Home › States › Connecticut

Connecticut rail-trails

40 mapped trails · 40 with an article · 40 with photos · 269 mapped miles (433 km)

The longest: Air Line Trail (55.4 mi), Farmington Canal Heritage Trail (49.6 mi) and Hop River Trail (24.2 mi). 29 are paved, 6 crushed stone or gravel.

Paved Crushed stone Gravel Dirt Closed or partial Signed cycle route Mountain-bike trail zoom in for surfaces
40 of 40 trails
Rail-trails and greenways in Connecticut, with surface, mapped length, and whether an article or photos exist
TrailSurfaceMapped mikm
Air Line Trail · Partly closed Through Colchester, Hebron, Windham, Thompson and 10 more Article Photos (2) Dirt 55.489.2 km 89.2
Farmington Canal Heritage Trail (Canal towpath) Through Suffield, Farmington, Southington, Town of New Haven and 12 more Article Photos (10) Paved 49.6 (17.8 on railbed)79.8 km 79.8
Hop River Trail Through Manchester, Bolton, Columbia, Windham and 5 more Article Photos (10) Gravel 24.238.9 km 38.9
Charter Oak Greenway (Greenway) Through Hartford, Town of Hartford, East Hartford, Manchester and 1 more Article Photos (6) Paved 15.424.7 km 24.7
Farmington River Trail Through West Simsbury, Simsbury, Canton, Farmington and 5 more Article Photos (14) Paved 12.620.2 km 20.2
Naugatuck River Greenway (Greenway) Through Town of Torrington, Waterbury, Town of Naugatuck, Ansonia and 11 more Article Photos (5) Paved 8.313.4 km 13.4
Pequonnock River Trail (Greenway) Through Monroe, Daniels Farm, Trumbull, Bridgeport and 3 more Article Photos (2) Paved 8.113.0 km 13.0
Larkin State Park Trail Through Southbury, Oxford, Middlebury, Town of Naugatuck and 1 more Article Photos (7) Dirt 7.912.7 km 12.7
Moosup Valley State Park Trail Through Moosup, Plainfield and Sterling Article Photos (6) Dirt 5.89.4 km 9.4
Quinebaug River Trail (Greenway) Through Putnam, Killingly, Danielson, Brooklyn and 1 more Article Photos (5) Paved 5.08.0 km 8.0
Captain John Bissell Trail (Greenway) Through Windsor, South Windsor, East Hartford and Manchester Article Photos (4) Paved 4.97.8 km 7.8
Windsor Locks Canal State Park Trail (Canal towpath) Through Suffield and Windsor Locks Article Photos (8) Paved 4.87.7 km 7.7
CTfastrak Multi-Use Trail (Greenway) Through Newington, New Britain and Town of New Britain Article Photos (2) Paved 4.57.2 km 7.2
Middlebury Greenway Through Middlebury Article Photos (5) Paved 4.37.0 km 7.0
Litchfield Community Greenway Through Bantam, Town of Litchfield and Borough of Litchfield Article Photos (2) Crushed stone 3.96.3 km 6.3
Day Hill Multi-Use Trail (Greenway) Through Windsor Article Photos (6) Paved 3.75.9 km 5.9
Norwalk River Valley Trail (Greenway) Through Wilton Center, Wilton, South Wilton, Town of Norwalk and 1 more Article Photos (2) Paved 3.75.9 km 5.9
Trout Brook Trail (Greenway) Through West Hartford Article Photos (5) Paved 3.65.8 km 5.8
Sue Grossman Still River Greenway (Greenway) Through Winchester, Town of Torrington and Torrington Article Photos (5) Paved 3.45.4 km 5.4
Air Line Trail (Colchester Spur) (Greenway) Through Hebron and Colchester Article Photos (1) Crushed stone 3.35.3 km 5.3
Mattabesset Trolley Trail (Trolley trail) Through Town of Middletown and Middletown Article Photos (4) Paved 2.74.3 km 4.3
Quinnipiac River Gorge Trail Through Meriden and Town of Meriden Article Photos (7) Paved 2.54.0 km 4.0
Bloomfield Greenway Multi-Use Trail Through Bloomfield Article Photos (4) Paved 2.3 (1.5 on railbed)3.6 km 3.6
Westlake Area Bikeway (Greenway) Through Town of Middletown and Middletown Article Photos (1) Paved 2.23.6 km 3.6
Quinnipiac Linear Trail (Greenway) Through Wallingford Article Photos (3) Paved 2.13.5 km 3.5
Post Office Road Multi-Use Path (Greenway) Through Southwood Acres and Enfield Article Photos (1) Paved 2.13.3 km 3.3
Cheney Rail Trail Through Manchester Article Photos (5) Gravel 2.03.3 km 3.3
Gold Star Bridge Trail (Greenway) Through Town of New London, New London, Groton and Town of Groton Article Photos (1) Paved 1.93.0 km 3.0
Stepney Rail Trail Through Stepney and Monroe Article Photos (2) Crushed stone 1.93.0 km 3.0
Newtown Rail Trail Through Town of Newtown, Monroe and Stepney Article Photos (3) Dirt 1.83.0 km 3.0
Putnam River Trail (Greenway) Through Putnam Article Photos (2) Paved 1.82.9 km 2.9
Rail Trail (Lakeville to Salisbury) Through Salisbury and Lakeville Article Photos (4) Dirt 1.82.9 km 2.9
Still River Greenway (Greenway) Through Brookfield Article Photos (3) Paved 1.62.6 km 2.6
Hillstown Path (Greenway) Through Manchester Article Photos (1) Paved 1.62.5 km 2.5
Lebanon Green Trail (Greenway) Through Lebanon Article Photos (2) Gravel 1.62.5 km 2.5
Beach Street Trail (Greenway) Through Town of West Haven and West Haven Article Photos (2) Paved 1.52.5 km 2.5
Shoreline Greenway Trail (Greenway) Through East Haven and Branford Article Photos (1) Paved 1.52.4 km 2.4
Riverside Park Trail (Greenway) Through Hartford and Town of Hartford Article Photos (2) Paved 1.42.3 km 2.3
Putnam Bridge Trail Connection (Greenway) Through Wethersfield, Glastonbury and Glastonbury Center Article Photos (2) Paved 1.42.2 km 2.2
Riverfront Trails (Greenway) Through Glastonbury and Glastonbury Center Article Photos (1) Paved 1.32.0 km 2.0

Trails that reach the Connecticut line

In a neighboring state, ending at or beside the state line.

Historic Railways

The rail lines and canals under Connecticut's trails in their working days, from copies of old photographs, oldest first.

Mount Carmel, 1890–1909: Farmington Canal and towpath with the Mount Carmel ridge behind
Mount Carmel, 1890–1909: Farmington Canal and towpath with the Mount Carmel ridge behind · on the Farmington Canal Heritage TrailPhoto: Unknown author · Public domain · Wikimedia Commons (opens in a new tab)

Lengths are what is mapped today. A trail that crosses into another state is listed under the state with most of its miles, with its whole mapped length; the other states point to it, and records may overlap where one corridor is mapped under several names. A missing closure does not mean a trail was checked and found open.