Fish Lake Trail
Rail-trail in Washington · OpenStreetMap relation
Runs through Spokane and Cheney · Spokane County
Conditions now
Loading the weather near Four Lakes…
Forecast by the National Weather Service for Four Lakes · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West Milton Avenue mile 0 · restrooms directions to trailhead 1
- Parking at South Myers Park Road mile 10.2 directions to trailhead 2
- Parking at South Myers Park Road mile 10.2 directions to trailhead 3
- Parking at South Myers Park Road mile 10.3 · restrooms directions to trailhead 4
- Parking at South Cheney Spangle Road mile 14 · restrooms directions to trailhead 5
(opens in a new tab) About this trail
The Fish Lake Trail is a paved multi-use trail in Spokane County, Washington, running southwest from the city of Spokane toward Cheney and Fish Lake. The Washington Trails Association lists the open section at 7.6 miles one way, from a trailhead off US 195 at South Lindeke Street in Spokane to Scribner Road, with a planned total of 10.2 miles ending at Fish Lake Regional Park. The City of Spokane Parks Department is listed as manager.
The trail is a rails-to-trails project, a partnership of the City of Spokane Parks Department, the Spokane Regional Transportation Council and the Washington State Department of Transportation. The Columbia Plateau Trail, a state park trail on the abandoned Spokane, Portland and Seattle Railway right-of-way, runs from Cheney toward Pasco, and its paved 3.75-mile stretch between the Cheney and Fish Lake trailheads lies in the same area.
The surface is paved and ADA accessible with a mild uphill grade away from Spokane. The City of Spokane places a trailhead at Government Way and Milton Street.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
Former Union Pacific Railroad / BNSF Railway line. From Rail Lines of Washington State (WSDOT).
- Shade
25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Spokane International Airport, 6.9 km from the trail's middle, 71 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 34 40 49 57 67 74 84 84 74 58 42 34 Low °F 25 26 32 37 45 51 58 57 49 38 30 24 Precipitation, in 2 1.4 1.8 1.2 1.6 1.2 0.4 0.5 0.6 1.4 2.1 2.3 Snow, in 12.3 7.8 3.9 0.7 0.1 0 0 0 0.1 0.5 6.2 13.8 - On the National Register
- Marshall Bridge, Marshall · structure, listed 1995 · nomination file for Marshall Bridge
- Old maps
USGS topographic maps of the trail's middle go back to the 1901 Spokane sheet (1:125,000); the 1950 Spokane SW sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
2 Reddit threads about this trail, Jan 2024 to Jan 2026
- Riding Palouse to Cascades Trail east to west r/bikepacking · Jan 2024 · 9 comments
- Spokane WA or Cheyenne WY r/SameGrassButGreener · Jan 2026 · 19 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
Nearby trails
- Columbia Plateau Trail within 0.2 mi · 118 mi, crushed stone
- South Gorge Trail 0.6 mi away · 1.5 mi, paved
- Trolley Trail 0.6 mi away · 1.0 mi, dirt
- Spokane River Centennial Trail 0.9 mi away · 35.4 mi, paved
- Ben Burr Trail 2.6 mi away · 2.9 mi, paved
- Children of the Sun Trail 4.5 mi away · 10.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 1903965, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Fish Lake Trail - Washington Trails Association · organization · checked Oct 17, 2026 Supports: 7.6 miles, 10.2 planned, trailheads, paved, ADA, partnership, City of Spokane manager
- Columbia Plateau Trail State Park - Wikipedia · organization · checked Oct 17, 2026 Supports: SP&S right-of-way, Cheney to Pasco, 3.75-mile paved stretch between Cheney and Fish Lake trailheads
- Trails - City of Spokane Parks · organization · checked Oct 17, 2026 Supports: trailhead at Government Way and Milton Street
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.