Garden Highway Bike Trail
Greenway in California
Runs through Sacramento · Sacramento County
Conditions now
Loading the weather near Sacramento…
Forecast by the National Weather Service for Sacramento · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at River Plaza Drive mile 0.9 · restrooms directions to trailhead 1
- Parking at River Plaza Drive mile 1 · restrooms directions to trailhead 2
Plan your visit
- By trainAmtrak: Sacramento, CA (SAC) 1.5 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Garden Highway Bike Trail is a paved path along Garden Highway in South Natomas, Sacramento, California. A 2019 City of Sacramento parks map of the trail's parcels shows it running beside Garden Highway past Gateway Oaks Drive and River Plaza Drive, under Interstate 5, and on toward the Discovery Park Trail and the Jedediah Smith Memorial Trail, across land held by the County of Sacramento and Reclamation District 1000.
TrailLink describes the route as the connector between the Natomas Westside Path and the American River Bike Trail: from Natomas Oaks Park, riders go a short distance east on Garden Highway to a trail that begins at Gateway Oaks Drive and runs east along the southern side of the highway to the entrance of Discovery Park. OpenStreetMap maps the path as a 12-foot asphalt cycleway, partly on the levee, and shows parking off River Plaza Drive. This record covers about 1.3 miles in several pieces.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Sacramento 5 ESE, 10.4 km from the trail's middle, 5 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 56 62 68 74 81 89 94 94 89 79 65 56 Low °F 41 44 47 49 54 59 61 61 59 53 45 41 Precipitation, in 3.9 3.6 2.8 1.4 0.9 0.2 0 0 0.1 0.9 1.8 3.5 Snow, in 0 0 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1907 Davisville sheet (1:62,500); the 1949 Sacramento West sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- American River Bike Trail 0.3 mi away · 36.5 mi, paved
- Two Rivers Bike Trail 0.5 mi away · 1.8 mi, surface unknown
- Gateway Oaks Trail 0.6 mi away · 1.5 mi, paved
- Fisherman’s Lake Trail 1.2 mi away · 1.4 mi, paved
- Sacramento Northern Bike Trail 1.6 mi away · 10.1 mi, paved
- Walter S. Ueda Parkway Trail 1.6 mi away · 3.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Garden Highway Bike Trail, Parcels - 2019 — City of Sacramento · government source · checked Oct 17, 2026 Supports: trail name, route beside Garden Highway past Gateway Oaks Drive and River Plaza Drive, under I-5, toward the Discovery Park Trail and Jedediah Smith Memorial Trail, County of Sacramento and Reclamation District 1000 parcels
- Natomas Westside Path — TrailLink · web · checked Oct 17, 2026 Supports: connector from Natomas Oaks Park via Garden Highway, trail from Gateway Oaks Drive east along the south side of Garden Highway to the Discovery Park entrance, link to the American River Bike Trail
- Garden Highway Bike Trail — OpenStreetMap · web · checked Oct 17, 2026 Supports: 12-foot asphalt cycleway, levee section, parking off River Plaza Drive, extent of this record
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.