CTfastrak Multi-Use Trail
Greenway in Connecticut · OpenStreetMap relation
Runs through Newington, New Britain and Town of New Britain
Conditions now
Loading the weather near Newington…
Forecast by the National Weather Service for Newington · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Willard Avenue mile 0 directions to trailhead 1
- Parking at Chapman Street mile 0 directions to trailhead 2
- Parking at Willard Avenue mile 0 directions to trailhead 3
- Parking at West Hill Road mile 0 directions to trailhead 4
- Parking at Willard Avenue mile 0 directions to trailhead 5
- Parking at Chapman Street mile 0.1 directions to trailhead 6
- Parking at Summit Street mile 0.2 directions to trailhead 7
- Parking at Summit Street mile 0.2 directions to trailhead 8
- Parking mile 1.5 directions to trailhead 9
- Parking at Myra Cohen Way mile 1.7 directions to trailhead 10
- Parking at East Street mile 2.3 directions to trailhead 11
- Parking at East Street mile 2.3 directions to trailhead 12
- Parking at East Street mile 2.3 directions to trailhead 13
- Parking at Coccomo Street mile 2.3 directions to trailhead 14
- Parking at East Street mile 2.4 directions to trailhead 15
- Parking at East Street mile 2.4 directions to trailhead 16
- Parking at Recano Road mile 2.4 directions to trailhead 17
- Parking at East Street mile 2.4 directions to trailhead 18
- Parking at East Street mile 2.4 directions to trailhead 19
- Parking at Saint Clair Avenue mile 2.5 directions to trailhead 20
- Parking at Saint Clair Avenue mile 2.5 directions to trailhead 21
- Parking at Allen Street mile 2.6 directions to trailhead 22
- Parking at Saint Clair Avenue mile 2.6 directions to trailhead 23
- Parking at Saint Clair Avenue mile 2.6 directions to trailhead 24
- Parking at Saint Clair Avenue mile 2.6 directions to trailhead 25
- Parking at East Street mile 2.7 directions to trailhead 26
- Parking at Dix Avenue mile 2.9 directions to trailhead 27
- Parking at Smalley Street mile 3.5 directions to trailhead 28
- Parking at Harvard Street mile 3.6 directions to trailhead 29
- Parking at Harvard Street mile 3.6 directions to trailhead 30
- Parking at East Main Street mile 3.6 directions to trailhead 31
- Parking at Harvard Street mile 3.6 directions to trailhead 32
- Parking at Florence Street mile 3.6 directions to trailhead 33
- Parking at East Main Street mile 3.6 directions to trailhead 34
- Parking at East Main Street mile 3.6 directions to trailhead 35
- Parking at Wilson Street mile 3.6 directions to trailhead 36
- Parking at Yale Street mile 3.7 directions to trailhead 37
- Parking at M & S Court mile 3.7 directions to trailhead 38
- Parking at M & S Court mile 3.7 directions to trailhead 39
- Parking at East Main Street mile 3.7 directions to trailhead 40
- Parking at Fairview Street mile 3.8 directions to trailhead 41
- Parking at Dwight Street mile 4 directions to trailhead 42
- Parking at Stanley Street mile 4 directions to trailhead 43
- Parking at Stanley Street mile 4 directions to trailhead 44
- Parking at Columbus Boulevard mile 4.2 directions to trailhead 45
- Parking at Columbus Boulevard mile 4.2 directions to trailhead 46
- Parking at Columbus Boulevard mile 4.3 directions to trailhead 47
- Parking at Herald Square mile 4.3 directions to trailhead 48
- Parking at Columbus Boulevard mile 4.4 directions to trailhead 49
- Parking at Herald Square mile 4.4 directions to trailhead 50
About this trail
The CTfastrak Multi-Use Trail is a fenced, paved path for walking and cycling of about 4.5 miles in Hartford County, Connecticut, built alongside the CTfastrak bus rapid transit guideway between the Downtown New Britain and Newington Junction stations. CTfastrak, Connecticut's first bus rapid transit system, runs on a 9.4-mile busway; construction began on May 22, 2012, and the system opened on March 28, 2015. Between Newington Junction and downtown New Britain the busway follows the former Newington Secondary rail line, and the trail shares that corridor. No trail was built north of Newington Junction toward Hartford, where the available room was needed for an Amtrak maintenance access road.
