Chessie Circle Trail
Rail-trail in Ohio
Runs through Toledo · Lucas County
Conditions now
Loading the weather near Toledo…
Forecast by the National Weather Service for Toledo · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Jackman Road mile 0 directions to trailhead 1
- Parking at Slater Street mile 0 directions to trailhead 2
- Parking mile 0.4 directions to trailhead 3
- Parking at Pelham Road mile 2.9 directions to trailhead 4
- Parking at Douglas Road mile 2.9 directions to trailhead 5
- Parking at South Detroit Avenue mile 7.9 · restrooms · water directions to trailhead 6
- Parking at River Road mile 8.8 directions to trailhead 7
(opens in a new tab) About this trail
The Chessie Circle Trail is a planned 11-mile north-south trail through western Toledo, Ohio, named for the railroad that once used its corridor. It follows part of the former Toledo Terminal Railroad, a belt line around the city that opened in 1903. The Chessie System took complete control of the Toledo Terminal in 1984, and in 2010 its successor, CSX, petitioned to abandon the rest of the line west of the Maumee River. The trail is a partnership among Metroparks Toledo, the University of Toledo, the City of Toledo, the Wood County Port Authority and the Wood County Park District. This record maps about 4.4 miles of built sections, in several pieces.
The northern end is at Bowman Park on Jackman Road and the southern end at River Road near the Maumee River. On the way the trail crosses over Interstate 475 and serves Ottawa Park, Highland Park and the University of Toledo; when finished it is to connect the university's main campus with its Health Science campus. Several stretches still use streets, and the fully off-road sections are Bowman Park to Monroe Street, Ottawa Park to the university, and Medford Drive to River Road. By early 2017 the city had finished the section from Laskey Road to Monroe Street, and plans called for a bridge over the Maumee River into Perrysburg Township.
Metroparks Toledo owns a 1.4-mile section, begun in fall 2016, from Glanzman Road, across from Beverly Elementary School, over Detroit Avenue to River Road, including a bike and pedestrian bridge over the Anthony Wayne Trail. More than 55,000 people used it in 2018. A trailhead with parking, a restroom, a bike rack and a FixIt repair station opened on Copeland Avenue in November 2019. Other parking is at Bowman Park, Ottawa Park and Highland Park. The surface is asphalt with some compacted stone.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 68% of this route as an abandoned rail line.
- Shade
15% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Toledo Metcalf Field, 15.8 km from the trail's middle, 2 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 34 36 46 60 71 81 85 82 76 64 50 38 Low °F 20 22 29 40 51 61 65 63 55 45 34 26 Precipitation, in 1.8 1.8 2.3 3.3 3.5 3.2 3.2 3.5 3.1 2.4 2.3 2.1 - On the National Register
- Old West End District, Toledo · historic district, listed 1973 · nomination file for Old West End District
- Old maps
USGS topographic maps of the trail's middle go back to the 1900 Toledo sheet (1:62,500); the 1952 Toledo sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 3
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesChessie Circle Trail — Metroparks Toledo
Nearby trails
- Robert Brundage Bike Path within 0.2 mi · 2.7 mi, paved
- Overland Trail 0.7 mi away · 4.0 mi, paved
- University Parks Trail 0.8 mi away · 7.0 mi, surface unknown
- Swan Creek Connector Trail 1.4 mi away · 1.5 mi, paved
- Sylvania Avenue Multi-use Trail 1.7 mi away · 1.6 mi, paved
- Towpath Park Trail 2.3 mi away · 1.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Toledo Terminal Railroad — Wikipedia · organization · checked Oct 14, 2026 Supports: belt line opened 1903, Chessie took complete control in 1984, CSX 2010 petition to abandon the line west of the Maumee River, rail-trail plans for the right-of-way
- Chessie Circle Trail — Metroparks Toledo · web · checked Oct 14, 2026 Supports: named for the railroad that used the corridor, 11 miles planned, main campus to Health Science campus, Metroparks section from Glanzman Road across from Beverly Elementary over Detroit Avenue to River Road, bridge over the Anthony Wayne Trail
- Trailhead Added Along Chessie Circle Trail — Metroparks Toledo (2019-11-19) · web · checked Oct 14, 2026 Supports: Copeland Avenue trailhead with restroom, bike rack and FixIt station; Metroparks owns 1.4 miles of the 11-mile trail; more than 55,000 users in 2018
- Metroparks gets OK to link paths to parks — The Blade (2017-01-26) · web · checked Oct 14, 2026 Supports: partnership of Metroparks, University of Toledo, City of Toledo, Wood County Port Authority and Wood County Park District; Metroparks construction begun fall 2016 on the 1.4-mile Glanzman Road to River Road section; city section Laskey Road to Monroe Street complete; planned Maumee River bridge to Perrysburg Township
- Chessie Circle Trail — TrailLink · web · checked Oct 14, 2026 Supports: corridor of the former Toledo Terminal Railroad; endpoints Bowman Park at Jackman Road and River Road; crossing over I-475; Ottawa Park, Highland Park, University of Toledo; on-road stretches and off-road sections; parking at Bowman, Ottawa and Highland parks; asphalt and compacted stone
- Chessie Circle Trail — OpenStreetMap ways · web · checked Oct 14, 2026 Supports: record extent: built pieces between Jackman Road and River Road
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.


