Neuse River Trail
Greenway in North Carolina · OpenStreetMap relation
Runs through Raleigh and Clayton · Wake and Johnston counties
Conditions now
Loading the weather…
Forecast by the National Weather Service · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Neuse River Trail is a 34.5-mile (55.5 km) long paved greenway located in the Raleigh area of North Carolina, running along the banks of the Neuse River from Falls Lake Dam to the town of Clayton. The route passes through the jurisdictions of Raleigh, Wake Forest, Knightdale, and Clayton in Wake and Johnston counties. The Neuse River Greenway trail is part of the Capital Area Greenway system as well as the Mountains-to-Sea Trail that crosses North Carolina from the Great Smoky Mountains to the Outer Banks. Open to both cyclists and pedestrians, the Neuse River Trail is the longest greenway trail in North Carolina and the longest paved trail between northern Virginia and western Georgia.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking mile 14.1 directions to trailhead 1
- Parking at 22 Anderson Point Drive Parking Lot mile 14.5 directions to trailhead 2
- Parking at 22 Anderson Point Drive Parking Lot mile 14.5 directions to trailhead 3
- Parking at Camargo Lane mile 17.2 directions to trailhead 4
- Parking at Blackwolf Run Lane mile 17.4 directions to trailhead 5
- Parking at Blackwolf Run Lane mile 17.4 directions to trailhead 6
- Parking at Blackwolf Run Lane mile 17.4 directions to trailhead 7
- Parking at Osprey Cove Drive mile 17.6 directions to trailhead 8
- Parking at Osprey Cove Drive mile 17.6 directions to trailhead 9
- Parking at Osprey Cove Drive mile 17.8 directions to trailhead 10
- Parking at Wallace Martin Way mile 21.6 · restrooms directions to trailhead 11
- Parking mile 22.3 directions to trailhead 12
- Parking at Trailhead Lane mile 24.5 directions to trailhead 13
- Parking at Thornton Road mile 27.4 directions to trailhead 14
- Parking at Bedfordtown Drive mile 29.2 directions to trailhead 15
- Neuse River Greenway Parking mile 31.4 directions to Neuse River Greenway Parking
(opens in a new tab) About this trail
The Neuse River Trail is a paved greenway along the Neuse River in Wake and Johnston counties, North Carolina, running about 34.5 miles from Falls Lake Dam in north Raleigh southeast to the town of Clayton. It passes through Raleigh, Wake Forest, Knightdale and Clayton, is part of Raleigh's Capital Area Greenway system, and carries both the Mountains-to-Sea Trail and the East Coast Greenway. It is open to cyclists and pedestrians.
Raleigh's 1976 Capital Area Greenway plan made the Neuse River corridor a spine of the system, and the 1996 Neuse River Regional Park Master Plan called for a single 10-foot asphalt trail along its whole length; at the time only a 3.5-mile stretch existed near the Hedingham neighborhood. A 2003 parks bond, federal enhancement funds and federal recovery funds paid for construction. The first 6.5 miles, from Falls Lake Dam to the WRAL Soccer Center, opened in November 2011, a 20-mile stretch from Horseshoe Farm Park to the Johnston County line opened in April 2013, and a final 1-mile connector at the Horseshoe Farm river bend was finished in 2014.
The trail is divided into seven sections, marked by parks and access points such as Horseshoe Farm Park, Buffaloe Road Athletic Park, Milburnie Dam, Anderson Point Park and Auburn Knightdale Road. Two 275-foot suspension bridges with 45-foot steel towers cross the river at Skycrest Road and Louisburg Road, and a steel truss bridge crosses at Milburnie Dam. South of the county line the route continues as the Clayton River Walk on the Neuse, a 4-mile, 10-foot-wide paved trail that passes under Covered Bridge Road and joins Sam's Branch Greenway toward downtown Clayton. About 1,000 feet of Sam's Branch Greenway near the bridge to the River Walk closed on October 5, 2026, for sewer construction, with reopening expected by February 1, 2027. This record maps about 32 miles, from Falls Lake Dam into Johnston County.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
58% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Raleigh State Univ, 14.5 km from the trail's middle, 65 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 52 55 63 72 80 87 91 89 82 72 62 55 Low °F 32 33 40 49 58 66 70 69 63 51 41 35 Precipitation, in 3.6 2.9 4.2 3.6 4 4.9 4.7 4.7 5.7 3.9 3.5 3.7 Snow, in 2.5 0.8 0.1 0 0 0 0 0 0 0 0.1 1 - Old maps
USGS topographic maps of the trail's middle go back to the 1943 Raleigh sheet (1:62,500); the 1968 Raleigh East sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Riders in 2024 and 2025 described a closure near US 401 that people got around on weekends or when no crew was working, with a second closure farther south said to be impassable. r/raleigh, Aug 2024 · r/raleigh, Oct 2024 · r/raleigh, Jul 2025 · r/raleigh, Aug 2025
- Riders posted in late 2025 and early 2026 about two closures: Auburn Knightdale Road to Battle Bridge Road for 540 work, and River Bend Park to Skycrest Bridge for sewer replacement. r/raleigh, Oct 2025 · r/raleigh, Feb 2026 · r/raleigh, May 2026
- Riders in 2024 and 2025 said stretches below Falls Lake dam can go under water during large releases, and one added that conditions may stay muddy for a day or two afterward. r/raleigh, Oct 2024 · r/raleigh, Aug 2025
