Ellis Trail
Greenway in Iowa · OpenStreetMap relation
Runs through Cedar Rapids · Linn County
Conditions now
Loading the weather near Cedar Rapids…
Forecast by the National Weather Service for Cedar Rapids · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Edgewood Road Northwest mile 0.2 · restrooms directions to trailhead 1
- Parking at Oxford Lane Northwest mile 0.3 directions to trailhead 2
- Parking at Buckingham Drive Northwest mile 0.4 directions to trailhead 3
- Parking at Buckingham Drive Northwest mile 0.4 directions to trailhead 4
- Parking at Ellis Road Northwest mile 0.4 directions to trailhead 5
- Parking at Ellis Road Northwest mile 0.5 directions to trailhead 6
- Parking at Ellis Road Northwest mile 0.5 directions to trailhead 7
- Parking at Buckingham Drive Northwest mile 0.5 directions to trailhead 8
- Parking at Buckingham Drive Northwest mile 0.5 directions to trailhead 9
- Parking at Buckingham Drive Northwest mile 0.6 directions to trailhead 10
- Parking at Buckingham Drive Northwest mile 0.6 directions to trailhead 11
- Parking at Tranquil Court Northwest mile 1 directions to trailhead 12
- Parking at Ellis Boulevard Northwest mile 1.1 directions to trailhead 13
- Parking at Ellis Boulevard Northwest mile 1.3 directions to trailhead 14
- Parking at Ellis Boulevard Northwest mile 1.3 directions to trailhead 15
- Parking at 1st Street Northwest mile 2.7 directions to trailhead 16
- Parking at 1st Avenue West mile 3 directions to trailhead 17
(opens in a new tab) About this trail
The Ellis Trail is a paved path on the west bank of the Cedar River in Cedar Rapids, Iowa. It is a city trail, listed by the Cedar Rapids Parks and Recreation Department, and the Linn County Trails Association describes it as a connector linking neighborhoods to Ellis Park and downtown Cedar Rapids. It is a riverside greenway rather than a rail-trail. According to the association, the trail took on new life after the 2008 Cedar River flood, and part of it serves as a flood wall.
The city describes a 2.6-mile route that follows Robbins Lake and the river from Edgewood Road to downtown Cedar Rapids; the association gives 2.8 miles, from Edgewood Road along the river to the intersection of 1st Street NW and F Avenue NW. The route mapped here is about 3.1 miles. Along the way it passes Manhattan Park, the Ellis Boat Harbor, community gardens and Ellis Park, with its swimming pool and golf course. At the north end it links to the Edgewood Road trail.
The trail is 10 feet wide and paved, except for a couple of sections on sidewalk. In winter the city clears snow and ice from the stretch between 1927 Ellis Boulevard NW and Edgewood Road. High water can close it: in June 2020 the city closed the trail between Edgewood Road and Ellis Harbor when the river rose. The city is building a flood control system of levees, floodwalls and gates sized to carry the volume of the 2008 flood. In October 2026 crews were building a tie-off between the levee and Ellis Park at the Ellis Park parking lot, with completion expected by November.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
10% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Cedar Rapids #1, 10 km from the trail's middle, 26 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 35 49 63 74 82 86 83 77 64 48 35 Low °F 12 17 28 38 50 60 63 61 53 42 29 19 Precipitation, in 1.2 1.3 2.1 4 4.7 5.7 4.5 4.4 4 3 2.2 1.7 Snow, in 8.7 8.3 4 1.5 0 0 0 0 0 0.6 2.2 9 - On the National Register
- First Avenue Bridge, Cedar Rapids · structure, listed 1998 · nomination file for First Avenue Bridge
- Old maps
USGS topographic maps of the trail's middle go back to the 1887 Cedar Rapids sheet (1:62,500); the 1967 Cedar Rapids South sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationLinn County Trails Association
- Agency noticesCedar Rapids Parks and Recreation — Trails
Nearby trails
- Cedar River Trail within 0.2 mi · 4.8 mi, paved
- Edgewood Trail within 0.2 mi · 4.1 mi, paved
- Bowling Street Trail 0.5 mi away · 3.3 mi, paved
- CeMar Trail 0.6 mi away · 4.6 mi, paved
- Cedar Valley Nature Trail 0.8 mi away · 50.7 mi, paved
- Morgan Creek Trail 1.5 mi away · 3.9 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 10334950, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- Trails — Parks and Recreation, City of Cedar Rapids · organization · checked Oct 15, 2026 Supports: 2.6-mile paved trail on the west bank of the Cedar River, following Robbins Lake and the river from Edgewood Road to downtown; 10 feet wide except a couple of sidewalk sections; river, Ellis Boat Harbor and community gardens
- Winter Recreation — Parks and Recreation, City of Cedar Rapids · organization · checked Oct 15, 2026 Supports: Ellis Trail from 1927 Ellis Boulevard NW to Edgewood Road maintained for snow and ice in winter
- Project of the Week: Ellis Lane Tie-Off at Ellis Park Parking Lot — City of Cedar Rapids (October 9, 2026) · organization · checked Oct 15, 2026 Supports: tie-off between the levee and Ellis Park under construction, expected to wrap up the following month; Flood Control System of floodwalls, levees and gates designed to convey the 2008 flood volume
- Ellis Road — Linn County Trails Association · organization · checked Oct 15, 2026 Supports: 2.8 miles from Edgewood Road along the Cedar River to 1st St NW and F Ave NW; pavement; connector to Ellis Park and downtown; Manhattan Park, Ellis Park pool and golf; links to Edgewood Trail; came alive after the 2008 flood; part serves as a flood wall
- More Cedar Rapids roads, parks to close due to elevated river levels — KCRG (June 23, 2020) · web · checked Oct 15, 2026 Supports: June 2020 closure of the Ellis Trail between Edgewood Road and Ellis Harbor due to high water
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.