Five Mile Creek Trail
Greenway in Texas · OpenStreetMap relation
Runs through Dallas · Dallas County
Conditions now
Loading the weather near Dallas…
Forecast by the National Weather Service for Dallas · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Five Mile Creek Trail is a concrete trail in the City of Dallas trail system in southern Oak Cliff, Dallas, along Five Mile Creek. A Texas Department of Licensing and Regulation accessibility filing registered in July 2011 names the City of Dallas Park and Recreation Department as owner of the Five Mile Creek Hike and Bike Trail, Phase I, a 12-foot concrete trail of about 2.8 miles from Glendale Park, with construction scheduled from November 2011 to May 2012. It is a creek trail, not a rail-trail.
This record maps about 2.1 miles in two pieces. The western piece runs beside East Pentagon Parkway from a crossing of South Marsalis Avenue east to the parkway near Kingsley Drive. The eastern piece starts at the Glendale Park trail, crosses two bridges and ends at East Pentagon Parkway farther east. TrailLink gives the trail as 1.3 miles of concrete between South Marsalis Avenue and East Pentagon Parkway, with no designated parking. OpenStreetMap tags the path for bicycles and pedestrians and carries it as a bicycle route with the reference FMC.
The trail lies within the planned Five Mile Creek Greenbelt, a project of the Trust for Public Land and the City of Dallas for 17 miles of trail and three parks serving Oak Cliff. In October 2023 the Texas Department of Transportation awarded $6.6 million from its Transportation Alternatives Set-Aside program, matched by $1.65 million from local supporters, toward a 1.1-mile shovel-ready stretch, with construction then expected to begin as early as 2024. At that time the Trust for Public Land had raised more than $35 million of an estimated $78 million needed to complete the greenbelt's parks and trails.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
21% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Dallas Redbird Airport, 6.6 km from the trail's middle, 64 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 57 62 69 76 84 91 96 96 89 79 67 59 Low °F 38 41 48 55 64 72 75 75 68 58 47 39 Precipitation, in 2.5 2.6 3.6 3.7 4.3 3.9 1.9 1.8 3 4.5 2.8 3.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 Dallas sheet (1:125,000); the 1958 Oak Cliff sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Runyon Creek Trail within 0.2 mi · 2.8 mi, paved
- Cedar Crest Trail 0.9 mi away · 2.3 mi, paved
- Kiestwood Trail 2.1 mi away · 2.0 mi, paved
- Kiest Park Trail 2.4 mi away · 2.5 mi, paved
- Trinity Forest Trail 2.7 mi away · 10.8 mi, paved
- AT&T Trail 3.2 mi away · 4.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 17730291, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Project EABPRJB1815054, Five Mile Creek Hike Trail Phase I — Texas Department of Licensing and Regulation (Architectural Barriers project details) · government source · checked Oct 15, 2026 Supports: facility name Five Mile Creek Hike and Bike Trail; registration July 2011; owner City of Dallas Park and Recreation Department; scope a 12-foot concrete trail connecting Glendale Park to another park, about 2.8 miles; scheduled start November 2011 and completion May 2012
- TXDOT Paves $6.6M Way for Five Mile Creek Greenbelt's Oak Cliff Trail in Southern Dallas — Dallas Innovates (October 27, 2023) · web · checked Oct 15, 2026 Supports: Trust for Public Land and City of Dallas project; 17 miles of trail and three parks for Oak Cliff; $6.6 million TxDOT Transportation Alternatives Set-Aside grant and $1.65 million local match for a 1.1-mile shovel-ready stretch; construction as early as the next year; more than $35 million raised of an estimated $78 million
- Five Mile Creek Trail — TrailLink · web · checked Oct 15, 2026 Supports: part of the City of Dallas trails system; 1.3 miles; concrete; endpoints South Marsalis Avenue and East Pentagon Parkway; no designated parking
- Five Mile Creek Trail — OpenStreetMap relation 17730291 · web · checked Oct 15, 2026 Supports: mapped length and two pieces; crossing of South Marsalis Avenue; route beside East Pentagon Parkway to near Kingsley Drive; eastern piece from the Glendale Park Trail with two bridges to East Pentagon Parkway; concrete surface, bicycle and foot designated; bicycle route reference FMC
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.