Buffalo Bayou South Trail
Greenway in Texas
Runs through Houston · Harris County
Conditions now
Loading the weather near Houston…
Forecast by the National Weather Service for Houston · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Commerce Street mile 0.7 · water directions to trailhead 1
- Parking at Commerce Street mile 0.8 · water directions to trailhead 2
- Parking at Commerce Street mile 0.8 · water directions to trailhead 3
- Parking at Commerce Street mile 0.8 · water directions to trailhead 4
- Parking at Franklin Street mile 0.9 directions to trailhead 5
- Parking at Milam Street mile 0.9 directions to trailhead 6
- Parking at Milam Street mile 0.9 directions to trailhead 7
- Parking at Travis Street mile 0.9 directions to trailhead 8
- Parking at Commerce Street mile 0.9 directions to trailhead 9
- Parking at Milam Street mile 1 · restrooms · water directions to trailhead 10
- Parking at Louisiana Street mile 1.1 directions to trailhead 11
- Parking at Allen Parkway mile 2.1 · water directions to trailhead 12
- Parking at Allen Parkway mile 2.2 · water directions to trailhead 13
- Parking at Allen Parkway mile 2.2 · water directions to trailhead 14
- Parking at Allen Parkway mile 2.2 · water directions to trailhead 15
- Parking at Allen Parkway mile 2.3 · water directions to trailhead 16
- Parking at Allen Parkway mile 2.3 directions to trailhead 17
- Parking at Taft Street mile 2.5 directions to trailhead 18
- Parking at Allen Parkway mile 2.5 directions to trailhead 19
- Parking at Allen Parkway mile 2.5 · water directions to trailhead 20
- Parking at Temple Drive mile 2.6 directions to trailhead 21
- Parking at Allen Parkway mile 2.6 directions to trailhead 22
- Parking at Allen Parkway mile 3.7 directions to trailhead 23
- Parking at Marston Street mile 4.1 · water directions to trailhead 24
Plan your visit
- By trainAmtrak: Houston, TX (HOS) 0.3 mi from a trailhead · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
About this trail
The Buffalo Bayou South Trail, as OpenStreetMap names it, is the hike-and-bike trail along the south (Allen Parkway) side of Buffalo Bayou in Houston, Texas. This record maps about 4.0 miles from Commerce Street in downtown west through Buffalo Bayou Park to Shepherd Drive; the trail on the opposite bank has its own record, the Buffalo Bayou North Trail. Most of the route lies in Buffalo Bayou Park, a 160-acre, 2.3-mile-long park between Allen Parkway and Memorial Drive from Shepherd Drive to Sabine Street. In 2011 the city agreed with the nonprofit Buffalo Bayou Partnership to develop and renovate the park; the roughly $50 million project, including $30 million from the Kinder Foundation, was carried out with the Houston Parks and Recreation Department and the Harris County Flood Control District, and the updated park officially opened in October 2015. It is a bayou greenway, not a rail-trail.
On the south bank the trail passes Lost Lake at 3422 Allen Parkway and the Johnny Steele Dog Park just west of Montrose Boulevard. Near Sabine Street, The Water Works has a visitor center, limited parking and weekend bike rentals. East of downtown, the 0.4-mile East Downtown Trail opened on June 13, 2022: it runs from Allen's Landing under the Fannin Street Bridge, up along Commerce Street, under the San Jacinto Bridge and through the second basement level of the Wilson Building to a park and plaza at Austin Street, where riders can continue on the Austin Street Corridor bike path. Houston Parks Board and the Partnership built it for nearly $8.7 million.
Lighted areas of Buffalo Bayou Park are open 6 a.m. to 11 p.m. and other areas dawn to dusk. Motorized or electric riding devices are prohibited except mobility aids under the Americans with Disabilities Act, and pets must be leashed outside the dog park.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to March. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Houston-Port, 9.9 km from the trail's middle, 7 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 63 67 73 79 86 91 93 94 90 82 72 65 Low °F 44 49 54 61 69 75 77 77 72 63 53 46 Precipitation, in 4 2.8 3.8 5.2 5.1 7.9 4.5 3.4 4.5 5.4 3.4 4.3 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - On the National Register
- 1879 Houston Waterworks, Houston · structure, listed 1976 · nomination file for 1879 Houston Waterworks
- San Felipe Courts Historic District, Houston · historic district, listed 1988 · nomination file for San Felipe Courts Historic District
- Main Street/Market Square Historic District (Boundary Increase), Houston · historic district, listed 1984 · nomination file for Main Street/Market Square Historic District (Boundary Increase)
- Main Street/Market Square Historic District, Houston · historic district, listed 1983 · nomination file for Main Street/Market Square Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1915 Houston Heights sheet (1:24,000); the 1955 Houston Heights sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationBuffalo Bayou Partnership
Look around
Nearby trails
- Heights Hike & Bike Trail within 0.2 mi · 6.2 mi, paved
- Buffalo Bayou North Trail within 0.2 mi · 4.8 mi, paved
- White Oak Bayou Greenway within 0.2 mi · 23.5 mi, paved
- Columbia Tap Rail Trail 0.8 mi away · 4.3 mi, paved
- Polk Street Bikeway 0.8 mi away · 3.2 mi, surface unknown
- Commuter Trail 1.2 mi away · 1.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Buffalo Bayou Park — Buffalo Bayou Partnership · organization · checked Oct 15, 2026 Supports: 160 acres, Shepherd Drive to Sabine Street between Allen Parkway and Memorial Drive, partners (BBP, Kinder Foundation, Houston Parks and Recreation, Harris County Flood Control District), Lost Lake address, Johnny Steele Dog Park on the south bank west of Montrose, Water Works visitor center, parking and weekend bike rentals, hours, prohibition of motorized or electric riding devices, leash rule
- Buffalo Bayou Park — Wikipedia · organization · checked Oct 15, 2026 Supports: 2.3-mile-long park, 2011 agreement with Buffalo Bayou Partnership, $50 million renovation with $30 million from the Kinder Foundation, opened October 2015
- East Downtown Trail Opens to the Public — Houston Parks Board · organization · checked Oct 15, 2026 Supports: 0.4-mile trail Fannin Street to Austin Street, opened Monday June 13, route from Allen's Landing under the Fannin and San Jacinto bridges, along Commerce Street, through the Wilson Building's second basement, Austin Street plaza, connection to the Austin Street Corridor bike path
- East Downtown Trail opens to the public — KPRC Click2Houston (June 14, 2022) · web · checked Oct 15, 2026 Supports: 2022 opening year; total cost nearly $8.7 million
- OpenStreetMap ways for this trail · web · checked Oct 15, 2026 Supports: name Buffalo Bayou South Trail; mapped length and extent from Commerce Street to Shepherd Drive; trailheads on Commerce and Louisiana streets
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
