Georgetown-Byfield Rail Trail
Rail-trail in Massachusetts · OpenStreetMap relation
Runs through Georgetown and Newbury · Essex County
Conditions now
Loading the weather near Boxford…
Forecast by the National Weather Service for Boxford · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
The Georgetown-Byfield Rail Trail is an unimproved dirt trail of about 2.8 miles in Georgetown and the Byfield village of Newbury, Massachusetts, partly on the former Newburyport Railroad. It is a section of the Border to Boston Trail, a bicycle and pedestrian route between Boston and the New Hampshire line whose off-road sections nearly all follow, or will follow, the Newburyport Railroad right of way.
The Newburyport and Bradford Railroad, incorporated in 1846, opened a line from Newburyport to Georgetown in 1849. It merged with the Danvers and Georgetown Railroad in 1855 to form the Newburyport Railroad, which the Boston and Maine leased from 1860 and bought in 1906. Passenger service between Newburyport and Topsfield ended in December 1941.
In 2025 the Georgetown section was a lightly used packed singletrack, overgrown with weeds and long grass but rideable on most bicycles in dry weather. MassDOT is designing an upgrade, project 607542: about 2.6 miles of off-road shared-use trail from West Main Street (Route 97) in Georgetown to the Newbury town line, and about 0.7 mile in Newbury from the town line to Church Street in Byfield, with eight at-grade road crossings and one on-road segment. A design public hearing was held on May 1, 2025, and construction funding is programmed for federal fiscal year 2028. To the south, a 2.4-mile segment from West Main Street to Georgetown Road in Boxford was tentatively scheduled for construction in 2027. Newbury planned a 2026 feasibility study for a route from Byfield Center to the Newburyport commuter rail station, where the Border to Boston Trail would meet the Clipper City Rail Trail.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
56% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Groveland, 5.7 km from the trail's middle, 13 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 35 38 46 58 69 78 83 81 73 62 51 41 Low °F 17 19 26 36 46 56 62 60 52 40 32 23 Precipitation, in 3.7 3.6 5 4.2 3.8 4.2 3.6 3.4 4.1 4.9 3.9 4.7 Snow, in 17.9 17.2 14.4 2.4 0 0 0 0 0 0.4 1.8 13 - Old maps
USGS topographic maps of the trail's middle go back to the 1888 Salem sheet (1:62,500); the 1953 Georgetown sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 3
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationCoastal Trails Coalition — Newbury Border to Boston Trail
Nearby trails
- Groveland Community Trail 1.0 mi away · 1.9 mi, paved
- Border to Boston Trail 3.0 mi away · 7.0 mi, crushed stone
- William Lloyd Garrison Trail 4.9 mi away · 2.3 mi, paved
- Clipper City Rail Trail 4.9 mi away · 3.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 20613277, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Georgetown - Newbury - Border to Boston Trail (Northern Georgetown to Byfield Section) — Mass.gov (MassDOT Highway Division) · government source · checked Oct 13, 2026 Supports: project 607542, 2.6 miles from West Main Street (Route 97) to the Georgetown–Newbury line, 0.7 mile from the town line to Church Street, eight at-grade crossings and one on-road segment, May 1, 2025 design public hearing
- Newburyport Railroad — Wikipedia · organization · checked Oct 13, 2026 Supports: 1846 incorporation of the Newburyport and Bradford, 1849 Newburyport–Georgetown opening, 1855 merger forming the Newburyport Railroad, B&M lease 1860 and purchase 1906, end of Newburyport–Topsfield passenger service December 1941, conversion to the Border to Boston Trail
- MVPC Communities to receive Border to Boston Trail Funding — Merrimack Valley Planning Commission · organization · checked Oct 13, 2026 Supports: Border to Boston as a bicycle and pedestrian route from Boston to the New Hampshire line, off-road sections on the former Newburyport Railroad right of way
- Newbury Segment of Border-to-Boston Trail — Coastal Trails Coalition · organization · checked Oct 13, 2026 Supports: construction funding for Georgetown Center to Byfield Center programmed for FFY2028, 2026 feasibility study from Byfield Center to the Newburyport MBTA station and the Clipper City Rail Trail
- MassDOT Is Filling Gaps in the Border to Boston Trail — Streetsblog Massachusetts (April 29, 2025) · press · checked Oct 13, 2026 Supports: current condition (light traffic, overgrown, packed singletrack rideable in dry weather), 2.4-mile Georgetown–Boxford segment tentatively scheduled for 2027
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
