States › Minnesota

Gateway State Trail

Rail-trail in Minnesota · OpenStreetMap relation

Runs through St. Paul, Maplewood, North St. Paul, Oakdale, Lake Elmo, Pine Springs, Grant and Stillwater Township · Ramsey and Washington counties

Conditions now

Loading the weather near Lake Elmo…

Forecast by the National Weather Service for Lake Elmo · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Gateway State Trail is a multi-use recreational rail trail in the U.S. state of Minnesota, running 18 miles (29 km) from Saint Paul to Pine Point Regional Park in Stillwater. It runs through urban landscapes of eastern Saint Paul in Ramsey County and rural farmland and forests in Washington County. It was designated a National Recreation Trail in 2002.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Official website

Length
19.0 mi 30.6 km1
On former railbed
15.3 mi 81%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Dellwood Road mile 4.7 · restrooms directions to trailhead 1
  2. Parking at 55th Street North mile 9.8 · water directions to trailhead 2
  3. Parking at 55th Street North mile 9.8 · water directions to trailhead 3
  4. Gateway State Trail Parking mile 9.9 · water directions to Gateway State Trail Parking
  5. Parking at Glenbrook Avenue North mile 10.7 directions to trailhead 5
  6. Parking at Glenbrook Avenue North mile 10.7 directions to trailhead 6
  7. Parking at Centennial Drive mile 11.5 directions to trailhead 7
  8. Parking at Helen Street North mile 11.7 directions to trailhead 8
  9. Gateway Trail Parking mile 12 · restrooms · water directions to Gateway Trail Parking
  10. Parking at 4th Avenue East mile 12.1 directions to trailhead 10
  11. Parking at Van Dyke Street North mile 13.4 directions to trailhead 11
  12. Parking at White Bear Avenue North mile 13.5 directions to trailhead 12
  13. Parking at Skillman Avenue East mile 14.1 directions to trailhead 13
  14. Parking at Manton Street mile 14.2 directions to trailhead 14
  15. Parking at Clarence Street mile 14.3 directions to trailhead 15
  16. Parking at Frost Avenue mile 14.6 directions to trailhead 16
  17. Parking at Frost Avenue mile 14.9 · restrooms directions to trailhead 17
  18. Parking at Frost Avenue mile 15.2 directions to trailhead 18
  19. Parking at Arlington Avenue East mile 17 · water directions to trailhead 19
  20. Parking at North l'Orient Street mile 18.7 directions to trailhead 20
  21. Parking at North l'Orient Street mile 18.8 directions to trailhead 21
  22. Parking at East Mount Airy Street mile 18.9 directions to trailhead 22
  23. Parking at East Mount Airy Street mile 19 directions to trailhead 23
  24. Parking at East Mount Airy Street mile 19 directions to trailhead 24

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); National Recreation Trails database (NPS and American Trails).

Gateway State Trail.jpg (opens in a new tab)
Gateway State Trail.jpg · Photo: McGhiever · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Gateway State Trail is an 18-mile multiple-use trail managed by the Minnesota Department of Natural Resources (DNR). It begins in St. Paul and runs northeast through Maplewood, North St. Paul and Oakdale into Washington County, ending at Pine Point Regional Park about four miles northwest of Stillwater. It follows a former Soo Line Railroad grade. The Interstate Commerce Commission authorized abandonment of the line in 1980 on condition of public use under DNR plans. After the Minnesota Supreme Court ruled that the right-of-way did not revert to adjoining landowners while it served public travel, the state acquired the corridor; the legislature funded construction in 1990 and the trail opened in 1993. It was designated a National Recreation Trail in 2002.

The paved trail crosses neighborhoods, parks, lakes, wetlands and fields in Ramsey and Washington counties. It connects with Phalen-Keller Regional Park, the Bruce Vento Regional Trail and, at Duluth Junction, the Browns Creek State Trail, which completed a link to downtown Stillwater in 2014. The western trailhead, at Cayuga Street and the Frontage Road/L'Orient in St. Paul, has street parking only. DNR lists parking lots at the North St. Paul trailhead beside the wind turbine, the Maplewood Community Center, Highway 36 and 2nd Street in North St. Paul, 55th Street near Highway 36 and I-694, the Mahtomedi Athletic Fields, Highway 96 near Lake Masterman in Grant, and Pine Point Regional Park, which charges a fee.

The trail is generally level and wheelchair accessible. East of I-694 an adjacent unpaved treadway of about 10 miles is open to horseback riding and carriage driving with a horse pass; no other pass is needed. In winter the trail is plowed from Cayuga Street to Jamaca Avenue in Grant, and the eastern part to Pine Point is left unmaintained for biking, hiking, snowshoeing and skiing.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

44% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Vadnais Lake, 10.3 km from the trail's middle, 23 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F253042566979838173594330
Low °F81124375060646254422816
Precipitation, in0.80.81.53.14.34.54.54.53.13.11.81.1
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1948 Stillwater sheet (1:62,500); the 1951 White Bear Lake East sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in 2024 and 2025 suggested linking the Gateway to the Browns Creek trail for a long ride to Stillwater; one favored starting in Maplewood or North St. Paul, another noted restroom stops. r/Minneapolis, Jun 2024 · r/CyclingMSP, May 2025
  • In 2026 riders described loops joining the Gateway with Lake Phalen, the Bruce Vento trail and Wheelock Parkway, and one said the route from Phalen toward Keller Lake passes beneath the Gateway. r/saintpaul, May 2026
3 Reddit threads about this trail, Jun 2024 to May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 2114073, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Gateway State Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q5527290, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Official trail website · Official site · checked Oct 31, 2026
  5. Gateway State Trail — Minnesota DNR · government source · checked Oct 14, 2026
    Supports: 18 miles; St. Paul through Maplewood, North St. Paul and Oakdale to Pine Point Regional Park four miles northwest of Stillwater; former Soo Line grade; level and wheelchair accessible; landscapes in Ramsey and Washington counties; connections to Phalen-Keller, Bruce Vento, Browns Creek State Trail at Duluth Junction; parking list and Cayuga Street trailhead; unpaved horse treadway east of I-694 and horse pass; no other fees; winter plowing Cayuga Street to Jamaca Avenue
  6. Gateway State Trail — Wikipedia · organization · checked Oct 14, 2026
    Supports: 1980 ICC abandonment conditioned on public use; Minnesota Supreme Court reversion ruling; acquisition; 1990 construction funding; 1993 opening; National Recreation Trail 2002; Stillwater connection via Brown's Creek State Trail completed 2014; managed by DNR

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.