States › Rhode Island

Blackstone River Greenway

Rail-trail in Rhode Island, crossing into Massachusetts · OpenStreetMap relation

Part of the Blackstone River Greenway (MA)

Runs through Uxbridge (MA), Millville (MA), North Smithfield, Woonsocket, Lincoln, Cumberland, Central Falls, Providence and 3 more · Worcester County (MA) and Providence County

All 11 towns and places

Uxbridge (MA), Millville (MA), Blackstone (MA), North Smithfield, Woonsocket, Lincoln, Cumberland, Valley Falls, Central Falls, Pawtucket and Providence

Conditions now

Loading the weather near Cumberland Hill…

Forecast by the National Weather Service for Cumberland Hill · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Blackstone River Greenway is a partially completed 48-mile (77 km) paved rail trail defining the course of the East Coast Greenway through the Blackstone Valley from Worcester, Massachusetts to Providence, Rhode Island in the United States.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
14.2 mi 22.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Gano Street mile 0.2 directions to trailhead 1
  2. Parking at Gano Street mile 0.2 directions to trailhead 2
  3. Parking at Gano Street mile 0.2 directions to trailhead 3
  4. Parking at Gano Street mile 0.2 directions to trailhead 4
  5. Parking at Power Street mile 0.3 directions to trailhead 5
  6. Parking at Pitman Street mile 0.6 directions to trailhead 6
  7. Parking at Waterman Street mile 0.7 directions to trailhead 7
  8. Parking at Waterman Street mile 0.7 directions to trailhead 8
  9. Parking at Waterman Street mile 0.8 directions to trailhead 9
  10. Parking at Lafayette Street mile 3.3 directions to trailhead 10
  11. Parking at Shoreham Court mile 4.2 directions to trailhead 11
  12. Parking at East Avenue mile 5 directions to trailhead 12
  13. Parking at Exchange Street mile 5.2 directions to trailhead 13
  14. Parking at Exchange Street mile 5.3 directions to trailhead 14
  15. Parking at Saint Mary's Way mile 5.4 directions to trailhead 15
  16. Parking at Jackson Street mile 5.5 directions to trailhead 16
  17. Parking at Blackstone Avenue mile 5.5 directions to trailhead 17
  18. Parking at High Street mile 5.6 directions to trailhead 18
  19. Parking at High Street mile 5.9 directions to trailhead 19
  20. Parking at Blackstone Street mile 6.3 directions to trailhead 20
  21. Parking at River Street mile 6.8 directions to trailhead 21
  22. Parking at Division Street mile 6.9 directions to trailhead 22
  23. Parking at Meeting Street mile 7.1 · restrooms directions to trailhead 23
  24. Parking at Broad Street mile 7.1 directions to trailhead 24
  25. Parking at Titus Street mile 7.2 · restrooms directions to trailhead 25
  26. Parking at Lusitania Avenue mile 7.2 · restrooms directions to trailhead 26
  27. Parking at Lusitania Avenue mile 7.2 · restrooms directions to trailhead 27
  28. Parking at Macondray Avenue mile 7.3 · restrooms directions to trailhead 28
  29. Parking at John Street mile 8 directions to trailhead 29
  30. Parking at John Street mile 8 directions to trailhead 30
  31. Parking at John Street mile 8 directions to trailhead 31
  32. Parking at John Street mile 8 directions to trailhead 32
  33. Parking at John Street mile 8 directions to trailhead 33
  34. Parking at Lonsdale Avenue mile 8.1 directions to trailhead 34
  35. Parking at Lonsdale Avenue mile 8.1 directions to trailhead 35
  36. Parking at Cook Street mile 8.2 directions to trailhead 36
  37. Parking at Cook Street mile 8.2 directions to trailhead 37
  38. Parking at Vista Drive mile 8.9 directions to trailhead 38
  39. Parking at School Street mile 12.8 directions to trailhead 39
  40. Parking at School Street mile 12.8 directions to trailhead 40
  41. Parking at School Street mile 12.8 directions to trailhead 41
  42. Parking at School Street mile 12.9 directions to trailhead 42
  43. Parking at School Street mile 12.9 directions to trailhead 43
  44. Parking at Main Street mile 13 directions to trailhead 44
  45. Parking at Main Street mile 13.1 directions to trailhead 45
  46. Parking at Main Street mile 13.1 directions to trailhead 46
  47. Parking mile 16.8 directions to trailhead 47
  48. Parking mile 16.9 directions to trailhead 48
  49. Parking at Davison Avenue mile 17.3 directions to trailhead 49
  50. Parking at Court Street mile 18.1 directions to trailhead 50
  51. Parking at Greene Street mile 18.1 directions to trailhead 51
  52. Parking at Watson Street mile 18.2 directions to trailhead 52
  53. Parking at Bernon Street mile 18.2 directions to trailhead 53
  54. Parking at Greene Street mile 18.2 directions to trailhead 54
  55. Parking at Allen Street mile 18.3 directions to trailhead 55
  56. Parking at Allen Street mile 18.3 directions to trailhead 56
  57. Parking at Bernon Street mile 18.4 directions to trailhead 57
  58. Parking at Bernon Street mile 18.4 directions to trailhead 58
  59. Parking at South Main Street mile 18.5 directions to trailhead 59
  60. Parking at Island Place mile 18.5 directions to trailhead 60
  61. Parking at Island Place mile 18.5 directions to trailhead 61
  62. Parking at Sayles Street mile 18.6 directions to trailhead 62
  63. Parking at Verry Street mile 18.9 directions to trailhead 63
  64. Parking at Hope Street mile 22.6 directions to trailhead 64
  65. Parking at West Street mile 22.9 directions to trailhead 65

