University Parks Trail
Rail-trail in Ohio · OpenStreetMap relation
Runs through Toledo · Lucas County
Conditions now
Loading the weather near Ottawa Hills…
Forecast by the National Weather Service for Ottawa Hills · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The University/Parks Trail is a rail trail in metropolitan area of Toledo, Ohio, United States. The trail is open to walkers, bikers, joggers and in-line skaters.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at North McCord Road mile 1.6 directions to trailhead 1
- Parking at Goodhue Drive mile 3.2 directions to trailhead 2
- Parking at Hasty Road mile 3.7 directions to trailhead 3
- Parking at Brittany Road mile 4.7 directions to trailhead 4
- Parking at Underhill Road mile 4.7 directions to trailhead 5
- Parking at Brittany Road mile 4.7 directions to trailhead 6
- Parking at Brittany Road mile 4.7 directions to trailhead 7
- Parking at West Bancroft Street mile 4.9 directions to trailhead 8
- Parking at Richards Road mile 5.4 · water directions to trailhead 9
- Parking at Richards Road mile 5.4 · water directions to trailhead 10
- Lot 25 mile 6.5 directions to Lot 25
- Parking at Secor Road mile 6.5 directions to trailhead 12
- Lot 26 mile 6.6 directions to Lot 26
- Lot 27A mile 6.7 directions to Lot 27A
- Lot 27B mile 6.8 directions to Lot 27B
- Lot 27C mile 6.8 directions to Lot 27C
- Lot 27D mile 6.8 directions to Lot 27D
- Lot 28 mile 6.9 directions to Lot 28
- Lot 30 mile 6.9 directions to Lot 30
- Lot 8 mile 7 directions to Lot 8
(opens in a new tab) About this trail
The University/Parks Trail is a rail-trail in Lucas County, Ohio, between the University of Toledo and Sylvania Township. Lucas County owns it, and Metroparks Toledo, the University of Toledo and the City of Toledo maintain it; Metroparks rangers, and in some sections local jurisdictions, patrol it. It runs on the right-of-way of the Toledo, Angola and Western Railroad, laid in 1902. After the railroad abandoned the line, five public agencies (the Lucas County Commissioners and Engineer's Office, the City of Toledo, the Metroparks, the Sylvania Area Joint Recreation District and the University of Toledo) built the trail with a $1.3 million federal grant through the Ohio Department of Transportation, and it officially opened in September 1995.
The trail runs 7 miles from the University of Toledo campus at East Rocket Drive west to Silica Road in Sylvania Township; a 0.6-mile extension from King Road, the original western end, to Silica Road opened in 2019. Along the way it crosses Richards, Bancroft, Holland-Sylvania and McCord roads and passes Secor Road on a grade separation. A connector leads to the Wildwood Preserve Metropark trail system, and designated road routes reach Ottawa Park, Olander Park and Westfield Franklin Park. Parking is at Tam-O-Shanter, the McCord Road lot, Wildwood Preserve, the Ottawa Hills Municipal Building and Ottawa Park, and the trail can also be reached from the university campus.
The path is level and paved, suitable for wheelchairs, and passes savannas, meadows and wetlands. Metroparks issues special permits for commuters who use the trail after regular park hours.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 93% of this route as a trail on former railroad right-of-way.
- Shade
30% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Toledo Express Airport, 14.6 km from the trail's middle, 11 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 35 38 48 62 73 83 86 84 78 65 51 39 Low °F 20 22 30 40 51 60 64 63 55 44 34 26 Precipitation, in 2.4 2.3 2.6 3.5 3.8 3.5 3.3 3.1 2.9 2.6 2.6 2.4 Snow, in 12.3 10.2 5.3 1.3 0 0 0 0 0 0.1 1.7 6.5 - On the National Register
- Old West End District, Toledo · historic district, listed 1973 · nomination file for Old West End District
- Old maps
USGS topographic maps of the trail's middle go back to the 1900 Toledo sheet (1:62,500); the 1951 Sylvania sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
1 Reddit thread about this trail, Mar 2025
- Fun activities in Toledo r/toledo · Mar 2025 · 25 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesUniversity/Parks Trail — Metroparks Toledo
- RedditSearch Reddit: r/Ohio
Nearby trails
- Robert Brundage Bike Path 0.6 mi away · 2.7 mi, paved
- Chessie Circle Trail 0.8 mi away · 4.4 mi, paved
- Sylvania Avenue Multi-use Trail 1.0 mi away · 1.6 mi, paved
- Overland Trail 1.1 mi away · 4.0 mi, paved
- Quarry Ridge Trail 1.1 mi away · 4.0 mi, paved
- Swan Creek Connector Trail 2.3 mi away · 1.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9761535, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “University/Parks Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q7894482, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- University/Parks Trail — Wikipedia · organization · checked Oct 14, 2026 Supports: Lucas County; termini at East Rocket Drive and Silica Road; Toledo, Angola and Western Railroad laid 1902; five public agencies; $1.3 million federal grant through ODOT; opened September 1995; 0.6-mile King Road to Silica Road extension in 2019; road crossings in the route table, Secor Road grade separation
- University/Parks Trail — Metroparks Toledo · web · checked Oct 14, 2026 Supports: 7 miles from the University of Toledo campus to Silica Road in Sylvania Township; savannas, meadows, wetlands; level paved path, wheelchair accessible; Wildwood Preserve connection; road connections to Ottawa Park, Olander Park, Westfield Franklin Park; owned by Lucas County, maintained by Metroparks, University of Toledo and City of Toledo; ranger and local patrol; commuter permits after hours; parking locations
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.