States › Texas

White Oak Bayou Greenway

Greenway in Texas · OpenStreetMap relation

Runs through Jersey Village and Houston · Harris County

Conditions now

Loading the weather near Houston…

Forecast by the National Weather Service for Houston · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
23.5 mi 37.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Shanghai Street mile 0.5 directions to trailhead 1
  2. Parking at Equador Street mile 0.6 directions to trailhead 2
  3. Parking at Gessner Road mile 1.2 directions to trailhead 3
  4. Parking at Fairbanks North Houston Road mile 2.3 directions to trailhead 4
  5. Parking at Fairbanks North Houston Road mile 2.4 directions to trailhead 5
  6. Parking at Woodland West Drive mile 2.9 directions to trailhead 6
  7. Parking at Hollister Street mile 3.7 directions to trailhead 7
  8. Parking at Denny Street mile 3.9 directions to trailhead 8
  9. Parking at West Little York Road mile 3.9 directions to trailhead 9
  10. Parking at West Little York Road mile 3.9 directions to trailhead 10
  11. Parking at West Little York Road mile 3.9 directions to trailhead 11
  12. Parking at Gulf Bank Road mile 4.5 directions to trailhead 12
  13. North Parking for White Oak Bayou Trail mile 5.6 directions to North Parking for White Oak Bayou Trail
  14. Parking at West 34th Street mile 10.7 directions to trailhead 14
  15. Parking at West 34th Street mile 10.7 directions to trailhead 15
  16. Parking at North Loop West Frontage Road mile 11.5 directions to trailhead 16
  17. Parking at East T C Jester Boulevard mile 11.7 directions to trailhead 17
  18. Parking at East T C Jester Boulevard mile 12.3 · water directions to trailhead 18
  19. Parking at East T C Jester Boulevard mile 12.3 · water directions to trailhead 19
  20. Parking at West 21st Street mile 12.3 · water directions to trailhead 20
  21. Parking at Ella Boulevard mile 12.3 · water directions to trailhead 21
  22. Parking at East T C Jester Boulevard mile 12.6 directions to trailhead 22
  23. Parking at East T C Jester Boulevard mile 12.8 directions to trailhead 23
  24. Parking at Bryce Street mile 13.7 · water directions to trailhead 24
  25. Parking at West 11th Street mile 13.9 directions to trailhead 25
  26. Parking at Patterson Street mile 14.9 directions to trailhead 26
  27. Parking at Patterson Street mile 15 directions to trailhead 27
  28. Parking at Patterson Street mile 15.1 directions to trailhead 28
  29. Parking at Patterson Street mile 15.1 directions to trailhead 29
  30. Parking at Patterson Street mile 15.1 directions to trailhead 30
  31. Parking at Koehler Street mile 15.6 directions to trailhead 31
  32. Parking at Katy Freeway Frontage Road mile 15.7 directions to trailhead 32
  33. Parking at Harvard Street mile 15.8 directions to trailhead 33
  34. Parking at Harvard Street mile 15.8 directions to trailhead 34
  35. Parking at Cortlandt Street mile 15.8 directions to trailhead 35
  36. Parking at Katy Freeway Frontage Road mile 16 directions to trailhead 36

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

White Oak Bayou Greenway (opens in a new tab)
Photo: graharg · CC BY-SA 4.0 · Mapillary

About this trail

White Oak Bayou Greenway is a hike-and-bike trail and linear park along White Oak Bayou in Houston, running from the bayou's mouth at Allen's Landing downtown northwest toward the city limits; the Houston Parks Board counts more than 18 miles of greenspace and trails inside the city, and this record maps about 23 miles. It is one of the corridors of Bayou Greenways, a public-private partnership of the nonprofit Houston Parks Board, the City of Houston and its Parks and Recreation Department, working with the Harris County Flood Control District. The greenway follows the bayou, about half of it channelized with concrete banks in the 1960s, not a railroad, though in 2015 a new trail bridge west of May Street replaced the former MKT Railroad bridge.

The trail links Hogg Park, White Oak Park, Stude Park, T.C. Jester Park and Watonga Parkway Park, home to one of Houston's largest bat roosts, and crosses the Heights "MKT" Hike and Bike Trail three times as it passes the Heights and Woodland Heights. Parks Board projects opened a 10-foot concrete trail from Antoine Drive to Alabonson Road, with a bridge parallel to Alabonson, in July 2015; a 2-mile segment from west of Studemont Street to near the Moy Street bridge in December 2016, with brick from the old Yale Street Bridge set into the trail; and an extension from Alabonson Road to the Hollister Detention Basin, connecting to Woodland Trails Park, in January 2018. The Harris County Flood Control District plans to extend the greenway farther into the county.

At the downtown end, connections finished in April 2018 tie the greenway to the Leonel Castillo Community Center, Main Street and the Buffalo Bayou trails at the University of Houston-Downtown, which continue west to Buffalo Bayou Park and Memorial Park. The Parks Board's work there also includes Bayou Greenways Park, a new park and trailhead on Studemont Street.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Houston Intercont Airport, 17.7 km from the trail's middle, 11 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F646874808792949590837365
Low °F444854606874767571615246
Precipitation, in3.833.54563.84.84.75.53.94
Snow, in000000000000.1
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1915 Houston Heights sheet (1:24,000); the 1955 Houston Heights sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

38 Reddit threads about this trail, Apr 2024 to May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Look around

360° panorama: White Oak Bayou Greenway (opens in a new tab)
  1. 360° view 1 of 5, photo by graharg
  2. 360° view 2 of 5, photo by graharg
  3. 360° view 3 of 5, photo by graharg
  4. 360° view 4 of 5, photo by graharg
  5. 360° view 5 of 5, photo by graharg
360° panorama · Photo: graharg · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9720543, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. White Oak — Houston Parks Board · organization · checked Oct 15, 2026
    Supports: bayou from northwest Harris County to Allen's Landing; over 18 miles within city limits; Watonga Parkway Park bat roost, T.C. Jester, Stude, White Oak and Hogg parks; 2018 connection to Buffalo Bayou trail at UH-Downtown continuing to Buffalo Bayou Park and Memorial Park; crosses the Heights MKT trail three times, Heights and Woodland Heights
  3. Project History White Oak Bayou — Houston Parks Board · organization · checked Oct 15, 2026
    Supports: 2015 bridge west of May Street replacing the MKT Railroad bridge; July 2015 Antoine to Alabonson 10-foot concrete trail and bridge; December 2016 Studemont to Moy Street bridge 2-mile segment with Yale Street Bridge brick; January 2018 Alabonson to Hollister Detention Basin and Woodland Trails Park; HCFCD plans to extend into the county; April 2018 downtown connections (Leonel Castillo Community Center, Main Street, UH-Downtown); Bayou Greenways Park on Studemont
  4. Greenways — Houston Parks Board · organization · checked Oct 15, 2026
    Supports: Bayou Greenways partnership, 150 miles of trails, White Oak among the bayous
  5. White Oak Bayou Greenway — The Cultural Landscape Foundation · organization · checked Oct 15, 2026
    Supports: about half of White Oak Bayou channelized with concrete banks in the 1960s; Bayou Greenways with Harris County Flood Control District

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.