States › Illinois

Lily Cache Greenway

Greenway in Illinois · OpenStreetMap relation

Runs through Bolingbrook · Will County

Conditions now

Loading the weather near Bolingbrook…

Forecast by the National Weather Service for Bolingbrook · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
4.8 mi 7.8 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Hassert Boulevard mile 0.8 directions to trailhead 1
  2. Parking at Hassert Boulevard mile 1.7 directions to trailhead 2
Lily Cache Greenway drawn on the 1954 USGS topographic map of Joliet, Illinois
Then: the 1954 USGS Joliet sheet (1:62,500) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Lily Cache Greenway is a paved path along Lily Cache Creek in Bolingbrook, Illinois, managed by the Bolingbrook Park District. It is one of the three major legs of the district's pathway system, with the DuPage River Greenway and the ComEd Greenway, and is part of a regional plan that would eventually link 42 miles of trail along the East Branch of the DuPage River with some 20 miles along Lily Cache Creek. The greenway is built in separate sections rather than as one continuous path.

East of Weber Road, a 1-mile path completed in the fall of 2000 runs from Orchard Lane near Independence School southwest along the creek to Naperville Road, where a turnaround sends users back toward the start. A bridge over the creek gives access to Jane Addams Middle School, and the setting is prairie with wildlife. West of Weber Road, about a mile of path straddles the creek and loops through the Lily Cache Sports Fields on Hassert Boulevard, where there is ample parking, with access from the Lakewood and Maplebrook subdivisions. After a gap of about 2 miles, the greenway resumes at Prairie Trails Park in the Foxridge Farms subdivision and runs about three-quarters of a mile to the Bolingbrook–Plainfield border, where it joins the Plainfield Park District's paths.

Each section is 10 feet wide and paved, and is open to bicycling, hiking, running, cross-country skiing and inline skating. The park district plans to cross Weber Road at the Hassert Boulevard traffic light to join the east and west sections into a single long-distance trail. The district maintains about 18 miles of asphalt trails in Bolingbrook and asks users to report cracks, potholes and heaving to its projects superintendent.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

17% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Romeoville Wfo, 9.1 km from the trail's middle, 3 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F323648617282858376644937
Low °F162030405060646355443222
Precipitation, in2.222.74.14.84.74.54.43.33.72.72.1
Snow, in10.68.74.20.9000000.11.27.5
Old maps

USGS topographic maps of the trail's middle go back to the 1892 Joliet sheet (1:62,500); the 1954 Romeoville sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 11623382, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Lily Cache Greenway Trail — Bolingbrook Park District · organization · checked Oct 15, 2026
    Supports: sections east and west of Weber Road, 1 mile completed fall 2000, Orchard Lane to Naperville Road with turnaround, creek bridge to Jane Addams Middle School, prairie and wildlife, Lily Cache Sports Fields on Hassert Boulevard with parking, subdivision access, two-mile gap, Prairie Trails Park and Foxridge Farms, three-quarter mile to the Plainfield border and Plainfield Park District paths, 10 feet wide and paved, permitted uses, planned Weber Road crossing at Hassert Boulevard
  3. Bike Paths — Bolingbrook Park District · organization · checked Oct 15, 2026
    Supports: three major legs of the pathway system, regional plan of 42 miles along the East Branch DuPage River and some 20 miles along Lily Cache Creek, about 18 miles of asphalt trails, reporting trail damage

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.