Border to Boston Trail

Rail-trail in Massachusetts · OpenStreetMap relation

Runs through Boxford, Topsfield and Danvers · Essex County

Conditions now

Loading the weather near Topsfield…

Forecast by the National Weather Service for Topsfield · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
7.0 mi 11.3 km1
On former railbed
6.2 mi 89%
Surface
Crushed stone1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Service Road mile 4.4 directions to trailhead 1
  2. Parking at Park Street mile 5.1 directions to trailhead 2
  3. Topsfield Park and Ride mile 5.2 directions to Topsfield Park and Ride
  4. Parking at Park Street mile 5.2 directions to trailhead 4
  5. Parking at Main Street mile 5.4 directions to trailhead 5
  6. Parking at Grove Street mile 5.4 directions to trailhead 6
Danvers Rail Trail.jpg (opens in a new tab)
Danvers Rail Trail.jpg · Photo: Fletcher6 · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Border to Boston Trail is a developing regional route in Essex County, Massachusetts, meant to link the New Hampshire state line with Boston; most of its off-road sections follow the former Newburyport Railroad right-of-way. The section described here runs about 9.4 miles from Danvers north through Wenham and Topsfield into Boxford. The Danvers and Georgetown Railroad began building this part of the line south from Georgetown in April 1853, and the line from Newburyport to Wakefield was finished on October 23, 1854. The Boston and Maine leased it in 1860 as its Newburyport Branch. Passenger service between Topsfield and Danvers ended in 1950, and that section was abandoned in 1981.

The route is a chain of town-built trails. The Danvers Rail Trail is a 4.3-mile stone dust path on the Boston and Maine corridor that links with trails in Peabody, Wenham and Topsfield; the town works with the nonprofit Friends of the Danvers Rail Trail. The Topsfield Linear Common continues toward Boxford: its southern part, from Wenham to Topsfield Center, is owned by the MBTA, leased by the town for 99 years and surfaced with stone dust, while the northern part, from Washington Street to the Boxford line, is National Grid land used under license, with gravel, grass and singletrack. Topsfield's Rail Trail Committee, created in April 2005, builds and maintains it.

North of Topsfield the route is unfinished. MassDOT project 607541 would build about 2.4 miles of shared-use path from Georgetown Road in Boxford to West Main Street (Route 97) in Georgetown, at an estimated $4.6 million; final plans were resubmitted in February 2025, and construction is listed for autumn 2027. Boxford received $250,000 in federal funds to design the link between Georgetown Road and the Topsfield Linear Common. At the southern end, a $19 million MassDOT project is to join the Danvers Rail Trail to Peabody's Independence Greenway with a bridge over Route 1.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 57% of this route as an abandoned rail line.

Shade

57% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Beverly Municipal Airport, 5.8 km from the trail's middle, 20 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F363845566676828173625142
Low °F202128374756626153423426
Precipitation, in3.12.94.24.33.43.83.53.33.64.544.2
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Salem sheet (1:62,500); the 1953 Georgetown sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs, oldest first.

Boxford, c. 1901–1907: Station and tracks
Boxford, c. 1901–1907: Station and tracksPhoto: C. D. Tutty for C. A. Bixby (publisher) · Public domain · Wikimedia Commons (opens in a new tab)

Community

What riders say on Reddit

  • Riders in 2024 and 2026 described the Peabody-to-Boxford stretch as packed gravel or dirt; one said road tires would do, and both advised wider tires farther north. r/SalemMA, Jan 2024 · r/bikeboston, Mar 2026
  • One rider in 2026 described a near-continuous ride from Peabody toward Newburyport: packed gravel to Boxford, short quiet road links, rail corridor to Byfield, then a final access road. r/bikeboston, Mar 2026
  • One rider in 2024 said the Peabody section starts on Lowell Street, and that the Independence Greenway's paved part runs about five miles from a Peabody park to Middleton. r/SalemMA, Jan 2024
2 Reddit threads about this trail, Jan 2024 to Mar 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 18013288, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Georgetown/Boxford - Design Public Hearing webinar and comment period — MassDOT Highway Division, Mass.gov · government source · checked Oct 13, 2026
    Supports: Georgetown Road (Boxford) to West Main Street (Route 97, Georgetown) section of the Border to Boston Trail; trail system of nearly 30 miles in eight Essex County communities (note)
  3. Project 607541: Georgetown–Boxford Border to Boston Trail — MassDOT Highway Division project information · government source · checked Oct 13, 2026
    Supports: about 2.4 miles, PS&E resubmission February 7, 2025, construction autumn 2027, estimated contract cost $4,628,858
  4. Rail Trail — Town of Danvers · government source · checked Oct 13, 2026
    Supports: 4.3-mile stone dust Danvers Rail Trail on the Boston and Maine corridor, links to Peabody, Wenham and Topsfield, partnership with the Friends of the Danvers Rail Trail
  5. Rail Trail Committee — Town of Topsfield · government source · checked Oct 13, 2026
    Supports: Topsfield Linear Common on the abandoned Boston and Maine corridor between Danvers and Boxford, MBTA ownership and 99-year lease from Wenham to Topsfield Center with stone dust, National Grid license from Washington Street to the Boxford line with gravel, grass and singletrack, committee created April 2005, part of the Border to Boston Trail
  6. MVPC Communities to receive Border to Boston Trail Funding — Merrimack Valley Planning Commission · organization · checked Oct 13, 2026
    Supports: route from the New Hampshire line to Boston, off-road sections on the former Newburyport Railroad, $250,000 for Boxford to design Georgetown Road to the Topsfield Linear Common
  7. Newburyport Railroad — Wikipedia · organization · checked Oct 13, 2026
    Supports: Danvers and Georgetown Railroad construction from April 1853, line complete October 23, 1854, Boston and Maine lease in 1860 as the Newburyport Branch, Topsfield–Danvers passenger service ended 1950, section abandoned 1981
  8. MassDOT Is Filling Gaps in the Border to Boston Trail — Streetsblog Massachusetts (April 29, 2025) · press · checked Oct 13, 2026
    Supports: $19 million project linking the Danvers Rail Trail and Peabody's Independence Greenway with a bridge over Route 1

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.