States › Massachusetts

East Boston Greenway

Rail-trail in Massachusetts · OpenStreetMap relation

Runs through Boston · Suffolk County

Conditions now

Loading the weather near Boston…

Forecast by the National Weather Service for Boston · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.2 mi 3.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Constitution Beach Road mile 0.1 directions to trailhead 1
  2. Parking at Constitution Beach Road mile 0.2 · restrooms · water directions to trailhead 2
  3. Parking at Constitution Beach Road mile 0.3 · restrooms · water directions to trailhead 3
  4. Parking at Westbrook Street mile 0.3 · restrooms · water directions to trailhead 4
  5. Parking at Constitution Beach Road mile 0.4 · restrooms · water directions to trailhead 5
  6. Parking at Horace Street mile 0.4 · water directions to trailhead 6
  7. Parking at Horace Street mile 0.8 directions to trailhead 7
  8. Parking at Lovell Street mile 1.1 directions to trailhead 8
  9. Parking at Bremen Street mile 1.3 directions to trailhead 9
  10. Parking at Bremen Street mile 1.3 directions to trailhead 10
  11. Parking at Bremen Street mile 1.3 directions to trailhead 11
  12. Parking at Bremen Street mile 1.8 directions to trailhead 12
  13. Parking at Porter Street mile 1.8 directions to trailhead 13
  14. Parking at Bremen Street mile 1.9 directions to trailhead 14
  15. Parking at Orleans Street mile 1.9 directions to trailhead 15
  16. Parking at Gove Street mile 1.9 directions to trailhead 16
  17. Parking at Orleans Street mile 1.9 directions to trailhead 17
  18. Parking at Gove Street mile 1.9 directions to trailhead 18
  19. Parking at Orleans Street mile 1.9 directions to trailhead 19
  20. Parking at Orleans Street mile 1.9 directions to trailhead 20
  21. Parking at Bremen Street mile 2 directions to trailhead 21
  22. Parking at Orleans Street mile 2 directions to trailhead 22
  23. Parking at Gove Street mile 2 directions to trailhead 23
  24. Parking at Bremen Street mile 2.1 directions to trailhead 24
  25. Parking at Bremen Street mile 2.1 directions to trailhead 25
  26. Parking at Orleans Street mile 2.1 directions to trailhead 26
  27. Parking at Sumner Street mile 2.1 directions to trailhead 27
  28. Parking at Orleans Street mile 2.1 directions to trailhead 28
  29. Parking at South Bremen Street mile 2.2 · water directions to trailhead 29
  30. Parking at Webster Street mile 2.2 · water directions to trailhead 30
  31. Parking at South Bremen Street mile 2.2 · water directions to trailhead 31

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

East Boston Greenway.agr.JPG (opens in a new tab)
East Boston Greenway.agr.JPG · Photo: ArnoldReinhold · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Mary Ellen Welch Greenway, known until 2019 as the East Boston Greenway, is a linear park and shared-use path in East Boston, Massachusetts, built along an abandoned railroad right-of-way. It runs from the Jeffries Point waterfront through the neighborhood to Constitution Beach, linking Piers Park, Memorial Stadium, Bremen Street Park and Wood Island Bay Marsh. The full system is planned as a 3.3-mile pathway with more than 12 acres of park land; 2.2 miles are mapped here. In 2019 it was renamed for Mary Ellen Welch, a community activist and founding member of the Friends of the East Boston Greenway, who died that March.

The corridor was a long-unused freight right-of-way from the former Inner Harbor docks to the Bremen Street switching yard, built for industry by the Grand Junction Railroad and Depot Company. After Conrail abandoned it, residents first cleaned up the resulting dumping ground in 1978. Activists proposed a greenway in the 1980s to offset airport development, and a 1994 plan with the Boston Natural Areas Network called for a continuous walking and biking corridor. The Trust for Public Land received 1.2 miles of the corridor from Conrail in 1997; construction began in 1999, and the greenway opened in 2007. Massport then built a section from Frankfort and Lovell streets to an overlook at Wood Island Bay Marsh, and the City of Boston finished the last quarter mile, a 12-foot-wide path on MBTA land beside the Blue Line to Constitution Beach, in 2016.

Part of the route parallels the former Boston, Revere Beach and Lynn Railroad, now the Blue Line, and Bremen Street Park has an entrance to Airport station. A branch leads to Memorial Stadium and the Logan Airport Rental Car Center, which has bicycle parking. The East Boston YMCA occupies the line's former engine house. The Friends of the Mary Ellen Welch Greenway list the greenway as under construction from February to December 2026.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Boston Logan International Airport, 2.3 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F373946566676828073625242
Low °F232531415060666558483829
Precipitation, in3.43.24.23.63.23.93.33.23.643.74.3
Snow, in14.314.491.6000000.20.79
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1893 Boston sheet (1:62,500); the 1956 Boston North sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 10643101, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. East Boston Greenway — Boston Planning Department · organization · checked Oct 13, 2026
    Supports: linear park on an abandoned railroad right-of-way, Piers Park, Memorial Stadium, Bremen Street Park, Wood Island Bay Marsh, 3.3-mile pathway and more than 12 acres, Massport's Wood Island Marsh link, the link beside the Blue Line to Constitution Beach
  3. Mary Ellen Welch Greenway — Wikipedia · organization · checked Oct 13, 2026
    Supports: former name, Grand Junction Railroad and Depot Company, Conrail abandonment, 1978 cleanup, Trust for Public Land receiving 1.2 miles in 1997, construction from 1999, opened 2007, Boston, Revere Beach and Lynn Railroad and Blue Line, Airport station entrance, branch to Memorial Stadium and the Rental Car Center with bicycle parking, YMCA in the former engine house
  4. Friends of the Mary Ellen Welch Greenway · organization · checked Oct 13, 2026
    Supports: route from the Jeffries Point waterfront toward Constitution Beach, construction February–December 2026
  5. Community gathers to officially name Greenway after the late Mary Ellen Welch — East Boston Times-Free Press (October 31, 2019) · press · checked Oct 13, 2026
    Supports: renaming in October 2019, Welch's death in March 2019, community activist, founding member of the Friends of the East Boston Greenway
  6. From Vision to Greenway — East Boston Times-Free Press (May 20, 2026) · press · checked Oct 13, 2026
    Supports: freight right-of-way from the Inner Harbor docks to the Bremen Street switching yard, 1980s proposal to offset airport development, 1994 plan with the Boston Natural Areas Network
  7. City and state officials cut the ribbon on the final stretch of the long-awaited East Boston Greenway — East Boston Times-Free Press (June 3, 2016) · press · checked Oct 13, 2026
    Supports: Massport section from Frankfort and Lovell streets to Wood Island Bay Marsh, city-built last quarter mile, 12-foot path on MBTA land beside the Blue Line to Constitution Beach, 2016 ribbon-cutting

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.