States › Iowa

CeMar Trail

Rail-trail in Iowa · OpenStreetMap relation

Runs through Cedar Rapids and Marion · Linn County

Conditions now

Loading the weather near Cedar Rapids…

Forecast by the National Weather Service for Cedar Rapids · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.6 mi 7.4 km1
On former railbed
2.1 mi 46%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Armar Drive Southeast mile 1.1 directions to trailhead 1
  2. Parking at 33rd Street Drive Southeast mile 2.8 directions to trailhead 2
  3. Parking at 33rd Street Drive Southeast mile 2.9 directions to trailhead 3
  4. Parking at 32nd Street Drive Southeast mile 3 directions to trailhead 4
  5. Parking at 32nd Street Drive Southeast mile 3 directions to trailhead 5
  6. Parking at 32nd Street Drive Southeast mile 3.1 directions to trailhead 6
  7. Parking at 32nd Street Drive Southeast mile 3.1 directions to trailhead 7
  8. Parking at 31st Street Northeast mile 3.1 directions to trailhead 8
  9. Parking at 31st Street Northeast mile 3.1 directions to trailhead 9
  10. Parking at 30th Street Drive Southeast mile 3.2 directions to trailhead 10
  11. Parking at 1st Avenue East mile 3.3 directions to trailhead 11
  12. Parking at 29th Street Northeast mile 3.4 directions to trailhead 12
  13. Parking at A Avenue Northeast mile 3.4 directions to trailhead 13
  14. Parking at 29th Street Northeast mile 3.4 directions to trailhead 14
  15. Parking at 27th Street Northeast mile 3.6 directions to trailhead 15
  16. Parking at K Avenue Northeast mile 4 directions to trailhead 16
  17. Parking at E Avenue Northeast mile 4.3 directions to trailhead 17
  18. Parking at 17th Street Northeast mile 4.6 directions to trailhead 18
  19. Parking at E Avenue Northeast mile 4.6 directions to trailhead 19
  20. Parking at E Avenue Northeast mile 4.6 directions to trailhead 20
  21. Parking at 17th Street Northeast mile 4.6 directions to trailhead 21
  22. Parking at 17th Street Northeast mile 4.6 directions to trailhead 22
  23. Parking at E Avenue Northeast mile 4.7 directions to trailhead 23
  24. Parking at 16th Street Northeast mile 4.8 directions to trailhead 24
  25. Parking at Oakland Road Northeast mile 4.9 directions to trailhead 25
  26. Parking at Oakland Road Northeast mile 5 directions to trailhead 26
  27. Parking at Brown Avenue Northeast mile 5.3 directions to trailhead 27
  28. Parking at 11th Street Northeast mile 5.3 directions to trailhead 28
  29. Parking at Shaver Road Northeast mile 5.4 · restrooms · water directions to trailhead 29
Douglas and Charlotte Grant House, beside the trail (opens in a new tab)
Douglas and Charlotte Grant House, beside the trail · Photo: ABreiholz · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The CeMar Trail is a paved urban trail between Cedar Rapids and Marion in Linn County, Iowa. It begins at Cedar Lake in Cedar Rapids, where it meets the Cedar Valley Nature Trail, and ends in Marion at the Grant Wood and Boyson trails. The project was planned in five phases to connect downtown Cedar Rapids with uptown Marion, and the Linn County Trails Association, a nonprofit trail advocacy group, has followed and promoted its construction.

From the Cedar Lake trailhead near Shaver Road NE and H Avenue NE, the route follows a bike lane on H Avenue NE to Daniels Park, where the separate paved trail begins. It continues northeast through the Mount Mercy University athletic complex to 29th Street NE and passes under First Avenue through a trail-only underpass with LED lighting, completed in 2021. Crosswalks with push-button flashing lights mark the crossings at 27th and 29th streets NE. The trail then runs to 33rd Street Drive SE and through Mount Calvary Cemetery, and in Marion it winds through Thomas Park to the Grant Wood Trail. Work in Marion in 2020 included rebuilding a railroad bridge over Indian Creek and reusing an existing bridge structure as a trail bridge over Marion Boulevard. Parking, a restroom and a bicycle repair station are at the Cedar Lake trailhead.

For years the trail was in two pieces: 2.7 miles from Cedar Lake to 33rd Street Drive SE, and 1.5 miles in Marion from near Highway 100 to the Grant Wood and Boyson trails. The final phase, a 3.9-mile link from 33rd Street Drive SE through Faulkes Woods to Highway 100, required three prefabricated bridges over Indian Creek. Two had been delivered by June 2026, and by August the bridges were in and paving was nearly finished. The Linn County Trails Association announced a ribbon cutting for the completed trail on October 5, 2026, at Mount Calvary Cemetery.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

Former Chicago, Milwaukee & St. Paul / Chicago, Milwaukee, St. Paul & Pacific / Canadian National line, built 1865–1888, abandoned 1888–2002 in sections. From Iowa DOT Rail Line Abandoned (CC BY 4.0).

Shade

5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Cedar Rapids #1, 5.7 km from the trail's middle, 7 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303549637482868377644835
Low °F121728385060636153422919
Precipitation, in1.21.32.144.75.74.54.4432.21.7
Snow, in8.78.341.5000000.62.29
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Marion sheet (1:62,500); the 1967 Cedar Rapids North sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 10323694, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. CeMar Trail — Linn County Trails Association · organization · checked Oct 15, 2026
    Supports: paved urban trail and bike lane; Cedar Lake trailhead near Shaver Road NE and H Avenue NE; bike lane on H Avenue NE to Daniels Park; route through Mount Mercy University athletic complex to 29th Street NE; First Avenue underpass completed 2021 with LED lighting; flashing-light crosswalks at 27th and 29th streets NE; Thomas Park and Grant Wood Trail; connections to CVNT, Boyson and Grant Wood trails; parking, restroom and repair station at Cedar Lake; 2.7-mile and 1.5-mile built sections; 3.9-mile connecting segment through Faulkes Woods to Highway 100
  3. April 2026 Trail News — Linn County Trails Association · organization · checked Oct 15, 2026
    Supports: 2026 work on abutments for three bridges over Indian Creek, prefabricated bridges and hard-surface trail
  4. June 2026 Trail News — Linn County Trails Association · organization · checked Oct 15, 2026
    Supports: two of three bridges for CeMar Phase 5 delivered; final bridge near Mount Calvary Cemetery; opening planned for fall 2026
  5. August 2026 Trail News — Linn County Trails Association · organization · checked Oct 15, 2026
    Supports: bridges in and paving almost done by August 2026
  6. September 2026 LCTA News — Linn County Trails Association · organization · checked Oct 15, 2026
    Supports: CeMar ribbon cutting moved to October 5, 2026, at Mount Calvary Cemetery
  7. CeMar trail project begins construction — CBS2 Iowa (2020) · web · checked Oct 15, 2026
    Supports: project linking uptown Marion and downtown Cedar Rapids split into five phases; reconstruction of the railroad bridge over Indian Creek; reuse of the bridge structure as a trail bridge over Marion Boulevard

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.