States › Rhode Island

Cranston Bike Path

Rail-trail in Rhode Island · OpenStreetMap relation

Runs through Cranston · Providence County

Conditions now

Loading the weather near Cranston…

Forecast by the National Weather Service for Cranston · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Washington Secondary Rail Trail is a rail trail located in Rhode Island. The trail measures 19 miles (31 km) and has sections that are paved and unpaved. It runs along an abandoned rail corridor of the former Hartford, Providence and Fishkill Railroad. The trail serves the communities of Coventry, West Warwick, Warwick, and Cranston. It combines, from west to east, the Trestle Trail, Trestle Trail East, Coventry Greenway, West Warwick Greenway, Warwick Greenway, and Cranston Bike Path.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
5.4 mi 8.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Oaklawn Avenue mile 1.5 directions to trailhead 1
Route 33 underpass, Washington Secondary Trail, Cranston, Rhode Island.JPG (opens in a new tab)
Route 33 underpass, Washington Secondary Trail, Cranston, Rhode Island.JPG · Photo: Pi.1415926535 · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Cranston Bike Path is the easternmost section of the Washington Secondary Bike Path, the 19-mile paved path that the Rhode Island Department of Transportation (RIDOT) lists from Cranston Street in Cranston to Log Bridge Road in western Coventry, on the abandoned rail corridor once served by the Providence, Hartford and Fishkill Railroad. The mapped section is about 5.4 miles. Its first segment, from West Natick Road to Howard Street (4.8 miles), opened in 2000, followed by Howard Street to Sumner Avenue in 2001 and Sumner Avenue to Depot Avenue in 2003. RIDOT began resurfacing and repairs on the path, starting in Cranston, in April 2024.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 93% of this route as a trail on former railroad right-of-way.

Shade

48% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Providence T F Green Airport, 6.2 km from the trail's middle, 10 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F384048596978848275645343
Low °F222430404959656456453628
Precipitation, in43.44.94.33.43.82.93.64.24.24.34.7
Snow, in10.310.56.40.6000000.217.6
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1887 Providence sheet (1:62,500); the 1957 Providence sheet (1:24,000) shows the area at mid-century. Browse all 17 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs.

Oak Lawn station postcard (2)
Oak Lawn station postcard (2)Photo: Unknown authorUnknown author · Public domain · Wikimedia Commons (opens in a new tab)

Community

What riders say on Reddit

1 Reddit thread about this trail, Feb 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 5446563, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Washington Secondary Rail Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q7972180, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Washington Secondary Bike Path — Rhode Island Department of Transportation · government source · checked Oct 13, 2026
    Supports: 19 miles from Cranston Street, Cranston, to Log Bridge Road, Coventry; Providence, Hartford and Fishkill Railroad corridor; Cranston Bike Path as a local segment name; Cranston segments opened 2000 (West Natick Road–Howard Street, 4.8 miles), 2001 (Howard Street–Sumner Avenue) and 2003 (Sumner Avenue–Depot Avenue)
  5. Mayor Hopkins Announces RIDOT Cranston Bike Path Work Schedule — City of Cranston (April 10, 2024) · government source · checked Oct 13, 2026
    Supports: RIDOT resurfacing and repairs from April 2024, Cranston sections first

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.