Chesapeake & Ohio Canal Trail (DC)
Canal towpath in District of Columbia · OpenStreetMap relation
Runs through Washington
Conditions now
Loading the weather near Washington…
Forecast by the National Weather Service for Washington · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at 30th Street Northwest mile 0.1 · water directions to trailhead 1
- Canal Square mile 0.2 · restrooms directions to Canal Square
- Parking at 31st Street Northwest mile 0.2 · restrooms directions to trailhead 3
- Shops At Georgetown Park mile 0.3 directions to Shops At Georgetown Park
- Parking at Grace Street Northwest mile 0.3 directions to trailhead 5
- Parking at South Street Northwest mile 0.3 directions to trailhead 6
- Parking at Congress Court Northwest mile 0.3 · restrooms directions to trailhead 7
- Parking at Grace Street Northwest mile 0.3 directions to trailhead 8
- Parking at Caton's Walk mile 0.5 directions to trailhead 9
- Parking at Cady's Alley Northwest mile 0.5 directions to trailhead 10
- Parking at 34th Street Northwest mile 0.6 · water directions to trailhead 11
- Parking at Saint Mary's Place Northwest mile 0.8 directions to trailhead 12
- Parking at 37th Street Northwest mile 0.8 directions to trailhead 13
- Parking at Reservoir Road Northwest mile 2.9 · restrooms · water directions to trailhead 14
- Parking at Dalecarlia Place Northwest mile 4.3 directions to trailhead 15
Plan your visit
- National Park ServiceIn Chesapeake and Ohio Canal National Historical Park · park maps
Links checked Oct 18, 2026. Sources: National Park Service boundaries.
(opens in a new tab) About this trail
This record covers the District of Columbia section of the Chesapeake and Ohio Canal towpath, from the canal's terminus in Georgetown northwest along the Potomac River to the Maryland line. The full towpath runs 184.5 miles from Washington to Cumberland, Maryland, and is part of the Potomac Heritage National Scenic Trail; the canal is preserved as the Chesapeake and Ohio Canal National Historical Park, a unit of the National Park Service. It is a canal towpath, not a railroad grade. The much longer Maryland section is a separate record.
Construction began on July 4, 1828, near the Little Falls Dam site at mile 5.64, with President John Quincy Adams attending. The first section, from Little Falls to Seneca, opened in 1830 and the Georgetown section the following year; in 1833 the Georgetown end was extended 1.5 miles east to Tiber Creek. Navigation ended after a flood in 1924, although the Georgetown level was repaired to supply the town's mills with water, and in 1938 the United States acquired the abandoned canal from its bondholders.
Mile 0.0 is in Georgetown, the Georgetown Visitor Center is at mile 0.4, and the remains of the Georgetown Inclined Plane are at mile 2.26. Fletchers Cove, near mile 3.1, has parking at 4940 Canal Road NW and restrooms; boat and bike rental concessions operate there and at mile 0. The National Park Service describes the towpath as mostly even, hard-packed dirt, sets a 15 mph speed limit, and notes heavier traffic and some street crossings in Georgetown, where the paved Capital Crescent Trail runs alongside. In October 2026 the park listed DC Water repairs to the Potomac Interceptor near Little Falls, at mile 4.7, a work alert on the Capital Crescent Trail near the Potomac Aqueduct, and the Georgetown canal boat closed for the season.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 59% of this route as a trail on former railroad right-of-way.
- Shade
48% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Dalecarlia Rsvr, 3.4 km from the trail's middle, 35 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 43 46 55 68 76 84 88 86 79 68 56 47 Low °F 26 27 34 44 54 63 68 66 59 47 36 30 Precipitation, in 3.3 3.2 4.2 3.5 4.4 4.2 5.1 4.4 4.5 4.4 3.3 3.8 Snow, in 2.9 1.4 0.7 0 0 0 0 0 0 0 0 0.8 - On the National Register
- Washington Aqueduct, Washington · structure, listed 1973 · nomination file for Washington Aqueduct
- Chesapeake and Ohio Canal National Historical Park, Washington · historic district, listed 1966 · nomination file for Chesapeake and Ohio Canal National Historical Park
- Capital Traction Company Union Station, Washington · building, listed 2019
- L'Enfant Plan of the City of Washington, District of Columbia, Washington · structure, listed 1997 · nomination file for L'Enfant Plan of the City of Washington, District of Columbia
- Godey Lime Kilns, Washington · structure, listed 1973 · nomination file for Godey Lime Kilns
- Georgetown Historic District, Washington · historic district, listed 1967 · nomination file for Georgetown Historic District
- Rock Creek and Potomac Parkway Historic District, Washington · historic district, listed 2005 · nomination file for Rock Creek and Potomac Parkway Historic District
- George Washington Memorial Parkway, Washington · historic district, listed 1995 · nomination file for George Washington Memorial Parkway
- Old maps
USGS topographic maps of the trail's middle go back to the 1890 Mt. Vernon sheet (1:125,000); the 1956 Washington West sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesC&O Canal NHP current conditions (NPS)
Look around
Nearby trails
- Chesapeake and Ohio Canal Towpath (Maryland) within 0.2 mi · 178 mi, dirt · Maryland
- Capital Crescent Trail within 0.2 mi · 7.5 mi, paved
- Rock Creek Trail within 0.2 mi · 9.3 mi, paved
- Custis Trail 0.4 mi away · 4.3 mi, paved · Virginia
- Mount Vernon Trail 0.4 mi away · 17.6 mi, paved · Virginia
- MacArthur Boulevard Trail 0.5 mi away · 7.1 mi, paved · Maryland
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9773990, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Wikidata Q110404521, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Chesapeake and Ohio Canal — Potomac Heritage National Scenic Trail (U.S. National Park Service) · government source · checked Oct 14, 2026 Supports: 184.5-mile length, Washington to Cumberland, part of the Potomac Heritage National Scenic Trail, Georgetown Visitor Center at mile 0.4
- C&O Canal Family Biking Trips - A Curated List — Chesapeake & Ohio Canal National Historical Park (U.S. National Park Service) · government source · checked Oct 14, 2026 Supports: mile 0.0 terminus in Georgetown, Georgetown Inclined Plane at 2.26, Little Falls Dam at 5.64 where construction began in 1828, Fletchers Cove parking at 4940 Canal Rd. NW, heavier traffic and street crossings in Georgetown, Capital Crescent Trail alongside
- Bicycling — Chesapeake and Ohio Canal National Historical Park (U.S. National Park Service) · government source · checked Oct 14, 2026 Supports: hard-packed dirt surface, 15 mph speed limit, rental concessions at milepost 0 and 3.2 (Fletchers Cove)
- Current Conditions — Chesapeake and Ohio Canal National Historical Park (U.S. National Park Service) · government source · checked Oct 14, 2026 Supports: October 2026 notices: Potomac Interceptor repairs near Little Falls (MP 4.7), Capital Crescent Trail work alert near the Potomac Aqueduct, Georgetown canal boat closed for the season, Fletchers Cove (MP 3.1) lot and restrooms open
- Chesapeake and Ohio Canal — Wikipedia · organization · checked Oct 14, 2026 Supports: July 4, 1828 groundbreaking with John Quincy Adams, 1830 Little Falls-Seneca opening, Georgetown section the following year, 1833 extension to Tiber Creek, end of navigation after the 1924 flood, Georgetown level repaired for mills, 1938 federal acquisition
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
