Des Moines Creek Trail
Greenway in Washington · OpenStreetMap relation
Runs through SeaTac and Des Moines · King County
Conditions now
Loading the weather near Des Moines…
Forecast by the National Weather Service for Des Moines · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at South 219th Street mile 2 · restrooms · water directions to trailhead 1
- Parking at 6th Avenue South mile 2 · restrooms · water directions to trailhead 2
(opens in a new tab) About this trail
The Des Moines Creek Trail is a paved regional trail of 2.25 miles in King County, Washington, linking SeaTac and Des Moines with Puget Sound. King County lists it as paved with a gentle grade, following Des Moines Creek to the Sound through an urban area, with access at Des Moines Creek Trail Park and Des Moines Beach Park. OpenStreetMap maps the trail at about 2.2 miles.
The trail forms the south end of the Lake to Sound Trail, a 16-mile route from Lake Washington at Renton to the Des Moines waterfront. About 11 miles were complete as of 2025. Segment C, 2.2 miles along Des Moines Memorial Drive, connects the south end of Segment B to the Des Moines Creek Trailhead at South 200th Street. Its SeaTac phase (1.8 miles, finished in September 2023) connects the trail to 8th Avenue South, and its Burien phase (0.4 miles) was completed in June 2025, giving more than seven miles of continuous non-motorized trail.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
64% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Kent, 5.5 km from the trail's middle, 27 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 48 51 56 61 68 72 78 78 72 61 53 47 Low °F 36 36 39 43 49 53 57 57 52 46 39 35 Precipitation, in 5.8 4 4.4 3.1 2.1 1.7 0.7 0.9 1.5 4.1 6.2 5.8 - Old maps
USGS topographic maps of the trail's middle go back to the 1897 Tacoma sheet (1:125,000); the 1949 Des Moines sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesLake to Sound Trail — King County Parks
Nearby trails
- Lake to Sound Trail within 0.2 mi · 5.4 mi, paved
- Frager Road Trail 1.7 mi away · 1.8 mi, paved
- Green River Trail 1.8 mi away · 19.1 mi, paved
- Westside Trail 2.9 mi away · 1.9 mi, paved
- King County Interurban Trail 3.0 mi away · 15.8 mi, paved
- Springbrook Trail 3.5 mi away · 3.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 3736775, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- King County Regional Trails map (2017 back panel) — King County · government source · checked Oct 17, 2026 Supports: paved, gentle grade, 2.25 miles, links SeaTac and Des Moines with Puget Sound, follows Des Moines Creek, access points
- Lake to Sound Trail — King County · government source · checked Oct 17, 2026 Supports: Segment C location, SeaTac and Burien phases and dates, link to Des Moines Creek Trail at S. 200th St
- King County Parks opens new trail segment connecting Burien and SeaTac — King County · government source · checked Oct 17, 2026 Supports: 16-mile Lake to Sound Trail Renton to Des Moines, about 11 miles complete, over seven miles continuous, June 2025
- OpenStreetMap relation 3736775 · web · checked Oct 17, 2026 Supports: about 2.2 miles mapped length
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.