States › Ohio

Rubber City Heritage Trail

Rail-trail in Ohio · OpenStreetMap relation

Runs through Akron · Summit County

Conditions now

Loading the weather near Akron…

Forecast by the National Weather Service for Akron · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.2 mi 3.5 km1
On former railbed
0.8 mi 35%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East Market Street mile 0.6 directions to trailhead 1
  2. Parking at East Market Street mile 0.7 directions to trailhead 2
  3. Parking at 2nd Avenue mile 0.7 directions to trailhead 3
  4. Parking at East Market Street mile 0.7 directions to trailhead 4
  5. Parking at Mary Avenue mile 0.7 directions to trailhead 5
  6. Parking at East Market Street mile 0.8 directions to trailhead 6
  7. Parking at River Street mile 0.9 directions to trailhead 7
  8. Parking at River Street mile 1.2 directions to trailhead 8
  9. Parking at South Arlington Street mile 1.3 directions to trailhead 9
  10. Parking at South Case Avenue mile 1.3 directions to trailhead 10
  11. Parking at East Market Street mile 1.5 directions to trailhead 11
  12. Parking at East Exchange Street mile 1.5 directions to trailhead 12
  13. Parking at East Exchange Street mile 1.5 directions to trailhead 13
  14. Parking at East Exchange Street mile 1.5 directions to trailhead 14
  15. Parking at East Market Street mile 1.6 directions to trailhead 15
  16. Parking at East Exchange Street mile 1.6 directions to trailhead 16
  17. Parking at Roselawn Avenue mile 1.6 directions to trailhead 17
  18. Parking at East Market Street mile 1.7 directions to trailhead 18
  19. Parking at East Market Street mile 1.7 directions to trailhead 19
  20. Parking at Mason Avenue mile 2.2 directions to trailhead 20
  21. Parking at Crouse Street mile 2.3 directions to trailhead 21
Goodyear Hall-Ohio Savings and Trust Company, beside the trail (opens in a new tab)
Goodyear Hall-Ohio Savings and Trust Company, beside the trail · Photo: Andre Carrotflower · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Rubber City Heritage Trail is a planned 6-mile multi-use trail in Akron, Ohio, on the former Akron & Barberton Cluster Railroad, the ABC line that served the city's tire and rubber companies, including Goodyear, General Tire, BF Goodrich and Firestone. The City of Akron owns most of the corridor. The plan was developed by a partnership of the city, the Akron Metropolitan Area Transportation Study, The Goodyear Tire & Rubber Company, the Knight Foundation, the Ohio & Erie Canalway Coalition, the County of Summit and Summit Metro Parks, and the finished trail is to link the East Akron, Middlebury, University of Akron, South Akron, Firestone Park and Kenmore neighborhoods. It is being built in phases as funding becomes available.

Phase 1, about 0.9 mile, was dedicated on July 26, 2024. It runs from 3rd Avenue and the Middlebury Run Park trail to Exchange Street by Fire Station 2, with 10-foot-wide asphalt pavement, wayfinding and interpretive signs, small neighborhood plazas, benches and two conversions of rail bridges to pedestrian use. The largest is an 800-foot former rail viaduct over the Little Cuyahoga River, the active Wheeling & Lake Erie tracks, River Street and Factory Street. The trail is meant mainly as a neighborhood connector; visitors can find on-street parking along East Market Street.

Phase 2 is under construction along Exchange Street from the Arlington Street intersection to Huntington Avenue in Middlebury, at an estimated cost of $2.8 million, with completion expected by the end of 2026. It adds benches, pedestrian walkways, sidewalk connections to Middlebury Marketplace and a gateway plaza; the city had sought public comment on the phase in April and May 2024 and noted that all of its construction is on city land.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

19% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Akron Fulton International Airport, 3.8 km from the trail's middle, 8 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F374049627381858477645241
Low °F212230405060646255443427
Precipitation, in1.81.42.52.83.63.73.633.22.52.32
Old maps

USGS topographic maps of the trail's middle go back to the 1906 Kent sheet (1:62,500); the 1958 Akron East sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 21389903, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. City of Akron Seeking Comments on Phase 2 of the Rubber City Heritage Trail — City of Akron (April 26, 2024) · government source · checked Oct 14, 2026
    Supports: proposed multi-use trail linking East Akron, Middlebury, University of Akron, South Akron, Firestone Park and Kenmore; 6 miles of the former ABC rail line serving Goodyear, General Tire, BF Goodrich and Firestone; corridor majority owned by the city; Phase 2 from Exchange Street by Fire Station 2 to Huntington Avenue; comments requested by May 30, 2024; all construction on city land
  3. Rubber City Heritage Trail — Ohio & Erie Canalway Coalition · organization · checked Oct 14, 2026
    Supports: Akron & Barberton Cluster Railroad; planning partnership; phased as funding becomes available; Phase 1 about 0.9 mile dedicated July 26, 2024, from 3rd Avenue and the Middlebury Run Park trail to Exchange Street by Fire Station 2; 10-ft asphalt, signage, plazas, benches, two rail-to-pedestrian bridge conversions; 800-ft viaduct over the Little Cuyahoga River, W&LE tracks, River Street and Factory Street; connector for residents; on-street parking on East Market Street; Phase 2 under construction from Exchange and Arlington to Exchange and Huntington Avenue in Middlebury, about $2.8 million, completion by end of 2026, benches, walkways, sidewalk connections to Middlebury Marketplace, gateway plaza

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.