Ward Branch Greenway
Greenway in Missouri
Runs through Springfield · Greene County
Conditions now
Loading the weather near Springfield…
Forecast by the National Weather Service for Springfield · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West Lakewood Street mile 1.9 directions to trailhead 1
- Parking at South Farm Road 141 mile 3.8 directions to trailhead 2
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Ward Branch Greenway is a paved trail in south Springfield, Missouri. It is part of the greenway system described by Ozark Greenways, which lists it at 4 miles in two separate segments that are planned eventually to connect. In September 2025 the City of Springfield introduced Council Bill 2025-199, an intergovernmental agreement with the Ozarks Transportation Organization to build an extension of the Ward Branch Greenway Trail, with $99,337 from the Public Works budget as the 20 percent local match.
One segment links Burrell Center Lake with Twin Oaks Park and the Twin Oaks substation on Republic Road, continuing to The Library Center on South Campbell Avenue. The other runs about 2 miles from Wanda Gray Elementary School to the Missouri Institute of Natural Science and its Riverbluff Cave museum, across the road from Rivercut Golf Course; this section is wooded and winds back and forth along Ward Branch creek. Ozark Greenways also lists a trail connection under the James River Freeway (U.S. 60), a tie-in to about a mile of bike lanes on Republic Road between Campbell and Fremont avenues, and a connection to The Link, a signed 8-mile bike and walking route from Doling Park to Twin Oaks Park.
The surface is mixed asphalt and concrete with minimal inclines, and the trail is open during daylight hours only. Parking is at the Twin Oaks Substation Trailhead, 620 E. Monastery Street; The Library Center, 4653 S. Campbell Avenue; Wanda Gray Elementary School, 2101 W. Farm Road 182; and the Missouri Institute of Natural Science, 2327 W. Farm Road 190. The record maps about 3.3 miles.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Springfield, 15 km from the trail's middle, 28 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 44 50 59 68 76 85 90 89 81 70 57 47 Low °F 24 28 36 46 56 65 69 67 59 47 36 28 Precipitation, in 2.5 2.4 3.5 4.7 5.6 4.5 3.9 3.6 4.3 3.6 3.6 2.6 Snow, in 4.4 3.3 2 0.1 0 0 0 0 0 0 0.6 3.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1884 Springfield sheet (1:125,000); the 1960 Springfield sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationWard Branch Greenway — Ozark Greenways
Nearby trails
- Kansas Extension Multi-use Path 0.3 mi away · 2.7 mi, paved
- South Creek Greenway Trail 1.6 mi away · 6.1 mi, paved
- Galloway Creek Greenway 2.1 mi away · 4.9 mi, paved
- Chadwick Flyer Trail 2.3 mi away · 5.0 mi, paved
- Wilson's Creek Greenway Trail 3.4 mi away · 6.1 mi, paved
- Jordan Creek Greenway 4.0 mi away · 2.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- City Council Noted Agenda, September 8, 2025 — City of Springfield, Missouri · government source · checked Oct 15, 2026 Supports: Council Bill 2025-199: intergovernmental agreement with the Ozarks Transportation Organization to construct an extension of the Ward Branch Greenway Trail; $99,337 Public Works budget amendment as a 20% match
- Ward Branch Greenway — Ozark Greenways · organization · checked Oct 15, 2026 Supports: two segments planned to connect; Burrell Center Lake to Twin Oaks Park/substation on Republic Road and The Library Center; 2-mile segment from Wanda Gray Elementary to River Bluff Cave museum across from Rivercut Golf Course, wooded along Ward Branch; James River Freeway underpass; Republic Road bike lanes; The Link; parking addresses; 4 miles in 2 segments; mixed asphalt and concrete; daylight hours
- OpenStreetMap ways for Ward Branch Greenway — OpenStreetMap contributors · web · checked Oct 15, 2026 Supports: mapped length about 3.3 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.