States › California

Two Rivers Bike Trail

Greenway in California

Runs through Sacramento · Sacramento County

Conditions now

Loading the weather near Sacramento…

Forecast by the National Weather Service for Sacramento · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.8 mi 3.0 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at North 5th Street mile 0.6 directions to trailhead 1

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Jibboom Street Bridge from river in 2004 (opens in a new tab)
Jibboom Street Bridge from river in 2004 · Photo: Ken Lund from Reno, Nevada, USA · CC BY-SA 2.0 · Wikimedia Commons

About this trail

The Two Rivers Bike Trail, as OpenStreetMap names this record, is Phase I of the City of Sacramento's Two Rivers Trail, a levee-top trail on the American River in Sacramento, California, between Tiscornia Park and State Route 160, completed in 2006. The project, named for its origin at the confluence of the Sacramento and American rivers, took shape with a Two Rivers Trail Concept Plan completed in 2001; the city's aim is a continuous network of paved, accessible multi-use trails linking the Sacramento River and American River parkways. It is a levee greenway, not a rail-trail.

This record maps about 1.9 miles, with access near North 5th Street. Later pieces include a Sutter's Landing segment from 28th Street to the eastern edge of Sutter's Landing Park, completed in 2016, and Phase II, about 2.4 more miles to the county trail at the H Street Bridge, which the city lists as completed in 2026. Phase III, to close most of the gaps between the Phase I and Phase II segments, was in planning and design, with final design scheduled for spring 2026 to spring 2027 and construction for summer 2027, depending on funding. Phase IV, a crossing of the westerly Union Pacific tracks, had a feasibility assessment in 2024.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

10% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Sacramento 5 ESE, 8.1 km from the trail's middle, 0 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F566268748189949489796556
Low °F414447495459616159534541
Precipitation, in3.93.62.81.40.90.2000.10.91.83.5
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Sacramento sheet (1:125,000); the 1954 Sacramento East sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Two Rivers Trail Project — City of Sacramento Public Works · government source · checked Oct 17, 2026
    Supports: Phase I levee-top trail Tiscornia Park to SR 160 completed 2006; name from the confluence; 2001 concept plan; network of paved, accessible multi-use trails linking the parkways; Sutter's Landing segment 2016; Phase II 2.4 miles to H Street Bridge, construction completed 2026; Phase III gaps and timeline; Phase IV UPRR crossing feasibility 2024
  3. OpenStreetMap ways for this trail — OpenStreetMap contributors · web · checked Oct 17, 2026
    Supports: record name, mapped length about 1.9 miles, access near North 5th Street

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.