- Riders in 2024 and 2025 suggested starting at Anderson Point Park and riding south to Clayton as the longest open stretch, with some hills in the first miles and mostly flat terrain after. r/raleigh, Oct 2024 · r/raleigh, May 2025 · r/raleigh, Jul 2025
37 Reddit threads about this trail, Jan 2024 to Oct 2026
- Neuse River Trail closure? r/raleigh · Aug 2025 · 16 comments
- Neuse River Trail r/raleigh · Oct 2024 · 10 comments
- Walnut Creek vs Crabtree Creek trail? r/raleigh · Jul 2025 · 26 comments
- Bicycle Trails in Raleigh r/raleigh · May 2025 · 13 comments
- Another Neuse River Trail Closure r/raleigh · Oct 2025 · 2 comments
- New Neuse River Trail Closure near Buffalo Park r/raleigh · Feb 2026 · 0 comments
- Best greenway stretch for newbies? r/raleigh · May 2026 · 21 comments
- How long do we think the Neuse River Greenway Trail will be closed during phase II of complete 540? r/raleigh · Aug 2024 · 10 comments
- Greenway section that's open for biking? r/raleigh · Jan 2024 · 23 comments
- Neuse River Trail safe? r/raleigh · Aug 2024 · 31 comments
- What’s the etiquette in Raleigh on putting bagged dog poop in someone else’s trashcan? r/raleigh · Oct 2026 · 718 comments
- Neuse River Greenway Trash that is pure treasure r/raleigh · Apr 2026 · 17 comments
- coffee shops near walking trails r/raleigh · Mar 2026 · 36 comments
- Kayaking spots in the Raleigh area or with in an hour or so r/raleigh · Mar 2026 · 28 comments
- Greenway ice status? r/raleigh · Feb 2026 · 15 comments
- What was this place? r/raleigh · Dec 2025 · 18 comments
- Young ppl who moved to Raleigh how’s it been? How do u like the city? r/raleigh · Nov 2025 · 26 comments
- There are concerns about Raleigh’s new greenway, but it will be worth it r/raleigh · Oct 2025 · 46 comments
- Dog’s bucket list swim r/raleigh · Aug 2025 · 16 comments
- Dorthea Dix Sunflowers r/raleigh · Aug 2025 · 26 comments
- What’s the secret to Neuse tubing? r/raleigh · May 2025 · 38 comments
- Paved trail with elevation changes that isn’t Art Museum r/raleigh · Apr 2025 · 33 comments
- Long run routes with elevation change r/raleigh · Apr 2025 · 23 comments
- Identifying a landmark r/raleigh · Mar 2025 · 13 comments
- Neuse River Trail - Mingo Creek Trail - is it open? r/raleigh · Feb 2025 · 5 comments
- Neuse River Trail: the cure for cabin fever r/raleigh · Feb 2025 · 3 comments
- New greenway tool r/raleigh · Jan 2025 · 7 comments
- Bike ride/rental r/raleigh · Jan 2025 · 4 comments
- Neuse trail by WRAL Soccer Park r/raleigh · Aug 2024 · 35 comments
- Favorite trail around Raleigh r/raleigh · Jul 2024 · 34 comments
- PEV User coming to Raleigh r/raleigh · Jun 2024 · 17 comments
- Snakes on Neuse River Trail... help ease an anxious jogger's mind!? r/raleigh · May 2024 · 29 comments
- Mial plantation entrance to neuse river trail r/raleigh · Apr 2024 · 4 comments
- Neuse River Greenway Safety r/raleigh · Apr 2024 · 10 comments
- US Cities with good paved cycling/multi-use paths r/cycling · Feb 2024 · 82 comments
- Cyclist hit on 401 in NE Raleigh last week - anybody have info about the car/driver? r/raleigh · Feb 2024 · 47 comments
- Raleigh's park score is 53. 48% of Raleigh residents live within a 10-minute walk of a park.40% for Charlotte. r/raleigh · Jan 2024 · 59 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Walnut Creek Trail within 0.2 mi · 13.8 mi, paved
- Sam's Branch Greenway Trail within 0.2 mi · 2.5 mi, paved
- Crabtree Creek Trail within 0.2 mi · 17.7 mi, paved
- Abbotts Creek Trail within 0.2 mi · 2.3 mi, paved
- Mingo Creek Trail within 0.2 mi · 4.6 mi, paved
- Smith Creek Greenway within 0.2 mi · 2.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 3147227, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Neuse River Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q16982513, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Neuse River Trail — Wikipedia · organization · checked Oct 16, 2026 Supports: 34.5-mile paved greenway from Falls Lake Dam to Clayton; Raleigh, Wake Forest, Knightdale and Clayton in Wake and Johnston counties; Capital Area Greenway, Mountains-to-Sea Trail and East Coast Greenway; open to cyclists and pedestrians; 1976 plan and 1996 master plan with a 10-foot asphalt trail; 3.5 miles near Hedingham in 1996; 2003 bond, federal enhancement and recovery funds; openings in November 2011, April 2013 and 2014; seven sections; suspension bridges at Skycrest and Louisburg roads, 275 feet with 45-foot towers; truss bridge at Milburnie Dam
- Clayton River Walk on the Neuse — Johnston County Visitors Bureau · organization · checked Oct 16, 2026 Supports: 4-mile, 10-foot-wide paved trail from the Wake-Johnston county line under Covered Bridge Road; part of the Mountains-to-Sea Trail and East Coast Greenway; connects to Sam's Branch Greenway into downtown Clayton; closure of about 1,000 feet of Sam's Branch Greenway from Monday, October 5, for sewer construction, completion expected by February 1, 2027
- Neuse River Trail (relation 3147227) — OpenStreetMap · web · checked Oct 16, 2026 Supports: extent of this record's map line, about 32 miles from Falls Lake Dam into Johnston County
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.