Chippewa Trail
Greenway in Michigan · OpenStreetMap relation
Runs through Midland Township and Midland · Midland County
Conditions now
Loading the weather near Midland…
Forecast by the National Weather Service for Midland · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Homestead Road mile 0 · restrooms directions to trailhead 1
- Parking at Homestead Road mile 0 · restrooms directions to trailhead 2
- Parking at South Grey Road mile 1.2 · restrooms directions to trailhead 3
- Parking at Pine River Road mile 3.1 directions to trailhead 4
- Parking at Towsley Street mile 3.3 directions to trailhead 5
- Parking at Benson Street mile 3.5 directions to trailhead 6
- Parking at Towsley Street mile 3.6 directions to trailhead 7
(opens in a new tab) About this trail
The Chippewa Trail is a paved path in Midland, Michigan, that runs about 3.5 miles from the Tridge in downtown Midland to the Chippewa Nature Center. The Tridge, a three-way wooden footbridge over the confluence of the Chippewa and Tittabawassee rivers in Chippewassee Park, opened on October 4, 1981, and it also marks the start of the Pere Marquette Rail Trail; bicycles, skateboards and in-line skates are allowed on the bridge. St. Charles Park surrounds the Tridge.
The trail ends at the Chippewa Nature Center, a nonprofit preserve of about 1,500 acres at 400 South Badour Road in Homer Township, founded in 1966. Interpretive signs along the path explain natural, cultural and historical features, and benches line the way. Bicycles, skateboards and in-line skates may be ridden on the Chippewa Trail but not on the trails inside the nature center.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Midland, 5.3 km from the trail's middle, 9 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 29 32 43 56 68 78 82 80 73 60 46 34 Low °F 17 18 25 36 48 57 62 60 52 42 32 23 Precipitation, in 2 1.9 2 3.5 3.7 3.7 2.8 3.2 2.8 3.1 2.6 1.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1934 Sanford sheet (1:62,500); the 1954 Midland sheet (1:250,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Grand Curve Cycle Path within 0.2 mi · 4.0 mi, paved
- Pere Marquette Rail-Trail within 0.2 mi · 30.2 mi, paved
- Tittabawasee River Trail 4.1 mi away · 3.1 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 1358008, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Chippewa Nature Center — Wikipedia · organization · checked Oct 14, 2026 Supports: 3.5-mile trail from the Tridge to the nature center, bikes and other wheeled uses allowed on the Chippewa Trail but not within the nature center, interpretive signage and benches, address, Homer Township, about 1,500 acres, founded 1966
- The Tridge (Midland, Michigan) — Wikipedia · organization · checked Oct 14, 2026 Supports: three-way wooden footbridge over the Chippewa-Tittabawassee confluence in Chippewassee Park, opened October 4, 1981, start of the Chippewa trail and the Pere Marquette Rail Trail, bicycles allowed, St. Charles Park surrounds it
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.