States › Ohio

Freedom Trail

Rail-trail in Ohio · OpenStreetMap relation

Runs through Akron, Tallmadge, Munroe Falls, Stow and Kent · Summit and Portage counties

Closed: Freedom Trail is listed as temporarily closed due to overhead bridge construction. The agency's live closure data still shows this notice as current. From summitmetroparks.org, checked Nov 25.

Conditions now

Loading the weather near Tallmadge…

Forecast by the National Weather Service for Tallmadge · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
8.8 mi 14.2 km1
On former railbed
3.3 mi 37%
Surface
Paved1
Status
Closed
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Wolf Ledges Parkway mile 0 directions to trailhead 1
  2. Parking at Hill Street mile 0.1 directions to trailhead 2
  3. Lot 69 mile 0.2 directions to Lot 69
  4. Parking at South Broadway Street mile 0.2 directions to trailhead 4
  5. Lot 29 mile 0.3 directions to Lot 29
  6. Lot 45 mile 0.3 directions to Lot 45
  7. Parking at East Mill Street mile 0.3 directions to trailhead 7
  8. Parking at East Bowery Street mile 0.3 directions to trailhead 8
  9. Lot 21 mile 0.4 directions to Lot 21
  10. Lot 40 mile 0.4 directions to Lot 40
  11. Lot 71 mile 0.4 directions to Lot 71
  12. Parking at South Prospect Street mile 0.4 directions to trailhead 12
  13. Parking at East Mill Street mile 0.4 directions to trailhead 13
  14. Lot 30 mile 0.5 directions to Lot 30
  15. Parking at South College Street mile 0.5 directions to trailhead 15
  16. Parking at South College Street mile 0.5 directions to trailhead 16
  17. Parking at East Market Street mile 0.6 directions to trailhead 17
  18. Parking at Perkins Street mile 0.7 directions to trailhead 18
  19. Parking at North Adams Street mile 1 directions to trailhead 19
  20. Parking at North Adams Street mile 1.4 directions to trailhead 20
  21. Parking at North Forge Street mile 1.5 directions to trailhead 21
  22. Freedom Trail Arlington Road Trailhead mile 1.7 directions to Freedom Trail Arlington Road Trailhead
  23. Parking at Sparhawk Avenue mile 3.1 directions to trailhead 23
  24. Parking at Brittain Road mile 3.1 directions to trailhead 24
  25. Parking at Sparhawk Avenue mile 3.1 directions to trailhead 25
  26. Parking at Brittain Road mile 3.2 directions to trailhead 26
  27. Parking at Brittain Road mile 3.2 directions to trailhead 27
  28. Parking at Brittain Road mile 3.2 directions to trailhead 28
  29. Parking mile 3.4 directions to trailhead 29
  30. Parking at Geneva Avenue mile 3.6 directions to trailhead 30
  31. Parking at Geneva Avenue mile 3.6 directions to trailhead 31
  32. Parking mile 4.3 directions to trailhead 32
  33. Parking at South Avenue mile 4.7 directions to trailhead 33
  34. Parking at Southeast Avenue mile 4.7 directions to trailhead 34
  35. Parking at East Avenue mile 4.8 directions to trailhead 35
  36. Parking at Erie Road mile 4.8 directions to trailhead 36
  37. Parking at Erie Road mile 4.8 directions to trailhead 37
  38. Parking at East Avenue mile 4.8 directions to trailhead 38
  39. Parking at Community Road mile 5 directions to trailhead 39
  40. Parking at Community Road mile 5.1 directions to trailhead 40
  41. Parking at Northeast Avenue mile 5.4 directions to trailhead 41
  42. Parking at Lions Park Drive mile 5.5 · water directions to trailhead 42
  43. Parking at Middlebury Road mile 8.4 · restrooms directions to trailhead 43
  44. Parking at Northeast Avenue mile 8.4 · restrooms directions to trailhead 44
  45. Parking at Middlebury Road mile 8.7 directions to trailhead 45
Freedom Trail (opens in a new tab)
Photo: pkoby · CC BY-SA 4.0 · Mapillary

About this trail

The Freedom Trail is a multipurpose rail-trail in Summit County, Ohio, built and managed by Summit Metro Parks, linking Akron and Tallmadge with Kent at the Portage County line; 8.8 miles are mapped here. It follows an unused railroad corridor, once Conrail's Freedom Secondary line, on land owned by METRO Regional Transit Authority, the University of Akron and Summit Metro Parks. Construction began in 2011 and has gone forward in phases: 4.2 miles in the first, 2 miles in the second and 1.8 miles in the third, completed in 2023 from Eastwood Avenue to East Mill Street.

