Cranston Bike Path
Rail-trail in Rhode Island · OpenStreetMap relation
Runs through Cranston · Providence County
Conditions now
Loading the weather near Cranston…
Forecast by the National Weather Service for Cranston · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Washington Secondary Rail Trail is a rail trail located in Rhode Island. The trail measures 19 miles (31 km) and has sections that are paved and unpaved. It runs along an abandoned rail corridor of the former Hartford, Providence and Fishkill Railroad. The trail serves the communities of Coventry, West Warwick, Warwick, and Cranston. It combines, from west to east, the Trestle Trail, Trestle Trail East, Coventry Greenway, West Warwick Greenway, Warwick Greenway, and Cranston Bike Path.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Oaklawn Avenue mile 1.5 directions to trailhead 1
About this trail
The Cranston Bike Path is the easternmost section of the Washington Secondary Bike Path, the 19-mile paved path that the Rhode Island Department of Transportation (RIDOT) lists from Cranston Street in Cranston to Log Bridge Road in western Coventry, on the abandoned rail corridor once served by the Providence, Hartford and Fishkill Railroad. The mapped section is about 5.4 miles. Its first segment, from West Natick Road to Howard Street (4.8 miles), opened in 2000, followed by Howard Street to Sumner Avenue in 2001 and Sumner Avenue to Depot Avenue in 2003. RIDOT began resurfacing and repairs on the path, starting in Cranston, in April 2024.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 93% of this route as a trail on former railroad right-of-way.
- Shade
48% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Providence T F Green Airport, 6.2 km from the trail's middle, 10 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 38 40 48 59 69 78 84 82 75 64 53 43 Low °F 22 24 30 40 49 59 65 64 56 45 36 28 Precipitation, in 4 3.4 4.9 4.3 3.4 3.8 2.9 3.6 4.2 4.2 4.3 4.7 Snow, in 10.3 10.5 6.4 0.6 0 0 0 0 0 0.2 1 7.6 - On the National Register
- Oak Lawn Village Historic District, Cranston · historic district, listed 1977 · nomination file for Oak Lawn Village Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1887 Providence sheet (1:62,500); the 1957 Providence sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs.
Community
What riders say on Reddit
1 Reddit thread about this trail, Feb 2025
- East vs North VS Cranston r/providence · Feb 2025 · 27 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Washington Secondary Bike Path within 0.2 mi · 2.7 mi, paved
- Warwick Greenway within 0.2 mi · 1.8 mi, paved
- Woonasquatucket River Greenway 1.3 mi away · 2.4 mi, paved
- East Bay Bike Path 2.9 mi away · 14.0 mi, paved
- Blackstone River Greenway 3.1 mi away · 14.2 mi, paved
- Coventry Greenway 3.6 mi away · 3.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 5446563, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Washington Secondary Rail Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q7972180, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Washington Secondary Bike Path — Rhode Island Department of Transportation · government source · checked Oct 13, 2026 Supports: 19 miles from Cranston Street, Cranston, to Log Bridge Road, Coventry; Providence, Hartford and Fishkill Railroad corridor; Cranston Bike Path as a local segment name; Cranston segments opened 2000 (West Natick Road–Howard Street, 4.8 miles), 2001 (Howard Street–Sumner Avenue) and 2003 (Sumner Avenue–Depot Avenue)
- Mayor Hopkins Announces RIDOT Cranston Bike Path Work Schedule — City of Cranston (April 10, 2024) · government source · checked Oct 13, 2026 Supports: RIDOT resurfacing and repairs from April 2024, Cranston sections first
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.
