States › North Carolina

Neuse River Trail

Greenway in North Carolina · OpenStreetMap relation

Runs through Raleigh and Clayton · Wake and Johnston counties

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Neuse River Trail is a 34.5-mile (55.5 km) long paved greenway located in the Raleigh area of North Carolina, running along the banks of the Neuse River from Falls Lake Dam to the town of Clayton. The route passes through the jurisdictions of Raleigh, Wake Forest, Knightdale, and Clayton in Wake and Johnston counties. The Neuse River Greenway trail is part of the Capital Area Greenway system as well as the Mountains-to-Sea Trail that crosses North Carolina from the Great Smoky Mountains to the Outer Banks. Open to both cyclists and pedestrians, the Neuse River Trail is the longest greenway trail in North Carolina and the longest paved trail between northern Virginia and western Georgia.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Length
32.4 mi 52.2 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking mile 14.1 directions to trailhead 1
  2. Parking at 22 Anderson Point Drive Parking Lot mile 14.5 directions to trailhead 2
  3. Parking at 22 Anderson Point Drive Parking Lot mile 14.5 directions to trailhead 3
  4. Parking at Camargo Lane mile 17.2 directions to trailhead 4
  5. Parking at Blackwolf Run Lane mile 17.4 directions to trailhead 5
  6. Parking at Blackwolf Run Lane mile 17.4 directions to trailhead 6
  7. Parking at Blackwolf Run Lane mile 17.4 directions to trailhead 7
  8. Parking at Osprey Cove Drive mile 17.6 directions to trailhead 8
  9. Parking at Osprey Cove Drive mile 17.6 directions to trailhead 9
  10. Parking at Osprey Cove Drive mile 17.8 directions to trailhead 10
  11. Parking at Wallace Martin Way mile 21.6 · restrooms directions to trailhead 11
  12. Parking mile 22.3 directions to trailhead 12
  13. Parking at Trailhead Lane mile 24.5 directions to trailhead 13
  14. Parking at Thornton Road mile 27.4 directions to trailhead 14
  15. Parking at Bedfordtown Drive mile 29.2 directions to trailhead 15
  16. Neuse River Greenway Parking mile 31.4 directions to Neuse River Greenway Parking
Neuse River Greenway - panoramio (3).jpg (opens in a new tab)
Neuse River Greenway - panoramio (3).jpg · Photo: James Willamor · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Neuse River Trail is a paved greenway along the Neuse River in Wake and Johnston counties, North Carolina, running about 34.5 miles from Falls Lake Dam in north Raleigh southeast to the town of Clayton. It passes through Raleigh, Wake Forest, Knightdale and Clayton, is part of Raleigh's Capital Area Greenway system, and carries both the Mountains-to-Sea Trail and the East Coast Greenway. It is open to cyclists and pedestrians.

Raleigh's 1976 Capital Area Greenway plan made the Neuse River corridor a spine of the system, and the 1996 Neuse River Regional Park Master Plan called for a single 10-foot asphalt trail along its whole length; at the time only a 3.5-mile stretch existed near the Hedingham neighborhood. A 2003 parks bond, federal enhancement funds and federal recovery funds paid for construction. The first 6.5 miles, from Falls Lake Dam to the WRAL Soccer Center, opened in November 2011, a 20-mile stretch from Horseshoe Farm Park to the Johnston County line opened in April 2013, and a final 1-mile connector at the Horseshoe Farm river bend was finished in 2014.

The trail is divided into seven sections, marked by parks and access points such as Horseshoe Farm Park, Buffaloe Road Athletic Park, Milburnie Dam, Anderson Point Park and Auburn Knightdale Road. Two 275-foot suspension bridges with 45-foot steel towers cross the river at Skycrest Road and Louisburg Road, and a steel truss bridge crosses at Milburnie Dam. South of the county line the route continues as the Clayton River Walk on the Neuse, a 4-mile, 10-foot-wide paved trail that passes under Covered Bridge Road and joins Sam's Branch Greenway toward downtown Clayton. About 1,000 feet of Sam's Branch Greenway near the bridge to the River Walk closed on October 5, 2026, for sewer construction, with reopening expected by February 1, 2027. This record maps about 32 miles, from Falls Lake Dam into Johnston County.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

58% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: February to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Raleigh State Univ, 14.5 km from the trail's middle, 65 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F525563728087918982726255
Low °F323340495866706963514135
Precipitation, in3.62.94.23.644.94.74.75.73.93.53.7
Snow, in2.50.80.100000000.11
Old maps

USGS topographic maps of the trail's middle go back to the 1943 Raleigh sheet (1:62,500); the 1968 Raleigh East sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

37 Reddit threads about this trail, Jan 2024 to Oct 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 3147227, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Neuse River Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q16982513, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Neuse River Trail — Wikipedia · organization · checked Oct 16, 2026
    Supports: 34.5-mile paved greenway from Falls Lake Dam to Clayton; Raleigh, Wake Forest, Knightdale and Clayton in Wake and Johnston counties; Capital Area Greenway, Mountains-to-Sea Trail and East Coast Greenway; open to cyclists and pedestrians; 1976 plan and 1996 master plan with a 10-foot asphalt trail; 3.5 miles near Hedingham in 1996; 2003 bond, federal enhancement and recovery funds; openings in November 2011, April 2013 and 2014; seven sections; suspension bridges at Skycrest and Louisburg roads, 275 feet with 45-foot towers; truss bridge at Milburnie Dam
  5. Clayton River Walk on the Neuse — Johnston County Visitors Bureau · organization · checked Oct 16, 2026
    Supports: 4-mile, 10-foot-wide paved trail from the Wake-Johnston county line under Covered Bridge Road; part of the Mountains-to-Sea Trail and East Coast Greenway; connects to Sam's Branch Greenway into downtown Clayton; closure of about 1,000 feet of Sam's Branch Greenway from Monday, October 5, for sewer construction, completion expected by February 1, 2027
  6. Neuse River Trail (relation 3147227) — OpenStreetMap · web · checked Oct 16, 2026
    Supports: extent of this record's map line, about 32 miles from Falls Lake Dam into Johnston County

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.