DWP Trail
Rail-trail in Minnesota
Runs through Midway Township (St. Louis County) and Duluth · St. Louis County
Conditions now
Loading the weather near Duluth…
Forecast by the National Weather Service for Duluth · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at South 71st Avenue West mile 0.8 directions to trailhead 1
- Parking at Becks Road mile 7.7 directions to trailhead 2
(opens in a new tab) About this trail
The DWP Trail follows the former grade of the Duluth, Winnipeg and Pacific Railway in western Duluth, Minnesota, high above the St. Louis River estuary and the Willard Munger State Trail. The City of Duluth's Parks and Recreation division manages it as part of the city's St. Louis River Corridor initiative. The railway tunneled through Ely's Peak, starting excavation in August 1910; the tunnel, about 520 feet long and 18 feet wide on a curve, was ready for track on August 15, 1911, and the line reached Duluth in 1912.
As mapped here the trail runs about 7.4 miles from South 71st Avenue West southwest to the Becks Road trailhead, also called the Frederick Rodney Paine Forest Preserve trailhead, at 2509 Becks Road. Along the way it passes through the Ely's Peak tunnel and crosses two steel trestles, with views over the Gary-New Duluth, Riverside and Smithville neighborhoods. The Clyde Connector Trail and the restored Stewart Creek railroad bridge link it to the rest of western Duluth's trail network.
The city began work on the Stewart Creek bridge and Clyde Connector in fall 2017, restored about 5 miles of trail between Becks Road and Lower Spirit Mountain starting in 2018, and in 2020 bid out limestone capping of the stretch from the Lower Chalet at Spirit Mountain to Becks Road. A ribbon cutting on September 21, 2021 marked the finished work: grading and drainage, limestone capping, trestle restoration, removal of two wooden railroad bridges, rock scaling in the tunnel and 23 rock cuts, the Becks Road trailhead, and signs. The city says the trail meets ADA standards for an accessible recreation trail. Funding came from Minnesota DNR regional trail grants, the federal Recreational Trails Program, Parks and Trails Legacy grants and city tourism tax. As a gravel trail, the DWP stays open when the city closes natural-surface trails during the spring thaw.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
56% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Superior, 12 km from the trail's middle, 73 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 22 27 36 46 57 67 76 75 67 53 39 27 Low °F 6 9 21 32 41 50 58 58 50 39 26 13 Precipitation, in 0.8 0.9 1.4 2.6 3.4 4.6 3.9 3.9 3.4 3.2 2.1 1.3 Snow, in 14.5 12.4 9.1 1.7 0 0 0 0 0 0.2 5.8 12.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1915 Superior sheet (1:48,000); the 1954 West Duluth sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Munger State Trail within 0.2 mi · 74.4 mi, paved
- Cross City Trail 0.4 mi away · 7.0 mi, paved
- Bong Bridge Bike Path 1.2 mi away · 1.8 mi, paved
- Millenium Trail 3.0 mi away · 1.9 mi, surface unknown · Wisconsin
- Hermantown Connector Trail System 3.5 mi away · 2.6 mi, paved
- The Lakewalk 4.8 mi away · 6.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- DWP Trail Corridor Ribbon Cutting & Bike Ride to be held Tuesday, September 21 — City of Duluth (Sept. 10, 2021) · government source · checked Oct 15, 2026 Supports: Parks and Recreation management, route above the estuary and Munger Trail, two steel trestles and Ely's Peak tunnel, Becks Road / Frederick Rodney Paine Forest Preserve trailhead at 2509 Becks Road, list of completed work, ADA standard, funding sources, ribbon cutting September 21, 2021
- Public Information Meeting to Address DWP Trail Restoration Project — City of Duluth (March 22, 2018) · government source · checked Oct 15, 2026 Supports: St. Louis River Corridor initiative, restoration of about five miles between Becks Road and Lower Spirit Mountain in 2018, work on Stewart Creek Railroad Bridge and Clyde Connector Trail from fall 2017, connectivity to western Duluth trails
- Invitation to Bid: DWP Trail Capping and Improvements, Bid 20-99486 — City of Duluth (2020) · government source · checked Oct 15, 2026 Supports: 2020 capping, ditching and brushing from the Lower Chalet at Spirit Mountain to the Becks Road trailhead
- City of Duluth temporarily closes all natural surface trails — City of Duluth (March 13, 2025) · government source · checked Oct 15, 2026 Supports: DWP listed among paved and gravel trails that remain open during the spring-thaw closure
- Ely's Peak — Wikipedia · organization · checked Oct 15, 2026 Supports: tunnel excavation from August 1910, ready for track August 15, 1911, length about 520 ft, width 18 ft, on a curve; railway reached Duluth in 1912
- Improvements to West Duluth's DWP Trail complete — WDIO-TV · web · checked Oct 15, 2026 Supports: views over Gary-New Duluth, Riverside and Smithville
- OpenStreetMap ways for the DWP Trail — OpenStreetMap · web · checked Oct 15, 2026 Supports: mapped length and endpoints (South 71st Avenue West to Becks Road)
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
