States › Indiana

Chesapeake & Ohio Greenway

Greenway in Indiana

Runs through Griffith and Merrillville · Lake County

Conditions now

Loading the weather near Merrillville…

Forecast by the National Weather Service for Merrillville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.5 mi 8.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Taft Street mile 2.6 directions to trailhead 1
  2. Parking at Mississippi Street mile 5.5 directions to trailhead 2
Morgan-Skinner-Boyd Homestead (opens in a new tab)
Morgan-Skinner-Boyd Homestead · Photo: Nyttend · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Chesapeake and Ohio Greenway, also called the C&O Trail, is a paved trail of about 5.5 miles in Lake County, Indiana, running diagonally across Merrillville from Mississippi Street to the Oak Savannah Trail near Griffith. The Town of Merrillville and the Lake County Parks and Recreation Department built its sections. Until 2024 the greenway was an isolated trail in Merrillville between Taft Street and Mississippi Street.

The gap to the west was closed with two projects funded by the third round of Indiana's Next Level Trails program, awarded in April 2022. Merrillville received $1,428,091 for a 1.35-mile section beginning at Innsbrook Country Club, connecting to the existing trail and running north past residential subdivisions; Lake County Parks received $804,160 for a 1.47-mile section that continues west from west of Hendricks Street to the Oak Savannah Trail, which in turn joins the 17.7-mile Erie Lackawanna Trail. By February 2024 riders could travel on connected trails from just north of Southlake Mall to Griffith, Highland and Hammond, though a signalized crossing at Taft Street was still to be installed. Gov. Eric Holcomb opened the 2.82-mile extension on April 30, 2024, marking the 100th mile of trail built under Next Level Trails.

East of Taft Street the trail runs mostly through trees, emerging at John A. Stefek Park in a residential area and continuing to Broadway, a commercial street; a pedestrian bridge crosses Turkey Creek along the way. Parking is available in Stefek Park at 70th Place and Harrison Street and behind the Innsbrook Country Club lot at 6701 Taft Street.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

37% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Lowell, 26.1 km from the trail's middle, 10 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323647607181848277644937
Low °F151827384959626052413021
Precipitation, in2.31.92.33.74.25.14.34.33.33.62.62.2
Snow, in9.79.33.40.3000000.20.95.9
Old maps

USGS topographic maps of the trail's middle go back to the 1953 Crown Point sheet (1:24,000); the 1962 Crown Point sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Gov. Holcomb Cuts Ribbon on 100th Mile of Next Level Trails (April 30, 2024) — Indiana Department of Natural Resources, State of Indiana · government source · checked Oct 15, 2026
    Supports: opening of C&O Trail extension with DNR, Town of Merrillville and Lake County Parks; 100th mile of Next Level Trails; $804,160 for Lake County's 1.47-mile segment; $1,428,091 for Merrillville's 1.35-mile portion; third round, April 2022; 2.82 miles; Merrillville section begins at Innsbrook Country Club, extends north past subdivisions to meet county section west of Hendricks Street; county section continues west to the Oak Savannah Trail, which joins the 17.7-mile Erie Lackawanna Trail
  3. Griffith-Merrillville trail connection nearly complete (February 16, 2024) — Lakeshore Public Media · organization · checked Oct 15, 2026
    Supports: C&O Greenway name; previously isolated trail between Taft and Mississippi in Merrillville; connection to Oak Savannah and Erie Lackawanna trails in Griffith; ride from north of Southlake Mall to Griffith, Highland and Hammond; signalized crosswalk at Taft not yet installed
  4. Chesapeake and Ohio Greenway — TrailLink (Rails to Trails Conservancy) · web · checked Oct 15, 2026
    Supports: also called the C&O Trail; 5.5-mile paved route through Merrillville on a diagonal; wooded; John A. Stefek Park; Broadway; pedestrian bridge over Turkey Creek; parking at Stefek Park (70th Place and Harrison Street) and behind Innsbrook Country Club at 6701 Taft Street

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.