Fee Fee Greenway
Greenway in Missouri · OpenStreetMap relation
Runs through Maryland Heights · St. Louis County
Conditions now
Loading the weather near Maryland Heights…
Forecast by the National Weather Service for Maryland Heights · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Marine Avenue mile 0 directions to trailhead 1
- Parking at McKelvey Woods Court mile 2.6 · restrooms · water directions to trailhead 2
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Fee Fee Greenway is a paved trail of about 2.7 miles in Maryland Heights, in St. Louis County, Missouri, running from the Maryland Heights Community Center, Aquaport and Dogport through McKelvey Woods to Creve Coeur Lake Memorial Park. It is one of the greenways of Great Rivers Greenway in the St. Louis region, and it follows Fee Fee Creek within the Missouri River watershed. Great Rivers Greenway's plan treats it as a link between the Centennial Greenway and the Missouri Greenway. It is not a rail-trail.
The first phase, then called the McKelvey Woods Trail, was one mile of off-street trail from Aquaport to McKelvey Woods Park; Great Rivers Greenway and the City of Maryland Heights scheduled its opening ribbon cutting for April 5, 2014. A second phase was planned to carry it about two more miles to Creve Coeur Park near Marine Avenue, which is where the greenway now ends.
The route is shaded and runs near Fee Fee Creek. Management is split: the Maryland Heights Parks Department runs the section from Aquaport to Rule Avenue, and St. Louis County Parks runs the section from Rule Avenue to the Marine Avenue parking lot; each sets its own rules and hours. Great Rivers Greenway lists drinking water, parking, restrooms, shelters, tables and a playground, and the greenway is near the I-270 and Dorsett Road interchange. In Creve Coeur Lake Memorial Park it connects to the Creve Coeur Connector, which leads on to the Katy Trail. A notice posted in February 2026 said wayfinding signs were being replaced along the greenway and the park's connecting trails while the path stayed open.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
29% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
St Charles 7 SSW, 7.2 km from the trail's middle, 14 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 40 46 56 67 77 85 89 88 81 70 56 45 Low °F 22 25 35 46 56 65 69 67 58 46 36 27 Precipitation, in 2.6 2.2 3.6 4.6 5.2 4.3 3.9 3.5 3.3 3.2 3.5 2.5 Snow, in 4.2 1.1 0.3 0 0 0 0 0 0 0 0.4 2.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1933 Creve Coeur sheet (1:24,000); the 1954 Creve Coeur sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationFee Fee Greenway notices — Great Rivers Greenway
Nearby trails
- Lakeview Loop Trail within 0.2 mi · 2.1 mi, paved
- Lakeview Loop Trail / Meadows Loop Trail 0.5 mi away · 1.3 mi, paved
- Creve Coeur Connector 1.4 mi away · 2.6 mi, paved
- Katy Trail 1.8 mi away · 240 mi, crushed stone
- Centennial Greenway 1.9 mi away · 10.7 mi, paved
- Missouri Greenway 2.2 mi away · 8.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 7432066, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Fee Fee Greenway: Aquaport to Creve Coeur Park — Great Rivers Greenway · organization · checked Oct 15, 2026 Supports: endpoints (Maryland Heights Community Center, Aquaport, Dogport, McKelvey Woods, Creve Coeur Lake Memorial Park), 2.74 miles, paved and shady, Fee Fee Creek, management split at Rule Avenue between Maryland Heights Parks and St. Louis County Parks, amenities, I-270 and Dorsett Road location, Creve Coeur Connector to the Katy Trail, February 2026 wayfinding notice
- Fee Fee Greenway Plan — Great Rivers Greenway · organization · checked Oct 15, 2026 Supports: parallels Fee Fee Creek in the Missouri River watershed, link between Centennial Greenway and Missouri Greenway
- McKelvey Woods Trail Opens in Maryland Heights, Missouri — Terrain Magazine · web · checked Oct 15, 2026 Supports: first phase (McKelvey Woods Trail) one mile from Aquaport to McKelvey Woods Park, ribbon cutting by Great Rivers Greenway and the City of Maryland Heights scheduled for April 5, 2014, second phase planned two more miles to Creve Coeur Park near Marine Avenue
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.