The trail starts at the Middlebury trailhead at 1324 Middlebury Road in Kent and runs southwest through Tallmadge, where Lions Park on Northeast Avenue has restrooms, passes near Munroe Falls Metro Park, and enters Akron, with a trailhead at 390 North Arlington Street, before ending at Mill Street near the University of Akron. In 2025 the park district completed a short connector at the Kent end, a 10-foot-wide asphalt path with switchbacks and an accessible bridge over the CSX railroad, closing a 0.3-mile gap to the Portage Hike & Bike Trail, which continues east from Middlebury Road.

Phase 4, 1.4 miles, is under construction from Mill Street south behind the University of Akron near E.J. Thomas Hall and across the University Avenue bridge to Buchtel Avenue, with a small trailhead at Mill and Lincoln streets. A later stage is to bridge South Broadway and reach the METRO RTA station and the Ohio & Erie Canal Towpath Trail near the Spaghetti Warehouse. A bridge between Southwest Avenue and Brittain Road is being replaced with a concrete box culvert, closing that section; reopening was expected in May 2026. The trail is open from 6 a.m. to 11 p.m. for biking, hiking and cross-country skiing.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 49% of this route as a trail on former railroad right-of-way.

Shade

44% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Akron Fulton International Airport, 6.7 km from the trail's middle, 14 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F374049627381858477645241
Low °F212230405060646255443427
Precipitation, in1.81.42.52.83.63.73.633.22.52.32
Old maps

USGS topographic maps of the trail's middle go back to the 1906 Kent sheet (1:62,500); the 1958 Akron East sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 2533206, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Freedom Trail — Summit Metro Parks · organization · checked Oct 14, 2026
    Supports: connective corridor between Akron and Kent on METRO RTA land along an unused railroad corridor; Phase IV to the Towpath near the Spaghetti Warehouse; trailheads at 1324 Middlebury Rd. (Kent), Lions Park (245 Northeast Ave., Tallmadge, restrooms) and 390 N. Arlington St. (Akron); hours 6 a.m. to 11 p.m.; biking, cross-country skiing, hiking
  3. Bridging the gap: Freedom Trail Middlebury connection — Summit Metro Parks (July 17, 2025) · organization · checked Oct 14, 2026
    Supports: former Freedom Secondary line once owned by Conrail; corridor from E.J. Thomas Hall through Akron and Tallmadge near Munroe Falls Metro Park to Middlebury Road in Kent; completed connector of 10-foot asphalt with switchbacks and ADA bridge over the railroad, closing a 0.3-mile gap to the Portage Hike & Bike Trail; partners including CSX
  4. Project Updates — Summit Metro Parks (updated July 2026) · organization · checked Oct 14, 2026
    Supports: rideable from the Portage County line to Mill Street; Phase 4 under construction from Mill Street to Buchtel Avenue behind the University of Akron near EJ Thomas Hall and across the University Avenue bridge; trailhead at Mill and Lincoln streets; later link to the METRO RTA station and Towpath Trail; bridge replacement between Southwest Avenue and Brittain Road with a precast concrete box culvert, reopening expected May 2026
  5. Freedom Trail Phase III is complete in Akron — Scriptype (May 31, 2023) · web · checked Oct 14, 2026
    Supports: Phase III from Eastwood Avenue to East Mill Street completed 2023; land owned by METRO RTA, the University of Akron and Summit Metro Parks; construction began 2011; phase lengths 4.2, 2, 1.8 and 1.4 miles; South Broadway bridge in the final phase

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.