Tittabawasee River Trail
Greenway in Michigan
Runs through Ingersoll Township and Tittabawassee Township · Midland and Saginaw counties
Conditions now
Loading the weather near Freeland…
Forecast by the National Weather Service for Freeland · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Tittabawassee River Trail is a riverside trail near Freeland, Michigan, that follows the Tittabawassee River northwest from Freeland toward Midland County. Its 2.5-mile section beginning at Hayes Park in Freeland follows the eastern bank of the river to the Midland County line and opened with a ribbon-cutting on June 28, 2024. The route mapped here is about 3.1 miles.
The trail is part of the Great Lakes Bay Regional Trail, a network of non-motorized paths linking Bay, Midland and Saginaw counties that is planned to total close to 100 miles when complete. At the 2024 opening, Rob Eggers, president of the Great Lakes Bay Regional Trail, called it one of the system's key sections and pointed to its boardwalk and its wildlife, including bald eagles, deer and turkeys.
Freeland is also served by another part of the regional trail, the Tittabawassee Township Path. Its first 2.5 miles, a 10-foot-wide path built by the Michigan Department of Transportation in 2017, run along M-47 to the Freeland SportsZone; a 2.69-mile second phase built in 2020 continues east to Hospital Road, where it is to meet a proposed Kochville Township path.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
17% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Midland, 7 km from the trail's middle, 13 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 29 32 43 56 68 78 82 80 73 60 46 34 Low °F 17 18 25 36 48 57 62 60 52 42 32 23 Precipitation, in 2 1.9 2 3.5 3.7 3.7 2.8 3.2 2.8 3.1 2.6 1.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1954 Midland sheet (1:250,000); the 1962 Midland South sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Grand Curve Cycle Path 3.2 mi away · 4.0 mi, paved
- Chippewa Trail 4.1 mi away · 4.4 mi, surface unknown
- Pere Marquette Rail-Trail 4.5 mi away · 30.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Tittabawassee Township Path — Tittabawassee Township, Michigan · government source · checked Oct 15, 2026 Supports: township path phase 1 (2017, 2.5 miles, 10 feet wide, built by MDOT along M-47 to the Freeland SportsZone) and phase 2 (2020, 2.69 miles east to Hospital Road, proposed Kochville Township path); link to the Great Lakes Bay Regional Trail
- Tittabawassee River Trail open to the public — WNEM (June 28, 2024) · web · checked Oct 15, 2026 Supports: 2.5-mile section from Hayes Park in Freeland along the eastern bank to the Midland County line; ribbon-cutting June 28, 2024; part of the Great Lakes Bay Regional Trail linking Bay, Midland and Saginaw counties; close to 100 miles when complete; Rob Eggers on the boardwalk and wildlife
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.