States › Minnesota

Capital City Bikeway

Greenway in Minnesota · OpenStreetMap relation

Runs through St. Paul · Ramsey County

Conditions now

Loading the weather near St. Paul…

Forecast by the National Weather Service for St. Paul · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.3 mi 3.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East 12th Street mile 0 directions to trailhead 1
  2. Parking at University Avenue East mile 0.1 directions to trailhead 2
  3. Parking at East Mount Airy Street mile 0.1 directions to trailhead 3
  4. Parking at University Avenue East mile 0.1 directions to trailhead 4
  5. Parking at University Avenue East mile 0.1 directions to trailhead 5
  6. Parking at University Avenue East mile 0.1 directions to trailhead 6
  7. Parking at University Avenue East mile 0.1 directions to trailhead 7
  8. Parking at University Avenue East mile 0.2 directions to trailhead 8
  9. Parking at University Avenue East mile 0.3 directions to trailhead 9
  10. Parking at University Avenue East mile 0.3 directions to trailhead 10
  11. Parking at East 14th Street mile 0.4 directions to trailhead 11
  12. Parking at Robert Street North mile 0.6 directions to trailhead 12
  13. Parking at 11th Street East mile 0.6 directions to trailhead 13
  14. Parking at 10th Street East mile 0.6 directions to trailhead 14
  15. Parking at 10th Street East mile 0.6 directions to trailhead 15
  16. Parking at 11th Street East mile 0.6 directions to trailhead 16
  17. Parking at 10th Street East mile 0.6 directions to trailhead 17
  18. Parking at East 10th Street mile 0.6 directions to trailhead 18
  19. Parking at East 8th Street mile 0.7 directions to trailhead 19
  20. Parking at Jackson Street mile 0.7 directions to trailhead 20
  21. Parking at 9th Street East mile 0.7 directions to trailhead 21
  22. Parking at Jackson Street mile 0.7 directions to trailhead 22
  23. Parking at 9th Street East mile 0.7 directions to trailhead 23
  24. Parking at 10th Street East mile 0.7 directions to trailhead 24
  25. Parking at Minnesota Street mile 0.7 directions to trailhead 25
  26. Parking at 9th Street East mile 0.7 directions to trailhead 26
  27. Parking at 9th Street East mile 0.7 directions to trailhead 27
  28. Parking at Wacouta Street mile 0.7 directions to trailhead 28
  29. Parking at Sibley Street mile 0.7 directions to trailhead 29
  30. Parking at East 9th Street mile 0.7 directions to trailhead 30
  31. Parking at 7th Place East mile 0.8 directions to trailhead 31
  32. Parking at 7th Street East mile 0.8 directions to trailhead 32
  33. Parking at 7th Street East mile 0.8 directions to trailhead 33
  34. Parking at 7th Street East mile 0.8 directions to trailhead 34
  35. Parking at 6th Street East mile 0.9 directions to trailhead 35
  36. Parking at Sibley Street mile 1.1 · restrooms directions to trailhead 36
  37. Parking at Kellogg Boulevard East mile 1.1 directions to trailhead 37
  38. Parking at Jackson Street mile 1.1 directions to trailhead 38
  39. Parking at 6th Street West mile 1.6 directions to trailhead 39
  40. Parking at 10th Street East mile 1.7 directions to trailhead 40
  41. Parking at Wabasha Street North mile 1.7 directions to trailhead 41
  42. Parking at 9th Street East mile 1.7 directions to trailhead 42
  43. Parking at Wabasha Street North mile 1.7 directions to trailhead 43
  44. Parking at Wabasha Street North mile 1.7 directions to trailhead 44
  45. Parking at Saint Peter Street mile 1.7 directions to trailhead 45
  46. Parking at Dorothy Day Place mile 1.7 directions to trailhead 46
  47. Parking at Dorothy Day Place mile 1.7 directions to trailhead 47
  48. Parking at 10th Street East mile 1.7 directions to trailhead 48

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

10th St Station St Paul (opens in a new tab)
10th St Station St Paul · Photo: McGhiever · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Capital City Bikeway is a planned network of bicycle facilities through downtown Saint Paul, Minnesota, built by the City of Saint Paul. When it was introduced in 2016, the planned route ran on Jackson Street, St. Peter Street, Ninth Street, 10th Street and Kellogg Boulevard; the city's later plans put the west corridor on Wabasha Street.

The first segment, on Jackson Street, opened in stages: the section from Shepard Road to 7th Place was finished by October 2016, and the city lists the Jackson Street bikeway from Kellogg Boulevard to University Avenue as completed in 2017. The north corridor on 9th and 10th streets was completed in 2020 as an interim design, with a two-way bikeway on the south side of 10th Street between Dorothy Day Place and Jackson Street and one-way bikeways on both sides of 9th Street between Jackson Street and Broadway. Work on Wabasha Street between Kellogg Boulevard and 11th Street was scheduled for June to November 2022. The south corridor on Kellogg Boulevard is listed as a future project.

On Jackson Street the bikeway is a two-way, off-street path beside a separate sidewalk, with landscaping as a buffer from traffic, porous asphalt for stormwater, benches, lighting, signs and public art. The interim corridors are at street level within the existing curbs, with concrete median buffers along parts of 10th Street; the city's long-term plan is protected bikeways built with full street reconstruction.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
St Paul Downtown Airport, 3.5 km from the trail's middle, 21 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F242942576978838072584229
Low °F91325374959646253402715
Precipitation, in0.50.51.42.644.644.13.12.51.30.7
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1896 St. Paul sheet (1:62,500); the 1951 St. Paul East sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 10596529, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Capital City Bikeway Interim Design Study — City of Saint Paul · government source · checked Oct 14, 2026
    Supports: planned network of bicycle facilities throughout downtown; Jackson Street University Ave to Kellogg Blvd completed 2017; 9th and 10th streets completed 2020 as interim design; two-way bikeway on 10th Street Dorothy Day Place to Jackson; one-way bikeways on 9th Street Jackson to Broadway; concrete median buffers on 10th; west corridor on Wabasha Street from Kellogg to 11th, June to November 2022; Kellogg as future south corridor; interim designs at street level; long-term protected bikeways with reconstruction
  3. Saint Paul Introduces Capital City Bikeway — Visit Saint Paul press release (October 10, 2016) · web · checked Oct 14, 2026
    Supports: planned loop on Jackson, St. Peter, Ninth, 10th and Kellogg; first section on Jackson from Shepard Road to 7th Place completed in 2016; two-way off-street trail with separate sidewalk, landscaped buffer, porous asphalt, benches, lights, signage and public art

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.