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); National Recreation Trails database (NPS and American Trails).

Blackstone River Greenway entering Millville, Millville MA (opens in a new tab)
Blackstone River Greenway entering Millville, Millville MA · Photo: John Phelan · CC BY-SA · Wikimedia Commons

About this trail

The Blackstone River Greenway is a partially completed paved trail planned to run about 48 miles through the Blackstone Valley from Worcester, Massachusetts, to Providence, Rhode Island, as part of the East Coast Greenway. The 24.9 miles mapped here cover its southern part, from Providence through Pawtucket, Cumberland, Lincoln and Woonsocket into Blackstone and Millville, Massachusetts. In Rhode Island it is the Blackstone River Bikeway, which the Rhode Island Department of Transportation (RIDOT) gives as 18.2 miles, including 11.6 miles of path between Cumberland and Woonsocket; the Department of Environmental Management maintains it. It follows the river and the Blackstone Canal towpaths where it can, largely beside the active Providence and Worcester Railroad.

The Rhode Island bikeway was built in phases beginning in 1998 with 3.3 miles from Front Street to the Ashton Viaduct in Lincoln. It reached Woonsocket in 2007 and 2008, on-road links from Pitman Square in Providence to Pawtucket followed in 2011, and a 0.6-mile segment from Cold Spring Park in Woonsocket to the Massachusetts line opened in 2018. In Massachusetts, the Department of Conservation and Recreation built a 3.7-mile segment in Blackstone, Millville and Uxbridge, and in November 2024 completed a $14 million half-mile extension from the Saint Paul Street Bridge in Blackstone to the state line, rehabilitating a railroad viaduct on a stretch shared with the Southern New England Trunkline Trail.

From India Point Park in Providence, where it meets the East Bay Bike Path, an off-road segment runs under the Washington Bridge to Pitman Square, followed by marked on-road routes through Providence, Pawtucket, Central Falls and Cumberland. The continuous path begins near Valley Falls Park in Cumberland with a 540-foot boardwalk through the Lonsdale marsh, crosses Pratt Dam, follows the canal past the Kelly House and Ashton Viaduct, passes the Albion and Manville dams and ends at River's Edge Park in Woonsocket. A visitor center with parking is off I-295 North in Cumberland.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

44% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Woonsocket, 7.5 km from the trail's middle, 11 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F384047607078848275645343
Low °F192128384857636254423325
Precipitation, in4.43.74.94.73.64.33.644.25.14.25.3
Snow, in12.310.77.61.9000000.117.9
On the National Register

And 23 more within 100 m of the trail.

