Centerra Trail
Greenway in Colorado
Runs through Loveland · Larimer County
Conditions now
Loading the weather near Loveland…
Forecast by the National Weather Service for Loveland · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Centerra Trail is a paved path of about 1.3 miles on the east side of Loveland, Colorado, managed by the City of Loveland. It runs between North Denver Avenue and North Boyd Lake Avenue along the south side of Boyd Lake, linking the Loveland Recreation Trail with the Centerra Neighborhood Trail.
In April 2020 the city announced $1,225,000 in grants to design and build the trail: money from the Colorado Department of Transportation's Transportation Alternatives Program and from the Multi Modal Options Fund managed by the North Front Range Metropolitan Planning Organization. The plan called for 1.34 miles of main trail and a proposed 0.43-mile spur to the existing Boyd Lake Trail, with the main trail connecting to a pedestrian underpass then under construction at North Boyd Lake Avenue as part of the Centerra Millennium development. The city said the grants meant no General Fund money would be needed. The connection between Denver Avenue and Boyd Lake Avenue was closed for construction from September 29, 2022, to May 1, 2023, with opening expected in spring 2023.
OpenStreetMap maps the trail as concrete, designated for bicycles and pedestrians, and shows it meeting the Civic Center Trail and reaching North Denver Avenue and North Boyd Lake Avenue at its ends.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: June and September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Loveland 2n, 5.1 km from the trail's middle, 35 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 44 46 56 62 71 83 89 87 79 65 53 44 Low °F 13 15 23 31 40 49 55 53 44 32 21 13 Precipitation, in 0.5 0.6 1.3 2.2 2.7 1.6 1.5 1.3 1.4 1.2 0.8 0.6 Snow, in 6 8.2 7.9 5.7 1.1 0 0 0 0 3.5 7 7.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1906 Loveland sheet (1:62,500); the 1960 Loveland sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Loveland Recreation Trail within 0.2 mi · 20.9 mi, paved
- Long View Trail 4.0 mi away · 4.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Future Centerra Trail — COTREX (Colorado Trail Explorer) · government source · checked Oct 17, 2026 Supports: City of Loveland, 1.3 miles, Denver Avenue to Boyd Lake Avenue, link between the Loveland Recreation Trail and Centerra Neighborhood Trail, construction closure dates, expected spring 2023 opening
- $1.225 Million In Grant Awards Will Pay For New Loveland South Boyd Lake Trail — K99 · web · checked Oct 17, 2026 Supports: April 2020 grant announcement, CDOT Transportation Alternatives Program and NFRMPO Multi Modal Options Fund, 1.34 miles plus proposed 0.43-mile spur, south shore of Boyd Lake, Boyd Lake Avenue underpass and Centerra Millennium, no General Fund money
- Centerra Trail, way 450602321 — OpenStreetMap · web · checked Oct 17, 2026 Supports: concrete surface, bicycle and foot designation, connection to the Civic Center Trail, ends at North Denver and North Boyd Lake avenues
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.