States › Maryland

Broadneck Peninsula Trail

Greenway in Maryland · OpenStreetMap relation

Runs through Severna Park, Arnold and Cape St. Claire · Anne Arundel County

Conditions now

Loading the weather near Arnold…

Forecast by the National Weather Service for Arnold · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Managed by Anne Arundel County.2

Length
7.4 mi 11.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Severna Park Park & Ride mile 0.1 · water directions to Severna Park Park & Ride
  2. Parking at Jones Station Road West mile 0.1 · water directions to trailhead 2
  3. Parking at Jones Station Road mile 0.2 directions to trailhead 3
  4. Parking at Peninsula Farm Road mile 0.8 directions to trailhead 4
  5. Parking at Anne Arundel Com Col Road mile 1.2 directions to trailhead 5
  6. Parking at College Parkway mile 1.3 directions to trailhead 6
  7. Parking at College Parkway mile 1.5 directions to trailhead 7
  8. Parking at College Parkway mile 1.6 directions to trailhead 8
  9. Parking at College Parkway mile 1.7 directions to trailhead 9
  10. Parking at College Parkway mile 1.8 directions to trailhead 10
  11. Parking at Jones Station Road mile 2.4 directions to trailhead 11
  12. Parking at College Parkway mile 2.9 directions to trailhead 12
  13. Parking at College Parkway mile 4.8 directions to trailhead 13
Broadneck Peninsula Trail (opens in a new tab)
Photo: roadgeek_md99 · CC BY-SA 4.0 · Mapillary

About this trail

The Broadneck Peninsula Trail is a paved trail along College Parkway in Arnold, Anne Arundel County, Maryland, built mostly within the road's right-of-way. Anne Arundel County Recreation and Parks describes it as a 10-foot-wide asphalt trail with a mainline of about 8 miles linking the B&A Trail with Sandy Point State Park. The trail is open dawn to dusk. This record maps about 8 miles.

The trail began as a vision in the 1999 small area plans for the Broadneck peninsula, and the county's master plan for it dates from the same year. It was designed and built in phases with federal, state and county money, from the first sections along College Parkway to Phases IB and V, which run from Peregoy Park Place to Log Inn Road and on toward Sandy Point State Park. A ribbon cutting reported by the county council's District 5 office on April 1, 2026, marked the trail's official opening, connecting neighborhoods along College Parkway from Route 2 to the state park for the first time.

From the B&A Trail at Jones Station Road, where a connector reaches the MTA park-and-ride, the trail runs east past Anne Arundel Community College and along College Parkway past Bay Dale Drive and Green Holly Drive, with spurs to Broadneck Library, Broadneck Park and Cape St. Claire, then follows East College Parkway to Log Inn Road and a loop in Sandy Point State Park. The county's project page, last updated in June 2025, lists further work: a spur to Bay Head Park, a boardwalk east of Jones Station Road, a spur to Oceanic Drive, and Phase IVb, a crossing of Route 2 from the college to the B&A Trail. Through the B&A Trail, the route is planned to carry the American Discovery Trail and the East Coast Greenway.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

38% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Baltimore Wash International Airport, 23.6 km from the trail's middle, 31 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F434655667684898680685748
Low °F252734445363686659463630
Precipitation, in3.12.943.43.944.54.14.43.93.13.7
Snow, in6.47.52.800000000.12.5
Old maps

USGS topographic maps of the trail's middle go back to the 1893 North Point sheet (1:62,500); the 1954 Gibson Island sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 11016704, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Anne Arundel County · Official site · checked Oct 31, 2026
  3. Broadneck Peninsula Trail — Anne Arundel County Government · organization · checked Oct 14, 2026
    Supports: paved trail within the College Parkway right-of-way in Arnold, 10-foot-wide asphalt, mainline about 8 miles, B&A Trail to Sandy Point State Park, open dawn to dusk, American Discovery Trail and East Coast Greenway
  4. Broadneck Peninsula Trail - Projects — Anne Arundel County Government · organization · checked Oct 14, 2026
    Supports: 1999 master plan, phases IA, IB, II, III, IVa, IVb and V with their limits, spurs to Broadneck Library, Broadneck Park, Cape St. Claire, Bay Head Park and Oceanic Drive, Sandy Point park loop, MTA park-and-ride connector, boardwalk east of Jones Station Road, Phase IVb Route 2 crossing, page last updated June 2, 2025
  5. Broadneck Trail Ribbon Cutting — Anne Arundel County Government (District 5 Blog) · organization · checked Oct 14, 2026
    Supports: 1999 small area plans, federal, state and county funding, official opening at a ribbon cutting posted April 1, 2026, College Parkway neighborhoods connected from Route 2 to Sandy Point State Park

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.