Loveland Recreation Trail
Greenway in Colorado · OpenStreetMap relation
Runs through Loveland · Larimer County
Conditions now
Loading the weather near Loveland…
Forecast by the National Weather Service for Loveland · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West 64th Street mile 2 directions to trailhead 1
- Parking at West 64th Street mile 2 directions to trailhead 2
- Parking at West 64th Street mile 2.1 directions to trailhead 3
- Long View Trailhead mile 3.1 · restrooms directions to Long View Trailhead
- Parking at Cuchara Court mile 7.6 directions to trailhead 5
- Parking at Tincup Court mile 7.8 directions to trailhead 6
- Parking at Falls Court mile 9 directions to trailhead 7
- Parking at West 1st Street mile 11.2 · restrooms directions to trailhead 8
- Parking at South Railroad Avenue mile 12 · restrooms directions to trailhead 9
- Parking mile 12.9 directions to trailhead 10
- Parking at 3rd Street Southeast mile 13.5 directions to trailhead 11
- Parking at East 1st Street mile 13.8 directions to trailhead 12
- Parking at East 1st Street mile 13.9 directions to trailhead 13
- Parking at East 3rd Street mile 14 directions to trailhead 14
- Parking at North Hayes Avenue mile 14 directions to trailhead 15
- Parking at Wellington Court mile 15.6 directions to trailhead 16
- Parking mile 16.9 directions to trailhead 17
- Parking mile 17.4 · restrooms directions to trailhead 18
- Parking mile 17.9 · restrooms directions to trailhead 19
- Parking mile 18.1 directions to trailhead 20
- Parking at North County Road 11C mile 18.4 directions to trailhead 21
- Parking at North County Road 11C mile 18.5 directions to trailhead 22
- Parking mile 18.8 · restrooms directions to trailhead 23
About this trail
The Loveland Recreation Trail is the City of Loveland's paved trail loop around the northern Colorado city. According to a May 2025 KDVR report, the city's Recreation Trail System was fully completed in 2021 and includes 31 miles of paved trail that encircle Loveland and connect to regional trails, among them the Colorado Front Range Trail and the Long View Trail. TrailLink lists the loop itself at 21.7 miles with a concrete surface and notes some short on-road connecting segments.
Much of the trail follows the Big Thompson River, passing Centennial Park, Fairgrounds Park and Seven Lakes Park, which have drinking fountains and restrooms. The loop also gives access to Boyd Lake State Park, where a day pass is required to enter. On the west side of Loveland it runs through farmland and neighborhoods and past Mehaffey Park. Parking is available at Centennial Park (977 West 1st Street), Fairgrounds Park (700 South Railroad Avenue), Seven Lakes Park (1975 Park Drive), inside Boyd Lake State Park and at a trailhead at 1323 West 57th Street.
Starting in fall 2024, the Parks and Recreation Department paved a 0.7-mile soft-surface section between Wilson Avenue and Namaqua Avenue along the Big Barnes Ditch and added rails; it reopened on June 1, 2025, and the city said the loop was then paved through all sections. The $1.3 million project was paid for with a federal Transportation Alternatives Program grant administered by the Colorado Department of Transportation and Loveland's share of Colorado Lottery money. Loveland also has more than 20 miles of soft-surface trails, but bicycles are not allowed on some of them, including the Mariana Butte Trail, Morey Wildlife Reserve and Sunset Vista Natural Area.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: June and September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Loveland 2n, 1.6 km from the trail's middle, 3 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 44 46 56 62 71 83 89 87 79 65 53 44 Low °F 13 15 23 31 40 49 55 53 44 32 21 13 Precipitation, in 0.5 0.6 1.3 2.2 2.7 1.6 1.5 1.3 1.4 1.2 0.8 0.6 Snow, in 6 8.2 7.9 5.7 1.1 0 0 0 0 3.5 7 7.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1906 Loveland sheet (1:62,500); the 1960 Loveland sheet (1:24,000) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Long View Trail within 0.2 mi · 4.2 mi, paved
- Centerra Trail within 0.2 mi · 1.4 mi, paved
- Power Trail 2.5 mi away · 4.4 mi, paved
- Fossil Creek Trail 2.5 mi away · 7.9 mi, paved
- Mason Trail 3.7 mi away · 4.7 mi, paved
- Poudre River Trail 4.6 mi away · 42.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9586117, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Section of Loveland's Recreation Trail Loop under construction to reopen June 1 — KDVR FOX31 (via Yahoo News), May 30, 2025 · web · checked Oct 17, 2026 Supports: system completed 2021, 31 miles paved, regional connections, 0.7-mile Wilson-Namaqua section paving, fall 2024 start, June 1 reopening, paved through all sections, $1.3 million funding, soft-surface trails and bike restrictions
- Loveland Recreation Trail — TrailLink · web · checked Oct 17, 2026 Supports: 21.7-mile loop, concrete, short on-road segments, Big Thompson River, parks passed, Boyd Lake State Park day pass, west-side setting, Mehaffey Park, parking addresses, 57th Street trailhead
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.