ride water directions to Lakeline Station Park & Ride
- Lakeline Station Park & Ride directions to Lakeline Station Park & Ride
- Parking at Avery Ranch Boulevard directions to trailhead 30
- Parking at Avery Ranch Boulevard directions to trailhead 31
(opens in a new tab) About this trail
The Red Line Parkway Trail, or Red Line Trail, is a planned trail along CapMetro's Red Line commuter and freight rail corridor through Austin, Cedar Park and Leander, Texas, of which only separate pieces are built. It runs beside an active railroad rather than on an abandoned one. CapMetro owns the right-of-way and puts the corridor at 32 miles; the Red Line Parkway Initiative, a nonprofit created in 2017, coordinates planning with CapMetro and the City of Austin; Community Impact reported in late 2025 that 5.5 miles of a planned 36 were finished. This record maps about 7.9 miles in scattered segments, from East Austin north through the Crestview and Highland area and past Braker and Kramer lanes to Lakeline Station.
CapMetro dates the trail concept to its 2004 All Systems Go plan; the agency completed a rail-with-trail feasibility study in June 2007, and a 1-mile section was built in 2013. In November 2019 the CapMetro board and the Austin City Council approved resolutions formalizing a partnership with the initiative, and city bonds from 2016 and 2018 provided $5 million to design the segment between Braker Lane and the Northern Walnut Creek Trail near Kramer Station. CapMetro's Red Line Trail Study, launched in 2023, found that about 13 miles of the corridor can take a trail without variances. The initiative's $3 million community plan, with a $2 million federal grant, is expected to open for public comment in late 2026, with adoption in 2028.
According to TrailLink, the section between MLK Jr. Station and Webberville Road is also known as the Boggy Creek Trail, while the stretch from Webberville Road to Canterbury Street is a bike lane only. Surfaces mix concrete, asphalt and gravel, and parts are shared with the Northern Walnut Creek Trail, the MoPac Express Lane Shared Use Path and the Crestview/Highland Urban Trail.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Austin-Camp Mabry, 4.5 km from the trail's middle, 15 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 62 66 73 80 87 93 97 98 91 82 72 64 Low °F 42 46 52 59 67 73 75 75 70 61 50 43 Precipitation, in 2.6 1.9 2.9 2.4 5 3.7 2 2.7 3.5 3.9 2.9 2.7 Snow, in 0 0.2 0 0 0 0 0 0 0 0 0 0 - On the National Register
- Parque Zaragoza, Austin · historic district, listed 2022
- Delwood Duplex Historic District, Austin · historic district, listed 2011 · nomination file for Delwood Duplex Historic District
- Wilshire Historic District, Austin · historic district, listed 2011 · nomination file for Wilshire Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1896 Austin sheet (1:125,000); the 1954 Austin East sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
1 Reddit thread about this trail, May 2026
- Went on a 60 mile bike ride around Austin and it was glorious r/BikingATX · May 2026 · 20 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationRed Line Parkway Initiative
- RedditSearch Reddit: r/texas
Nearby trails
- Boggy Creek Trail within 0.2 mi · 1.4 mi, paved
- Lance Armstrong Crosstown Bikeway within 0.2 mi · 3.6 mi, paved
- Ann & Roy Butler Hike and Bike Trail within 0.2 mi · 15.0 mi, paved
- Brushy Creek Regional Trail within 0.2 mi · 6.7 mi, paved
- Mueller Trail 0.4 mi away · 3.8 mi, paved
- Northern Walnut Creek Trail 0.7 mi away · 4.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 13148620, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Red Line Trail Study — CapMetro · organization · checked Oct 15, 2026 Supports: 32-mile corridor following the Red Line commuter and freight rail corridor through Austin, Cedar Park and Leander, CapMetro owns the right-of-way, concept from the 2004 All Systems Go Plan, study launched 2023, about 40% (13.07 miles) can accommodate the trail without variances
- TIMELINE: Plans for a continuous Red Line Trail between Austin and Leander gain momentum — Community Impact (December 31, 2019) · web · checked Oct 15, 2026 Supports: June 2007 Rail With Trail Feasibility Study, 1-mile section built 2013, Red Line Parkway Initiative created 2017, November 2019 resolutions by the CapMetro board and Austin City Council, 2016 and 2018 bonds $5 million for design between Braker Lane and Northern Walnut Creek Trail near Kramer Station
- 36-mile regional trail project to spur economic growth across Austin — Community Impact (November 13, 2025) · web · checked Oct 15, 2026 Supports: 36 miles planned, 5.5 miles finished, $3 million planning study with $2 million federal grant, public engagement late 2026, plan adoption 2028
- Red Line Parkway Trail — TrailLink · web · checked Oct 15, 2026 Supports: MLK Jr Station to Webberville Road also known as Boggy Creek Trail, Webberville Road to Canterbury Street bike lane only, concrete, asphalt and gravel, shared with Northern Walnut Creek Trail, MoPac Express Lane Shared Use Path and Crestview/Highland Urban Trail
- Relation: Red Line Parkway Trail (13148620) — OpenStreetMap · web · checked Oct 15, 2026 Supports: location of the record's mapped segments (East Austin, Crestview/Highland, Braker and Kramer lanes, Lakeline Station)
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.