States › Massachusetts

Chelsea Greenway

Rail-trail in Massachusetts · OpenStreetMap relation

Runs through Chelsea · Suffolk County

Conditions now

Loading the weather near Chelsea…

Forecast by the National Weather Service for Chelsea · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
0.7 mi 1.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Library Street mile 0.1 directions to trailhead 1
  2. Parking at Gerrish Avenue mile 0.2 · water directions to trailhead 2
Chelsea Greenway west of Box District station, July 2021.jpg (opens in a new tab)
Chelsea Greenway west of Box District station, July 2021.jpg · Photo: Pi.1415926535 · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Chelsea Greenway is a 0.7-mile linear park and shared-use path in the Box District of Chelsea, Massachusetts, running beside the MBTA Silver Line busway on the former Grand Junction right-of-way. The Grand Junction Railroad, chartered in 1847 as a rechartering of the Chelsea Branch Railroad, carried freight through Everett and Chelsea to the East Boston docks. Its Chelsea tracks fell largely out of use after the Chelsea Creek drawbridge was closed in 1955; CSX filed to abandon the section from Everett to East Boston in 2002, and the state bought the corridor from CSX under an agreement signed in 2009.

In October 2013 the state announced $3 million for the greenway as part of the Silver Line Gateway project, then expected to be finished in 2015. The plan described a three-quarter-mile green space from Chestnut Street to Eastern Avenue with room for walking and cycling, benches, grass and plantings, and the City of Chelsea agreed to pay for its upkeep. The greenway opened with the busway in 2018, when SL3 service to Chelsea began on April 21, and $1.1 million was spent on landscaping and native plantings in 2019.

The path links Bellingham Square and Eastern Avenue stations and runs along the south side of the busway at Box District station, for which it is the main access route. At Chestnut Street it is the starting point of a Chelsea–Everett connector studied by the Metropolitan Area Planning Council, which would run to Mystic Mall and on toward the Northern Strand Trail in Everett; early design of the segment from the greenway to Spruce Street is planned for 2026 and 2027.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Boston Logan International Airport, 3.8 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F373946566676828073625242
Low °F232531415060666558483829
Precipitation, in3.43.24.23.63.23.93.33.23.643.74.3
Snow, in14.314.491.6000000.20.79
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1893 Boston sheet (1:62,500); the 1956 Boston North sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 11215086, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Chelsea Greenway — Wikipedia · organization · checked Oct 13, 2026
    Supports: 0.7-mile linear park in the Box District, parallel to the Silver Line busway on the former Grand Junction right-of-way, connects Bellingham Square and Eastern Avenue stations, October 2013 $3 million announcement, opened 2018 with the busway, $1.1 million landscaping in 2019
  3. Grand Junction Railroad — Wikipedia · organization · checked Oct 13, 2026
    Supports: 1847 charter as a rechartering of the Chelsea Branch Railroad, Chelsea Creek drawbridge closed 1955, 2002 CSX abandonment filing, state purchase agreement signed 2009, SL3 service April 21, 2018
  4. Box District station — Wikipedia · organization · checked Oct 13, 2026
    Supports: freight line to the East Boston docks through Everett and Chelsea, Chelsea tracks largely out of use after 1955, greenway on the south side of the busway as the station's primary access route
  5. Chelsea Everett Greenway Connector — Metropolitan Area Planning Council · organization · checked Oct 13, 2026
    Supports: connector from the Chelsea Greenway at Chestnut Street to Mystic Mall and toward the Northern Strand Trail, early design to Spruce Street in 2026–2027
  6. State to spend $3 million to create Chelsea greenway park — Boston.com (October 30, 2013) · press · checked Oct 13, 2026
    Supports: three-quarter-mile green space from Chestnut Street to Eastern Avenue on the former Grand Junction track, room for bike rides and walks, benches, grass and plantings, City of Chelsea to pay for upkeep

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.