States › Texas

Cedar Crest Trail

Rail-trail in Texas · OpenStreetMap relation

Runs through Dallas · Dallas County

Conditions now

Loading the weather near Dallas…

Forecast by the National Weather Service for Dallas · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.3 mi 3.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Harlandale Avenue mile 1.7 directions to trailhead 1
  2. Parking at East Illinois Avenue mile 2.3 directions to trailhead 2
Cedar Crest Trail drawn on the 1958 USGS topographic map of Oak Cliff, Texas
Then: the 1958 USGS Oak Cliff sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Cedar Crest Trail is a paved trail in southern Dallas, Texas, the longer of the two segments of the Honey Springs-Cedar Crest Trail. Dallas County designed and built the trail on land supplied by the City of Dallas: land along an Oncor utility corridor and city park property. Press coverage of the opening reported that it was built inside an old interurban rail corridor; the sources found do not name the railway. A March 2020 county status report listed $5.94 million in county funds for the Cedar Crest-Honey Springs project, described as a seven-mile trail and on-street system giving east-west and north-south access across the southern part of the city, and said about three-fourths of an improperly built section had been replaced. Scheduled for 2020, the trail opened with a ribbon cutting in October 2021, at a total cost of $7 million, about $6 million of it from the county.

According to TrailLink, the Cedar Crest Trail stretches almost 3 miles to the south and west along an Oncor transmission corridor, with DART's Illinois Station and South Oak Cliff Renaissance Park on its route; the Honey Springs Trail, just over a mile long, runs along another Oncor corridor from 2403 Skylark Drive south to Fordham Road. The trail also gives access to Cedar Crest Golf Course.

This record maps about 2.3 miles of the Cedar Crest segment: a north-south section from near East Illinois Avenue and Harlandale Avenue and an east-west section to the west. The Honey Springs segment is not part of this record. The path is mapped as concrete about 12 feet wide, with asphalt at many road crossings. The nearby John C. Phelps Trail curves around Cedar Crest Golf Course.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

7% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Dallas Redbird Airport, 6.4 km from the trail's middle, 27 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F576269768491969689796759
Low °F384148556472757568584739
Precipitation, in2.52.63.63.74.33.91.91.834.52.83.1
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Dallas sheet (1:125,000); the 1958 Oak Cliff sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 17737832, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Status of County Open Space/Trail Projects (March 17, 2020) — Dallas County · organization · checked Oct 15, 2026
    Supports: Cedar Crest-Honey Springs Trail, Dallas, $5,935,161 county funding; seven-mile trail/on-street system with east-west and north-south access in the southern part of the city; about three-fourths of the improperly constructed trail replaced
  3. Honey Springs Cedar Crest Trail Now Open — Dallas Express (October 25, 2021) · press · checked Oct 15, 2026
    Supports: ribbon cutting in October 2021; Oncor land and Dallas park property; built inside an old interurban rail corridor (citing WFAA); connects to Cedar Crest Golf Course and South Oak Cliff Renaissance Park; scheduled for 2020; $7 million cost, $6 million from Dallas County; city supplied land, county designed and built
  4. Honey Springs-Cedar Crest Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 15, 2026
    Supports: two segments; Cedar Crest Trail almost three miles south and west along an ONCOR transmission corridor, including DART Illinois Station and South Oak Cliff Renaissance Park; Honey Springs Trail just over a mile, 2403 Skylark Dr to Fordham Rd; John C. Phelps Trail curving around Cedar Crest Golf Course
  5. OpenStreetMap ways named Cedar Crest Trail — OpenStreetMap · web · checked Oct 15, 2026
    Supports: mapped length and shape; concrete surface, width 3.7 m, asphalt crossings; trailheads near East Illinois Avenue and Harlandale Avenue

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.