Dunn Creek Greenway
Greenway in North Carolina
Runs through Wake Forest · Wake County
Conditions now
Loading the weather near Wake Forest…
Forecast by the National Weather Service for Wake Forest · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Soccer Fields Parking mile 0 directions to Soccer Fields Parking
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Dunn Creek Greenway is a paved and boardwalk greenway in Wake Forest, North Carolina, run by the town's Parks, Recreation and Cultural Resources Department. It begins at the Smith Creek Soccer Center, 690 Heritage Lake Road, where there is parking, and is open from dawn to dusk. Voters approved $500,000 in bonds for trail construction in 2005, and the first segment, 1 mile from the soccer center north to a pedestrian culvert under the NC 98 Bypass (Dr. Calvin Jones Highway), was completed in 2012.
Phase 2, the Downtown Connector, added 0.3 miles on the northern end in September 2017, linking the greenway with Deacons Ridge, Cardinal Park and downtown. In 2022 voters approved $14.35 million for greenway work on the Dunn Creek and Smith Creek networks. With that bond money, Phase 3 added 1.8 miles from the end of the greenway north of the NC 98 Bypass to Ailey Young Park and the greenway network built in the Traditions neighborhood, crossing Wait Avenue and several streams on precast concrete boardwalks known as Permatrak. Phase 4 added 0.62 miles connecting Flaherty Park, Orchards at Traditions, Flaherty Farms and the Del Webb community. Construction of Phase 3 began in December 2024, and the town held ribbon-cuttings for Phases 3 and 4 on May 8, 2026.
Our map record covers about 4.1 miles in OpenStreetMap: a main piece of about 3.6 miles north from the soccer center parking, mapped as asphalt with several bridges, and a separate piece of about 0.4 miles that does not join it on the map.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
58% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to June, August and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Falls Lake, 14.3 km from the trail's middle, 2 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 49 53 62 71 77 84 87 84 79 68 59 52 Low °F 28 30 36 45 55 64 68 67 61 48 37 32 Precipitation, in 3.5 2.9 4.2 3.7 3.5 4.1 4.8 4.7 5.3 3.3 3.6 3.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1953 Raleigh sheet (1:250,000); the 1967 Rolesville sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesTown of Wake Forest — Dunn Creek Greenway
Nearby trails
- Smith Creek Greenway within 0.2 mi · 2.3 mi, paved
- Sanford Creek Greenway 1.2 mi away · 2.2 mi, paved
- Neuse River Trail 3.4 mi away · 32.4 mi, paved
- Abbotts Creek Trail 4.2 mi away · 2.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Dunn Creek Greenway — Town of Wake Forest, NC · government source · checked Oct 16, 2026 Supports: start at Smith Creek Soccer Center, 690 Heritage Lake Road, parking, paved and boardwalk, dawn to dusk, 2005 bond of $500,000, 1-mile segment to the NC-98 Bypass culvert completed 2012, Phase II 0.3 miles to Deacons Ridge, Cardinal Park and downtown completed September 2017, 2022 bond of $14.35 million for Dunn Creek and Smith Creek, Phase 3 route, Wait Avenue crossing, streams, Permatrak precast boardwalks, notice to proceed December 2, 2024, Phase 4 0.62 miles and connections
- Dunn Creek Greenway Phases 3 & 4 and Miller Park now open — Town of Wake Forest (May 11, 2026) · government source · checked Oct 16, 2026 Supports: ribbon-cuttings May 8, 2026 by the Parks, Recreation & Cultural Resources Department, Phase 3 funded by the 2022 bond adds 1.8 miles to Ailey Young Park and the Traditions network, Phase 4 adds 0.62 miles linking Flaherty Park, Orchards at Traditions, Flaherty Farms and Del Webb
- Dunn Creek Greenway — OpenStreetMap way 608735533 (one of the record's ways) · web · checked Oct 16, 2026 Supports: mapped length, two unjoined pieces, asphalt, bridges, soccer fields parking
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.