States › Florida

Duke Energy Trail

Greenway in Florida · OpenStreetMap relation

Runs through Palm Harbor and Clearwater · Pinellas County

Conditions now

Loading the weather near Clearwater…

Forecast by the National Weather Service for Clearwater · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
9.6 mi 15.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Belleair Road mile 0 directions to trailhead 1
  2. Parking at Bypass Drive mile 1.4 directions to trailhead 2
  3. Parking at Gulf to Bay Boulevard mile 1.5 directions to trailhead 3
  4. Parking at Bypass Drive mile 1.5 directions to trailhead 4
  5. Parking at Gulf to Bay Boulevard mile 1.6 directions to trailhead 5
  6. Parking at South Old Coachman Road mile 1.7 directions to trailhead 6
  7. Parking at South Old Coachman Road mile 1.9 directions to trailhead 7
  8. Parking at Drew Street mile 2 directions to trailhead 8
  9. Parking at South Old Coachman Road mile 2 directions to trailhead 9
  10. Parking at South Old Coachman Road mile 2 directions to trailhead 10
  11. Parking at Drew Street mile 2 directions to trailhead 11
  12. Parking at North Old Coachman Road mile 2.3 directions to trailhead 12
  13. Parking at North Old Coachman Road mile 2.3 directions to trailhead 13
  14. Parking at North Old Coachman Road mile 2.3 directions to trailhead 14
  15. Parking at North Old Coachman Road mile 2.3 directions to trailhead 15
  16. Parking at North Old Coachman Road mile 2.3 directions to trailhead 16
  17. Parking at North Old Coachman Road mile 2.4 directions to trailhead 17
  18. Parking at North Old Coachman Road mile 2.5 directions to trailhead 18
  19. Parking at Sunset Point Road mile 3.8 directions to trailhead 19
  20. Parking at Sunset Point Road mile 3.8 directions to trailhead 20
  21. Parking at Sunset Point Road mile 3.9 directions to trailhead 21
  22. Parking at East Skyline Drive mile 3.9 directions to trailhead 22
  23. Parking at East Skyline Drive mile 3.9 directions to trailhead 23
  24. Parking at Sunset Point Road mile 3.9 directions to trailhead 24
  25. Parking at Sunset Point Road mile 3.9 directions to trailhead 25
  26. Parking at Winding Wood Drive mile 5.7 directions to trailhead 26
  27. Parking at Winding Wood Drive mile 5.8 directions to trailhead 27
  28. Parking at Winding Wood Drive mile 5.8 directions to trailhead 28
  29. Parking at Countryside Boulevard mile 5.9 directions to trailhead 29
  30. Parking at Countryside Boulevard mile 5.9 directions to trailhead 30
  31. Parking at Countryside Boulevard mile 5.9 directions to trailhead 31
  32. Parking at State Road 580 mile 6 directions to trailhead 32
  33. Parking at Sabal Springs Drive mile 6.3 · restrooms · water directions to trailhead 33
  34. Parking mile 6.3 · restrooms · water directions to trailhead 34
Duke Energy Trail's elevated concrete ramp by a power-line tower, Clearwater (opens in a new tab)
Duke Energy Trail's elevated concrete ramp by a power-line tower, Clearwater · Photo: Pinellas County Public Works · Public domain (Florida public record) · storymaps.arcgis.com

About this trail

The Duke Energy Trail, which Pinellas County calls the Pinellas Duke Energy Trail, is a paved multi-use trail running north and south through Clearwater and its Countryside area to Palm Harbor in Pinellas County, Florida. Most of it uses Duke Energy rights-of-way along power lines. It is one of the connecting trails of the planned 75-mile Pinellas Trail Loop around the county, together with the Fred Marquis Pinellas Trail and the North Bay Trail in St. Petersburg; as of April 2023, 63 miles of the loop were complete.

The county opened the 6.7-mile north segment, from Enterprise Road through Countryside to John Chesnut Sr. Park in Palm Harbor, on August 5, 2022, closing the loop's North Gap; at the park the trail meets the Pinellas Trail. A pedestrian bridge over the Lake Tarpon Outfall Canal, left unbuilt at the opening while a temporary sidewalk route carried trail users, was constructed from March 2024 to July 2025 with Penny for Pinellas money and a federal Treasury award. Farther south the trail crosses Druid Road, where it meets the Druid Road Trail, and shares a stretch near Old Coachman Road and Northeast Coachman Park with the Ream Wilson Clearwater Trail. The record's map line runs about 9.6 miles from Belleair Road in Clearwater north toward Palm Harbor; a further section south to Haines Bayshore Road and a mostly unbuilt South Gap to the North Bay Trail are described by 100 Florida Trails.

The asphalt is about 15 feet wide, narrower in places, with almost no shade. The trail bridges US 19, crosses Brooker Creek and Alligator Creek, and uses signals at State Road 580, Enterprise Road, Curlew Road, Drew Street and Gulf-to-Bay Boulevard; it crosses a railroad at Old Coachman Road. Parking is at Enterprise Road, Sunset Point Road, Countryside Community Park, Northeast Coachman Park and the Carpenter Complex near BayCare Ballpark.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
St Petersburg International Airport, 11.4 km from the trail's middle, 23 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F717377828790909189847773
Low °F525559647075767675706156
Precipitation, in2.62.42.42.62.78.99.78.86.42.51.62.9
Old maps

USGS topographic maps of the trail's middle go back to the 1943 Oldsmar sheet (1:24,000); the 1944 Oldsmar sheet (1:31,680) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

1 Reddit thread about this trail, Jan 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 2119345, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Celebration marks opening of Pinellas Duke Energy Trail — Pinellas County (Aug. 5, 2022) · government source · checked Oct 16, 2026
    Supports: name Pinellas Duke Energy Trail; 6.7 miles from Enterprise Road through Countryside to John Chesnut Sr. Park, Palm Harbor; opened Aug. 5, 2022; completes the North Gap of the 75-mile Pinellas Trail Loop; Lake Tarpon Outfall Canal bridge still to be built; temporary sidewalk route
  3. Pinellas Trail North Gap – Lake Tarpon Outfall Canal Bridge — Pinellas County · government source · checked Oct 16, 2026
    Supports: bridge construction completed; March 2024 to July 2025; Penny for Pinellas and U.S. Treasury federal award
  4. Pinellas Trail — Wikipedia · organization · checked Oct 16, 2026
    Supports: Pinellas Trail Loop of 75 miles; 63 of 75 miles complete as of April 2023; connecting trails include the Duke Energy Trail and the North Bay Trail
  5. Ream Wilson Clearwater Trail — Wikipedia · organization · checked Oct 16, 2026
    Supports: Ream Wilson Clearwater Trail connects with the Duke Energy Trail along Duke Energy's right of way
  6. Duke Energy Trail — 100 Florida Trails (updated December 2025) · web · checked Oct 16, 2026
    Supports: Duke Energy rights-of-way along power lines; virtually no shade; asphalt about 15 feet wide with narrower sections; Druid Road Trail; shared stretch with Ream Wilson Trail near Old Coachman Rd. and Northeast Coachman Park; middle section to Haines Bayshore Rd. and South Gap; US 19 bridge, Brooker and Alligator creeks, signals at SR 580, Enterprise Rd., Curlew Rd., Drew St. and Gulf-to-Bay Blvd.; railroad crossing at Old Coachman Rd.; parking locations
  7. OpenStreetMap relation 2119345 · web · checked Oct 16, 2026
    Supports: mapped line of about 9.6 miles from Belleair Road north toward Palm Harbor

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.