States › Washington

Lake to Sound Trail

Greenway in Washington · OpenStreetMap relation

Runs through Burien, SeaTac, Tukwila and Renton · King County

Conditions now

Loading the weather near SeaTac…

Forecast by the National Weather Service for SeaTac · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
5.4 mi 8.7 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Starfire Way mile 1 directions to trailhead 1
  2. Parking at International Boulevard mile 2.9 directions to trailhead 2
  3. Tukwila International Boulevard Station Parking mile 3 directions to Tukwila International Boulevard Station Parking
  4. Parking at International Boulevard mile 3 directions to trailhead 4
  5. Parking at South 160th Street mile 5.1 directions to trailhead 5
  6. Parking at Des Moines Memorial Drive South mile 6.2 directions to trailhead 6
  7. Parking at Des Moines Memorial Drive South mile 6.3 directions to trailhead 7
  8. Parking at 8th Avenue South mile 6.7 directions to trailhead 8
  9. Parking at South 200th Street mile 8.4 · restrooms directions to trailhead 9

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Lake to Sound Trail, Black River Riparian Forest 01 (opens in a new tab)
Lake to Sound Trail, Black River Riparian Forest 01 · Photo: Joe Mabel · CC BY-SA · Wikimedia Commons

About this trail

The Lake to Sound Trail is a planned 16-mile, non-motorized regional trail in south King County, Washington. When complete it will run from the south end of Lake Washington in Renton to the Puget Sound shoreline at Des Moines, connecting Renton, Tukwila, SeaTac, Burien and Des Moines. King County Parks builds it in partnership with the five cities, a collaboration that dates to 2008; in late 2008 and early 2009 city, county, Cascade Bicycle Club, WSDOT and Port of Seattle representatives reviewed and approved the alignment. The trail is not a rail conversion.

The county builds it in segments as funding allows. Segment C, 2.2 miles linking Burien and SeaTac to the existing Des Moines Creek Trail, opened on June 17, 2025, and with it partners reported 11 of the 16 miles complete. The trail connects with Eastrail, the Cedar River Trail, the Interurban Trail and the Green River Trail, and passes two Sound Transit Link light rail stations.

The design is a 12-foot-wide asphalt path with two-foot soft-surface shoulders. Elevated concrete boardwalks protect wetlands, and parts of the old SR 509 roadway were reused. The BikeTheRail record covers only part of the route, about 5.4 miles; unbuilt sections remain, so riders should check King County Parks for the current status.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

28% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Seattle Tacoma International Airport, 2.5 km from the trail's middle, 8 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F485054596671777872605247
Low °F383840434953575754474137
Precipitation, in5.83.84.23.21.91.40.611.63.96.35.7
Snow, in1.82.20.400000000.21.7
Old maps

USGS topographic maps of the trail's middle go back to the 1897 Tacoma sheet (1:125,000); the 1949 Des Moines sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 10786665, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Official trail website · Official site · checked Oct 31, 2026
  3. Lake to Sound Trail - King County Parks · government source · checked Oct 17, 2026
    Supports: 16-mile planned route, five cities, 2008 partnership, 2008-2009 alignment review, 12-foot asphalt design, segmented construction
  4. Lake to Sound Trail Segment C opens - King County news release, June 2025 · government source · checked Oct 17, 2026
    Supports: Segment C June 17, 2025, 2.2 miles, 11 of 16 miles complete, connections, boardwalks, old SR 509 roadway reuse

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.