TrailLink lists the trail at 4.4 miles, from Columbus Boulevard in New Britain to West Hill Road in Newington. Between its endpoints the busway has stations at East Main Street, East Street and Cedar Street. Designated trail parking is near the midpoint, at the corner of East and Allen streets in New Britain, with limited parking at some stations. Because an underpass is too narrow for both the busway and the path, users follow the sidewalk along East Street from East Street station, passing under Route 9 and crossing several streets, before the trail returns to the busway and passes St. Mary's Cemetery. All CTtransit and CTfastrak buses carry bicycles.
The path is 10 feet wide, surfaced in asphalt and concrete, and separated from the busway by a fence. It is open from dawn to dusk, and motor vehicles are not allowed. The last mile into downtown New Britain has several at-grade crossings that the buses also use. Plans exist to extend the path from Newington Junction to Hartford along other routes; no current project status was found.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
21% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Hartford Brainard Field, 10.3 km from the trail's middle, 22 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 37 40 48 60 71 80 85 83 76 64 52 42 Low °F 20 22 30 40 50 60 66 64 56 44 35 26 Precipitation, in 2.9 2.6 3.5 3.8 3.4 3.9 3.9 3.5 4 4.2 3.4 3.8 - On the National Register
- Newington Junction West Historic District, Newington · building, listed 1987 · nomination file for Newington Junction West Historic District
- Newington Junction Railroad Depot, Newington · building, listed 1986 · nomination file for Newington Junction Railroad Depot
- Downtown New Britain, New Britain · historic district, listed 2016
- City Hall-Monument District, New Britain · historic district, listed 1973 · nomination file for City Hall-Monument District
- Old maps
USGS topographic maps of the trail's middle go back to the 1892 Meriden sheet (1:62,500); the 1953 New Britain sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Trout Brook Trail 1.3 mi away · 3.6 mi, paved
- Farmington Canal Heritage Trail 3.9 mi away · 49.6 mi, paved
- Charter Oak Greenway 4.3 mi away · 15.4 mi, paved
- Riverside Park Trail 4.8 mi away · 1.4 mi, paved
- Putnam Bridge Trail Connection 4.9 mi away · 1.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 15096236, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Gap Closure Trail Study: Connection to CTfastrak, Public Review Draft — Capitol Region Council of Governments (2019) · government source · checked Oct 13, 2026 Supports: existing 5-mile CTfastrak multi-use trail beside the bus rapid transit line between the Newington Junction and New Britain CTfastrak stations, all CTfastrak and CTtransit buses equipped with bicycle racks
- CTfastrak Celebrates 4 Million Riders Since Opening — Capitol Region Council of Governments · government source · checked Oct 13, 2026 Supports: CTfastrak completed and service began in March 2015, Connecticut's only bus rapid transit system
- CTfastrak — Wikipedia · organization · checked Oct 13, 2026 Supports: first bus rapid transit system in Connecticut, 9.4-mile busway, groundbreaking May 22, 2012, opening March 28, 2015, busway follows the former Newington Secondary from New Britain to Newington Junction, fenced multi-use trail alongside the busway from New Britain to Newington Junction, no trail north of Newington Junction because of the Amtrak maintenance access road, Cedar Street, East Street and East Main Street stations
- CTfastrak Multi-Use Trail — CTMQ (Dec. 6, 2023) · web · checked Oct 13, 2026 Supports: sidewalk along East Street from East Street station under Route 9 with street crossings, St. Mary's Cemetery, at-grade crossings shared with buses in the last mile
- CTfastrak Multi-Use Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 13, 2026 Supports: 4.4 miles, Columbus Blvd. New Britain to West Hill Rd. Newington, asphalt and concrete, 10 feet wide, fence separation, underpass too narrow so a portion follows East Street, parking at East and Allen streets and limited parking at some stations, open dawn to dusk, no motorized vehicles, plans to extend to Hartford along alternate routes
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.