South Gorge Trail
Greenway in Washington
Runs through Spokane · Spokane County
Conditions now
Loading the weather near Spokane…
Forecast by the National Weather Service for Spokane · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at West Clarke Avenue mile 0 directions to trailhead 1
- Parking at West Riverside Avenue mile 0.6 directions to trailhead 2
- Parking at North Cedar Street mile 1.2 directions to trailhead 3
- Parking at West Main Avenue mile 1.3 · water directions to trailhead 4
- Parking at West Riverside Avenue mile 1.4 · water directions to trailhead 5
Plan your visit
- By trainAmtrak: Spokane, WA (SPK) 0.5 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) About this trail
The South Gorge Trail is a paved path along the south bank of the Spokane River in Spokane, Washington, through the Peaceful Valley neighborhood. The City of Spokane built it with a Washington Wildlife and Recreation Program grant of $490,012 and a $680,500 local match, administered by the state Recreation and Conservation Office. The Spokane Centennial Trail organization says it opened in 2024 and completes a loop around the river gorge in downtown Spokane.
The trail runs about one mile between renovated riverside parks, with access from Peoples' Park, Glover Field Park, the Peaceful Valley Conservation Area and River Walk Park, and short spurs to the river. It links to the Spokane River Centennial State Park Trail at both ends and forms a loop of about 3.5 miles with it. TrailLink lists the surface as asphalt and concrete.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Spokane Felts Field, 9.4 km from the trail's middle, 62 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 38 42 51 60 70 76 87 86 76 60 45 37 Low °F 26 27 32 37 44 50 56 54 47 38 31 26 Precipitation, in 2 1.3 1.8 1.5 1.7 1.5 0.7 0.5 0.7 1.5 2 2.2 - On the National Register
- Germond Block, Spokane · building, listed 2014
- Browne's Addition Historic District, Spokane · historic district, listed 1976 · nomination file for Browne's Addition Historic District
- Riverside Avenue Historic District, Spokane · historic district, listed 1976 · nomination file for Riverside Avenue Historic District
- Peaceful Valley Historic District, Spokane · historic district, listed 1984 · nomination file for Peaceful Valley Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1901 Spokane sheet (1:125,000); the 1950 Spokane NW sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationSpokane Centennial Trail
Nearby trails
- Spokane River Centennial Trail within 0.2 mi · 35.4 mi, paved
- Fish Lake Trail 0.6 mi away · 13.1 mi, paved
- Ben Burr Trail 1.1 mi away · 2.9 mi, paved
- Trolley Trail 1.7 mi away · 1.0 mi, dirt
- Children of the Sun Trail 3.1 mi away · 10.2 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- South Gorge Trail — Washington Wildlife and Recreation Coalition · organization · checked Oct 17, 2026 Supports: City of Spokane, grant amounts, about one mile, 3.5-mile loop, access points
- Explore More Trails Nearby — Spokane Centennial Trail · organization · checked Oct 17, 2026 Supports: opened 2024, loop around gorge, Centennial Trail link
- South Gorge Trail — TrailLink · web · checked Oct 17, 2026 Supports: asphalt and concrete surface (from search result text; page not fetched)
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.