Chadwick Flyer Trail
Greenway in Missouri
Runs through Springfield and Ozark · Greene and Christian counties
Conditions now
Loading the weather near Ozark…
Forecast by the National Weather Service for Ozark · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at South Farm Road 167 mile 6.5 directions to trailhead 1
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Chadwick Flyer Trail is a rail-trail under construction between Ozark and Springfield, Missouri, on the bed of the old Chadwick Flyer Railroad. It is being built in segments by the City of Ozark in partnership with Ozark Greenways, which plans about 12 miles from the Ozark Community Center to Sunshine Street in Springfield, with an eventual extension to downtown Springfield. In November 2020 the Springfield Business Journal described the trail as the 7.5-mile southern portion of a 17-mile rail line, with nearly one mile built.
The first three phases run from the Ozark Community Center to Clay Street; from Biagio Street to 21st Street in front of Olde World Estates; and from Kissick Avenue in Springfield to a dead end near Westwind Drive in Ozark. Ozark Greenways counts about 1.4 miles completed in three segments in Ozark and 1.8 miles in Greene County near the Springfield power plant. Phase 4 carries the trail over U.S. 65 on a bicycle and pedestrian bridge, which opened in April 2026 while railings and other final elements were still being installed and had its ribbon cutting on May 14, 2026; KY3 reported a cost of about $5.4 million, roughly 20 percent of it paid by the City of Ozark and the rest by grants. Phase 5, connecting Phase 2 with Phase 4, was still in progress as of April 2026. The trail runs through the center of Ozark, connecting schools, the community center, the Finley River area and neighborhoods.
Ozark Greenways and partner agencies, including the City of Springfield, are funding the design of a 5.5-mile section from Kissick Avenue to Sunshine Street, starting with the stretch from Kissick Avenue to the James River Greenway's Trail of Honor. The line mapped here is about 5 miles, about 3.1 of them on the railbed; Ozark Greenways asks trail users to give an audible signal when passing and to keep pets leashed.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Oldfield, 21.4 km from the trail's middle, 11 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 41 47 56 67 74 81 86 85 78 68 55 45 Low °F 20 21 30 39 50 57 61 59 51 40 30 21 Precipitation, in 2.6 2.8 4 5.2 5.1 4.7 4.7 4.3 4.8 3.2 4 3.1 Snow, in 5.1 3.6 3.6 0.1 0 0 0 0 0 0.1 0.4 3.8 - Old maps
USGS topographic maps of the trail's middle go back to the 1884 Springfield sheet (1:125,000); the 1945 Ozark sheet (1:62,500) shows the area at mid-century. Browse all 11 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationChadwick Flyer Trail — Ozark Greenways
- RedditSearch Reddit: r/missouri
Nearby trails
- Galloway Creek Greenway 1.5 mi away · 4.9 mi, paved
- Ward Branch Greenway 2.3 mi away · 3.3 mi, paved
- Kansas Extension Multi-use Path 2.8 mi away · 2.7 mi, paved
- South Creek Greenway Trail 4.3 mi away · 6.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Chadwick Flyer Bridge opens to the public — KSMU, April 1, 2026 · organization · checked Oct 15, 2026 Supports: bridge over Highway 65 open with temporary safety measures, railings and panels still to be installed; City of Ozark in partnership with Ozark Greenways; follows the old Chadwick Flyer Railroad bed from Ozark to Springfield; Phases 1-3 endpoints; Phase 4 includes the bridge; Phase 5 connects Phase 2 to Phase 4; trail runs through Ozark connecting schools, the OC, the Finley River area and neighborhoods; Ozark Community Center to Sunshine Street, eventually downtown Springfield
- Chadwick Flyer Trail — Ozark Greenways · organization · checked Oct 15, 2026 Supports: about 12 miles planned between Sunshine Street and the Ozark Community Center; 1.4 miles completed in three segments in Ozark and 1.8 miles in Greene County by the Springfield power plant; trail etiquette (audible signal, leashed pets)
- Chadwick Flyer Trail Update — Ozark Greenways · organization · checked Oct 15, 2026 Supports: design of a 5.5-mile section from Kissick Avenue to Sunshine Street, first phase from Kissick Avenue to the James River Greenway Trail of Honor; partners
- Huge piece for interconnected trail system in from Springfield to Ozark is open — KY3, May 14, 2026 · web · checked Oct 15, 2026 Supports: ribbon cutting May 14, 2026; old railway corridor; project cost about $5.4 million, split among grants with the city paying about 20 percent
- Chadwick Flyer Trail gains momentum — Springfield Business Journal, November 23, 2020 · web · checked Oct 15, 2026 Supports: 7.5-mile southern portion of a 17-mile rail line; nearly one mile built at the time
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.