Druid Trail
Greenway in Florida
Runs through Clearwater · Pinellas County
Conditions now
Loading the weather near Clearwater…
Forecast by the National Weather Service for Clearwater · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Druid Road mile 1.1 directions to trailhead 1
- Parking at Druid Road mile 1.1 directions to trailhead 2
- Parking at Druid Road mile 1.2 directions to trailhead 3
- Parking at Druid Road mile 1.2 directions to trailhead 4
- Parking at Druid Road mile 1.4 directions to trailhead 5
- Parking at Druid Road mile 1.5 directions to trailhead 6
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Druid Trail, also called the Druid Road Trail, is a paved path of about 3.5 miles along Druid Road in Clearwater, Pinellas County, Florida, linking the Pinellas Trail on the west with the Duke Energy Trail on the east. The City of Clearwater built it in phases. The first two, in place by 2012, ran from Clearwater Beach to East Avenue downtown. Phase III, on which work was to start at the end of 2012, added 8-foot asphalt trail along Turner Street, Dr. Martin Luther King Jr. Avenue and the north side of Druid Road as far as Betty Lane. Phase IV, from Glen Oaks Park to the Duke Energy Trail, was finished in 2019, and a ribbon cutting was set for May 3 that year near Druid Road and Bypass Drive. The city and county said it completed a continuous trail network from Clearwater Beach to Tampa.
From the Pinellas Trail at Turner Street and East Avenue, where a link to the Memorial Causeway and Clearwater Beach also begins, the trail runs east on Turner Street, south on Martin Luther King Jr. Avenue and then east on the north side of Druid Road. It crosses Stevenson Creek beside Glen Oaks Park, continues past South Keene Road and South Belcher Road, moves to the south side of the road just past University Drive, and ends at the Duke Energy Trail just west of Bypass Drive.
The path is 8 feet wide and asphalt, running beside the road with many street and driveway crossings. Parking is available on Turner Street by the Pinellas Trail, and parking, water and restrooms are at Glen Oaks Park, 1345 Court Street, near the west end and at the McMullen Tennis Complex, 1000 Edenville Avenue, near the east end.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
St Petersburg International Airport, 8.9 km from the trail's middle, 14 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 71 73 77 82 87 90 90 91 89 84 77 73 Low °F 52 55 59 64 70 75 76 76 75 70 61 56 Precipitation, in 2.6 2.4 2.4 2.6 2.7 8.9 9.7 8.8 6.4 2.5 1.6 2.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1921 Sand Key sheet (1:62,500); the 1943 Clearwater sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Memorial Causeway Trail within 0.2 mi · 2.9 mi, paved
- Ream Wilson Clearwater Trail within 0.2 mi · 3.3 mi, paved
- Duke Energy Trail within 0.2 mi · 9.6 mi, paved
- Pinellas Trail 0.3 mi away · 53.7 mi, paved
- Courtney Campbell Causeway Trail 1.6 mi away · 9.5 mi, paved
- Edgewater Trail 2.2 mi away · 1.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Druid Trail Connection to Pinellas Trail Coming — Clearwater Patch (December 27, 2012) · press · checked Oct 16, 2026 Supports: first two parts in place, running from Clearwater Beach to East Avenue; third phase from Turner Street and East Avenue to Glen Oaks Park; 1,620 feet of 8-foot asphalt on Turner Street, 830 feet on MLK Jr. Avenue, 4,320 feet on the north side of Druid Road from the Pinellas Trail to Betty Lane; improvements at Druid Road and Missouri Avenue; work expected to start soon
- Clearwater Celebrates Completion Of Druid Trail — Clearwater Patch (April 30, 2019) · press · checked Oct 16, 2026 Supports: Druid Trail Phase IV from Glen Oaks Park to the Duke Energy Trail; ribbon cutting May 3 near Druid Road and Bypass Drive; continuous network from Clearwater Beach to Tampa; funding partners
- You can now bike from Clearwater to Tampa on the completed Druid Road Trail — FOX 13 Tampa Bay (April 26, 2019) · press · checked Oct 16, 2026 Supports: phase four of the Druid Road Trail complete in April 2019; Druid Road Trail name; Glen Oaks Park to the Duke Energy Trail
- Druid Road Trail, Clearwater — 100 Florida Trails · web · checked Oct 16, 2026 Supports: 8-foot asphalt roadside trail; convergence with the Pinellas Trail and Memorial Causeway link at Turner St. and East Ave.; route via Turner St., MLK Jr. Blvd. and Druid Rd.; Stevenson Creek bridge at Glen Oaks Park; crossings at S. Keene and S. Belcher; switch to the south side past University Dr.; many road and driveway crossings; parking at Turner St.; part of the Clearwater Beach-to-Tampa route via Duke Energy, Ream Wilson, Bayshore and Courtney Campbell trails
- Druid Road Trail | Florida Trails | TrailLink · web · checked Oct 16, 2026 Supports: east end on Druid Rd. just west of Bypass Dr.; water, restrooms and parking at Glen Oaks Park (1345 Court St.) and McMullen Tennis Complex (1000 Edenville Ave.)
- OpenStreetMap ways named Druid Trail — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: the name; mapped length of about 3.5 miles along Druid Road; paved cycleway
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.