South Shore Trail
Greenway in Maryland · OpenStreetMap relation
Runs through Odenton and Parole · Anne Arundel County
Conditions now
Loading the weather near Arden on the Severn…
Forecast by the National Weather Service for Arden on the Severn · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The South Shore Trail is a 11.2-mile (18.0 km) long, planned shared-use rail trail that will run from Annapolis to Odenton in Maryland, United States. Two segments, totaling 2.96-mile (4.76 km) have been built. The Trail primarily utilizes the abandoned road bed of the Annapolis and Elk Ridge Railroad. The trail will connect with the Colonial Annapolis Maritime Trail on the east and the Washington, Baltimore and Annapolis Trail, via the Odenton Bike Path, on the west. When complete, it will be a component of the American Discovery Trail, the East Coast Greenway and the September 11th National Memorial Trail. The trail name is a reference to the railroad it replaces which during its last 10 years in operation was known as the South Shore Division because it ran along the south shore of the Severn River.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Managed by Anne Arundel County.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Railroad Avenue mile 0 directions to trailhead 1
- Parking at Odenton Road mile 0.2 directions to trailhead 2
- Parking at Stoney Hill Road mile 0.3 directions to trailhead 3
- Parking at Odenton Road mile 0.3 directions to trailhead 4
- Parking at Odenton Road mile 0.4 directions to trailhead 5
- Parking at Odenton Road mile 0.5 directions to trailhead 6
- Parking at Annapolis Road mile 0.7 directions to trailhead 7
- Parking at Annapolis Road mile 1 directions to trailhead 8
- Parking at Gateway Boulevard mile 1 directions to trailhead 9
- Parking at Gambrills Road mile 2.1 directions to trailhead 10
- Parking at Bonheur Avenue mile 2.8 directions to trailhead 11
- Parking at Millersville Road mile 3.2 directions to trailhead 12
- Parking at Waterbury Road mile 4.8 directions to trailhead 13
- Parking mile 10.8 directions to trailhead 14
- Parking mile 10.8 directions to trailhead 15
- Parking at Medical Parkway mile 10.9 directions to trailhead 16
- Parking at Jennifer Road mile 10.9 directions to trailhead 17
- Parking at Pavillion Parkway mile 11.1 directions to trailhead 18
- Parking at Medical Parkway mile 11.1 directions to trailhead 19
(opens in a new tab) About this trail
The South Shore Trail is a planned shared-use rail-trail of about 11 miles between Annapolis and Odenton in Anne Arundel County, Maryland, built and managed by the county's Department of Recreation and Parks. The county plans a paved, 10-foot-wide asphalt trail that generally uses the abandoned right-of-way of the Washington, Baltimore & Annapolis (WB&A) Railroad where feasible, connecting with the Colonial Annapolis Maritime Route on the east and the WB&A Trail on the west, and forming part of the East Coast Greenway and the American Discovery Trail. The trail is open dawn to dusk.
The line began as the Annapolis and Elk Ridge Railroad, chartered in 1837 and opened in 1840. The WB&A bought it in 1902 and ran it as an electric interurban; in 1921 it became the WB&A's South Shore Division, named for its route along the south shore of the Severn River. The WB&A ceased operations in 1935. The county's master plan for the trail dates from 1989, and county leaders broke ground on a section in Millersville in 1990, but land acquisition, wetland permitting, local opposition and budget cuts delayed construction for decades. Phase I opened with a ribbon cutting on May 13, 2019.
The county builds the trail in phases. Phase I runs 1.66 miles from Ticker Lane at Waterbury Road to Hansel Drive at Millersville Road, and Phase Va runs 0.48 mile from Medical Parkway to Bestgate Road behind the Annapolis Mall, Annapolis Plaza and Anne Arundel Medical Center; both are open. Phase II, 1.86 miles from Sappington Station Road to Holiday Park Road at Bonheur Avenue in the Odenton and Gambrills area, was listed as under construction in the county's June 2025 update. Phases III and IV, along Generals Highway between Bestgate Road and Waterbury Road, were in design, and Phase V from Bestgate Road into Annapolis is a future project. This record maps about 5 miles in four pieces, including sections near Odenton and Gambrills.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
33% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Baltimore Wash International Airport, 12.6 km from the trail's middle, 11 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 43 46 55 66 76 84 89 86 80 68 57 48 Low °F 25 27 34 44 53 63 68 66 59 46 36 30 Precipitation, in 3.1 2.9 4 3.4 3.9 4 4.5 4.1 4.4 3.9 3.1 3.7 Snow, in 6.4 7.5 2.8 0 0 0 0 0 0 0 0.1 2.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1894 Relay sheet (1:62,500); the 1957 Odenton sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
1 Reddit thread about this trail, Aug 2025
- DC to Annapolis (via Anacostia, WB&A, & MD-178)? r/bikedc · Aug 2025 · 8 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationThe Friends of Anne Arundel County Trails
- Agency noticesSouth Shore Trail - Projects (Anne Arundel County Recreation and Parks)
- RedditSearch Reddit: r/maryland
Nearby trails
- Washington, Baltimore & Annapolis Trail within 0.2 mi · 11.4 mi, paved
- Poplar Trail 1.0 mi away · 0.9 mi, paved
- Baltimore & Annapolis Trail 2.9 mi away · 14.6 mi, paved
- Broadneck Peninsula Trail 4.2 mi away · 7.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 11016742, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “South Shore Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q65047054, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- South Shore Trail - Projects — Anne Arundel County Recreation and Parks · organization · checked Oct 14, 2026 Supports: paved 10-foot asphalt trail on the WB&A right-of-way between Annapolis and Odenton; connections to the Colonial Annapolis Maritime Route and WB&A Trail; American Discovery Trail and East Coast Greenway; open dawn to dusk; 1989 master plan; phase locations, lengths and status (Phase I and Va open, Phase II under construction, III and IV in design, V future); last updated June 10, 2025
- South Shore Trail — Anne Arundel County Government · organization · checked Oct 14, 2026 Supports: 11-mile planned shared-use rail trail from Annapolis to Odenton; open dawn to dusk
- South Shore Trail — Wikipedia · organization · checked Oct 14, 2026 Supports: Annapolis and Elk Ridge Railroad chartered 1837, operating 1840; WB&A purchase in 1902 and electric interurban; South Shore Division name from 1921 and the Severn River; WB&A ceased operations in 1935; 1990 groundbreaking in Millersville; delays from land acquisition, wetlands, opposition and funding; Phase I ribbon cutting May 13, 2019
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.