Old maps

USGS topographic maps of the trail's middle go back to the 1887 Providence sheet (1:62,500); the 1949 Pawtucket sheet (1:24,000) shows the area at mid-century. Browse all 19 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs, oldest first.

Pawtucket, 1853: Head-on wreck on the Providence & Worcester Railroad
Pawtucket, 1853: Head-on wreck on the Providence & Worcester RailroadPhoto: L. Wright · Public domain · Wikimedia Commons (opens in a new tab)

Community

What riders say on Reddit

  • Riders and walkers in 2024 said signs along the path ask walkers to keep left and bikes right, but that compliance varied, with more walkers on the wrong side near Mendon Road and at Millville Lock. r/RhodeIsland, May 2024 · r/RhodeIsland, Aug 2024
  • In 2024 and 2025, commenters described the link between the Massachusetts end and River's Edge Park in Woonsocket as on-road streets such as River Street, Hamlet Avenue and Truman Drive, with patchy signs and one rider calling River Street risky. r/RhodeIsland, Nov 2024 · r/RhodeIsland, Aug 2025
  • Two commenters in 2024 and 2025 said the paved Massachusetts piece runs only a few miles from Blackstone Village, with the Trunkline Trail farther west partly gravel and, per one, muddy; they suggested sturdier tires there. r/RhodeIsland, Oct 2024 · r/bikeboston, Aug 2025
  • One rider in 2025 said the Rhode Island sections have almost no water along the way, while another in 2024 preferred fall, when the leaves turn and bugs ease. r/RhodeIsland, Aug 2024 · r/bikeboston, Aug 2025
21 Reddit threads about this trail, Mar 2023 to Nov 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Look around

360° panorama: Blackstone River Greenway (opens in a new tab)
  1. 360° view 1 of 4, photo by themapcenter
  2. 360° view 2 of 4, photo by postylem
  3. 360° view 3 of 4, photo by themapcenter
  4. 360° view 4 of 4, photo by themapcenter
360° panorama · Photo: themapcenter · CC BY-SA 4.0 · Mapillary · open on Mapillary (opens in a new tab)

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 5446328, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Blackstone River Greenway”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q4923424, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Blackstone River Bikeway — Rhode Island Department of Transportation · government source · checked Oct 13, 2026
    Supports: 18.2 miles including 11.6 miles of path between Cumberland and Woonsocket, construction history (1998 Front Street–Ashton Viaduct 3.3 mi, 2007–2008 Woonsocket segments, 2011 Pitman Square–Pawtucket, 2018 Cold Spring Park–Massachusetts line 0.6 mi), Blackstone Canal towpaths, India Point Park connection to the East Bay Bike Path, Washington Bridge and Pitman Square, on-road routes through Providence, Pawtucket, Central Falls and Cumberland, Valley Falls Park, 540-foot Lonsdale marsh boardwalk, Pratt Dam, Kelly House and Ashton Viaduct, Albion and Manville dams, River's Edge Park, DEM maintenance
  5. DCR Celebrates Completion of Blackstone Section of the Southern New England Trunkline Trail — Mass.gov (November 22, 2024) · government source · checked Oct 13, 2026
    Supports: DCR's 3.7-mile segment in Blackstone, Millville and Uxbridge, $14 million half-mile extension from the Saint Paul Street Bridge to the Rhode Island border, rehabilitated railroad viaduct, overlap with the SNETT
  6. Blackstone Bikeway And Visitor's Center — Rhode Island State Parks · government source · checked Oct 13, 2026
    Supports: visitor center with parking off I-295 North, Cumberland
  7. Blackstone River Greenway — Wikipedia · organization · checked Oct 13, 2026
    Supports: partially completed 48-mile trail from Worcester to Providence, East Coast Greenway, route largely along the active Providence and Worcester Railroad

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.