CeMar Trail
Rail-trail in Iowa · OpenStreetMap relation
Runs through Cedar Rapids and Marion · Linn County
Conditions now
Loading the weather near Cedar Rapids…
Forecast by the National Weather Service for Cedar Rapids · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Armar Drive Southeast mile 1.1 directions to trailhead 1
- Parking at 33rd Street Drive Southeast mile 2.8 directions to trailhead 2
- Parking at 33rd Street Drive Southeast mile 2.9 directions to trailhead 3
- Parking at 32nd Street Drive Southeast mile 3 directions to trailhead 4
- Parking at 32nd Street Drive Southeast mile 3 directions to trailhead 5
- Parking at 32nd Street Drive Southeast mile 3.1 directions to trailhead 6
- Parking at 32nd Street Drive Southeast mile 3.1 directions to trailhead 7
- Parking at 31st Street Northeast mile 3.1 directions to trailhead 8
- Parking at 31st Street Northeast mile 3.1 directions to trailhead 9
- Parking at 30th Street Drive Southeast mile 3.2 directions to trailhead 10
- Parking at 1st Avenue East mile 3.3 directions to trailhead 11
- Parking at 29th Street Northeast mile 3.4 directions to trailhead 12
- Parking at A Avenue Northeast mile 3.4 directions to trailhead 13
- Parking at 29th Street Northeast mile 3.4 directions to trailhead 14
- Parking at 27th Street Northeast mile 3.6 directions to trailhead 15
- Parking at K Avenue Northeast mile 4 directions to trailhead 16
- Parking at E Avenue Northeast mile 4.3 directions to trailhead 17
- Parking at 17th Street Northeast mile 4.6 directions to trailhead 18
- Parking at E Avenue Northeast mile 4.6 directions to trailhead 19
- Parking at E Avenue Northeast mile 4.6 directions to trailhead 20
- Parking at 17th Street Northeast mile 4.6 directions to trailhead 21
- Parking at 17th Street Northeast mile 4.6 directions to trailhead 22
- Parking at E Avenue Northeast mile 4.7 directions to trailhead 23
- Parking at 16th Street Northeast mile 4.8 directions to trailhead 24
- Parking at Oakland Road Northeast mile 4.9 directions to trailhead 25
- Parking at Oakland Road Northeast mile 5 directions to trailhead 26
- Parking at Brown Avenue Northeast mile 5.3 directions to trailhead 27
- Parking at 11th Street Northeast mile 5.3 directions to trailhead 28
- Parking at Shaver Road Northeast mile 5.4 · restrooms · water directions to trailhead 29
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The CeMar Trail is a paved urban trail between Cedar Rapids and Marion in Linn County, Iowa. It begins at Cedar Lake in Cedar Rapids, where it meets the Cedar Valley Nature Trail, and ends in Marion at the Grant Wood and Boyson trails. The project was planned in five phases to connect downtown Cedar Rapids with uptown Marion, and the Linn County Trails Association, a nonprofit trail advocacy group, has followed and promoted its construction.
From the Cedar Lake trailhead near Shaver Road NE and H Avenue NE, the route follows a bike lane on H Avenue NE to Daniels Park, where the separate paved trail begins. It continues northeast through the Mount Mercy University athletic complex to 29th Street NE and passes under First Avenue through a trail-only underpass with LED lighting, completed in 2021. Crosswalks with push-button flashing lights mark the crossings at 27th and 29th streets NE. The trail then runs to 33rd Street Drive SE and through Mount Calvary Cemetery, and in Marion it winds through Thomas Park to the Grant Wood Trail. Work in Marion in 2020 included rebuilding a railroad bridge over Indian Creek and reusing an existing bridge structure as a trail bridge over Marion Boulevard. Parking, a restroom and a bicycle repair station are at the Cedar Lake trailhead.
For years the trail was in two pieces: 2.7 miles from Cedar Lake to 33rd Street Drive SE, and 1.5 miles in Marion from near Highway 100 to the Grant Wood and Boyson trails. The final phase, a 3.9-mile link from 33rd Street Drive SE through Faulkes Woods to Highway 100, required three prefabricated bridges over Indian Creek. Two had been delivered by June 2026, and by August the bridges were in and paving was nearly finished. The Linn County Trails Association announced a ribbon cutting for the completed trail on October 5, 2026, at Mount Calvary Cemetery.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
Former Chicago, Milwaukee & St. Paul / Chicago, Milwaukee, St. Paul & Pacific / Canadian National line, built 1865–1888, abandoned 1888–2002 in sections. From Iowa DOT Rail Line Abandoned (CC BY 4.0).
- Shade
5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Cedar Rapids #1, 5.7 km from the trail's middle, 7 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 35 49 63 74 82 86 83 77 64 48 35 Low °F 12 17 28 38 50 60 63 61 53 42 29 19 Precipitation, in 1.2 1.3 2.1 4 4.7 5.7 4.5 4.4 4 3 2.2 1.7 Snow, in 8.7 8.3 4 1.5 0 0 0 0 0 0.6 2.2 9 - On the National Register
- B Avenue NE Historic District, Cedar Rapids · historic district, listed 2013
- Old maps
USGS topographic maps of the trail's middle go back to the 1888 Marion sheet (1:62,500); the 1967 Cedar Rapids North sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationLinn County Trails Association: CeMar Trail
Nearby trails
- Boyson Trail within 0.2 mi · 2.5 mi, gravel
- Grant Wood Trail within 0.2 mi · 17.9 mi, paved
- Indian Creek Trail 0.2 mi away · 7.0 mi, paved
- Ellis Trail 0.6 mi away · 2.7 mi, paved
- Cedar River Trail 0.8 mi away · 4.8 mi, paved
- Cedar Valley Nature Trail 1.6 mi away · 50.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 10323694, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- CeMar Trail — Linn County Trails Association · organization · checked Oct 15, 2026 Supports: paved urban trail and bike lane; Cedar Lake trailhead near Shaver Road NE and H Avenue NE; bike lane on H Avenue NE to Daniels Park; route through Mount Mercy University athletic complex to 29th Street NE; First Avenue underpass completed 2021 with LED lighting; flashing-light crosswalks at 27th and 29th streets NE; Thomas Park and Grant Wood Trail; connections to CVNT, Boyson and Grant Wood trails; parking, restroom and repair station at Cedar Lake; 2.7-mile and 1.5-mile built sections; 3.9-mile connecting segment through Faulkes Woods to Highway 100
- April 2026 Trail News — Linn County Trails Association · organization · checked Oct 15, 2026 Supports: 2026 work on abutments for three bridges over Indian Creek, prefabricated bridges and hard-surface trail
- June 2026 Trail News — Linn County Trails Association · organization · checked Oct 15, 2026 Supports: two of three bridges for CeMar Phase 5 delivered; final bridge near Mount Calvary Cemetery; opening planned for fall 2026
- August 2026 Trail News — Linn County Trails Association · organization · checked Oct 15, 2026 Supports: bridges in and paving almost done by August 2026
- September 2026 LCTA News — Linn County Trails Association · organization · checked Oct 15, 2026 Supports: CeMar ribbon cutting moved to October 5, 2026, at Mount Calvary Cemetery
- CeMar trail project begins construction — CBS2 Iowa (2020) · web · checked Oct 15, 2026 Supports: project linking uptown Marion and downtown Cedar Rapids split into five phases; reconstruction of the railroad bridge over Indian Creek; reuse of the bridge structure as a trail bridge over Marion Boulevard
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.