Bong Bridge Bike Path
Greenway in Minnesota, crossing into Wisconsin
Runs through Duluth and Village of Superior (WI) · St. Louis County and Douglas County (WI)
Conditions now
Loading the weather near Duluth…
Forecast by the National Weather Service for Duluth · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at South 43rd Avenue West mile 0 directions to trailhead 1
- Parking at West Michigan Street mile 0.2 directions to trailhead 2
- Parking at West Michigan Street mile 0.2 directions to trailhead 3
(opens in a new tab) About this trail
The Bong Bridge Bike Path is a paved path of about 1.8 miles that carries walkers and cyclists across the Richard I. Bong Memorial Bridge between Duluth, Minnesota, and Superior, Wisconsin. The bridge, owned by the Minnesota Department of Transportation, carries U.S. Highway 2 over Saint Louis Bay and Interstate 35; it opened on October 25, 1984, after five years of construction at a cost of $70 million, and is named for Richard Ira Bong, the World War II fighter pilot. It is the only bridge between the two cities with a path for pedestrians or cyclists.
On the Duluth side the path starts near South 43rd Avenue West and drops riders at Michigan Street, a frontage road along I-35; the Cross City Trail passes beneath the bridge but does not connect to it. The south end lands in the Billings Park area of Superior, where the Wisconsin approaches are a series of roundabouts. A Streets.mn article of 2024 describes the path as too narrow for passing, and a Duluth News Tribune article noted that the bikeway is not plowed in winter. Superior's plans call for a separated bikeway along Winter Street linking the path to the replacement Blatnik Bridge.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
4% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Superior, 6 km from the trail's middle, 2 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 22 27 36 46 57 67 76 75 67 53 39 27 Low °F 6 9 21 32 41 50 58 58 50 39 26 13 Precipitation, in 0.8 0.9 1.4 2.6 3.4 4.6 3.9 3.9 3.4 3.2 2.1 1.3 Snow, in 14.5 12.4 9.1 1.7 0 0 0 0 0 0.2 5.8 12.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1915 Superior sheet (1:48,000); the 1954 West Duluth sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Cross City Trail within 0.2 mi · 7.0 mi, paved
- DWP Trail 1.2 mi away · 7.4 mi, paved
- Millenium Trail 1.6 mi away · 1.9 mi, surface unknown · Wisconsin
- Munger State Trail 2.2 mi away · 74.4 mi, paved
- Osaugie Trail 3.1 mi away · 5.2 mi, paved · Wisconsin
- Hermantown Connector Trail System 3.3 mi away · 2.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Richard I. Bong Bridge (Bridge 69100) — MnDOT Historic Bridges · government source · checked Oct 17, 2026 Supports: owner MnDOT; carries US 2 over Saint Louis Bay and I-35; links Duluth and Superior; built 1984
- Richard I. Bong Memorial Bridge — Wikipedia · organization · checked Oct 17, 2026 Supports: opening date October 25, 1984; five years, $70 million; namesake Richard Ira Bong
- Discover Duluth Redux: Bong Bridge — Duluth News Tribune · press · checked Oct 17, 2026 Supports: dedicated walkway; bikeway not plowed in winter
- These 'Twin' Cities Can Complete a Grand Rounds First — Streets.mn (Max Singer, 2024) · web · checked Oct 17, 2026 Supports: only Duluth-Superior bridge with a path; narrow; ends at Michigan Street frontage road; Cross City Trail passes beneath; Wisconsin roundabouts; Billings Park; Winter Street bikeway plan to Blatnik Bridge
- OpenStreetMap — OpenStreetMap contributors · web · checked Oct 17, 2026 Supports: trail name, paved surface, length, South 43rd Avenue West start
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.