States › Illinois

ComEd Greenway

Greenway in Illinois · OpenStreetMap relation

Runs through Bolingbrook · Will County

Conditions now

Loading the weather near Bolingbrook…

Forecast by the National Weather Service for Bolingbrook · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.6 mi 4.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking mile 0.2 directions to trailhead 1
ComEd Greenway Trail north of Adams Street.jpeg (opens in a new tab)
ComEd Greenway Trail north of Adams Street.jpeg · Photo: Dough4872 · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The ComEd Greenway is a paved trail in Bolingbrook, Illinois, managed by the Bolingbrook Park District. It takes its name from Commonwealth Edison: the trail runs north and south on the utility's property, along a power-line corridor that crosses Lily Cache Lane.

The park district describes the trail as running from the DuPage River Greenway south to the Remington Lakes Sports Complex on Remington Boulevard. Partway along, it meets the Lily Cache Greenway at Orchard Drive, just south of Lily Cache Lane, and the park district says the two greenways together form a 6-mile biking route.

The park district lists the trail as linear, 2 miles long, 10 feet wide and paved, open to bicycling, hiking, running, cross-country skiing and rollerblading; the mapped route here is about 2.6 miles.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

16% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Romeoville Wfo, 10.1 km from the trail's middle, 10 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323648617282858376644937
Low °F162030405060646355443222
Precipitation, in2.222.74.14.84.74.54.43.33.72.72.1
Snow, in10.68.74.20.9000000.11.27.5
Old maps

USGS topographic maps of the trail's middle go back to the 1892 Joliet sheet (1:62,500); the 1954 Romeoville sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 11623381, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. ComEd Greenway Trail — Bolingbrook Park District · organization · checked Oct 15, 2026
    Supports: location at the power lines on Lily Cache Lane, runs north-south on Commonwealth Edison property from the DuPage River Greenway to Remington Lakes Sports Complex on Remington Boulevard, connection to Lily Cache Greenway at Orchard Drive south of Lily Cache Lane, 6-mile combined route, linear 2 miles, 10 ft wide, paved, permitted uses

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.